Virtual Media: Installing Operating Systems Remotely

Virtual Media: Installing Operating Systems Remotely

Virtual Media allows you to install an operating system using a remote ISO file, without requiring any physical media on the server. This article explains the technology, supported hardware, and limitations when bandwidth is low.

BMC Security: The Underestimated Point of Entry

BMC Security: The Underestimated Point of Entry

BMCs operate independently of the operating system and are therefore often overlooked, while vulnerabilities such as CVE-2013-4786 or CVE-2021-39296 remain unpatched. This article assesses the current threat landscape.

IPMI Replacement: The Migration Path to Redfish

IPMI Replacement: The Migration Path to Redfish

IPMI is no longer being developed; Redfish has been considered its official successor since 2020. This article describes a four-phase migration path and highlights the limitations of the transition.