Article 14 of the Cyber Resilience Act (CRA) has applied since 11 September 2026. Anyone placing connected machines, controllers, gateways or software on the EU market must report actively exploited vulnerabilities and severe security incidents to ENISA and the competent CSIRT within 24 hours. This also applies to products that have been running at customer sites for years. For management, heads of product development and IT managers in machine and plant engineering, intralogistics and among manufacturers of control and edge components, this means that the reporting chain has to work now, and not only once conformity assessment under the new rules begins.
The CRA reporting requirement is primarily a detection issue. Only those who know within a day which shipped product versions contain an exploited vulnerability, and in which countries they are installed, can report it. That takes three things: a software bill of materials (SBOM) for every shipped version, a daily automated check against vulnerability reports, and a defined process with roles, deputies and access to the reporting platform. This also covers a large part of the obligations that apply from December 2027.
| Stage | Actively Exploited Vulnerability | Serious Security Incident |
|---|---|---|
| Early Warning | Within 24 hours of becoming aware of the issue, in consultation with the member states in which the product was made available | Within 24 hours of becoming aware of the issue, indicating whether a malicious act is suspected |
| Notification | Within 72 hours, including the nature of the exploit and the measures taken | Within 72 hours, including an initial assessment and corrective actions |
| Final Report | No later than 14 days after a correction becomes available | Within one month of the 72-hour notification |
What Has Been in Effect Since September 11
The regulation generally takes effect on December 11, 2027; however, Article 14 takes effect as early as September 11, 2026 (Art. 71, para. 2). The reporting requirement expressly covers all products with digital elements that were placed on the market before December 11, 2027 (Art. 69(3)), including the installed base. A vulnerability is considered to be actively exploited if there is reliable evidence that an attacker has exploited it without the system owner’s consent (Art. 3 No. 42). In addition, you must inform the affected users; otherwise, the CSIRT may do so (Art. 14, para. 8). Violations of Article 14 may be punishable by a fine of up to 15 million euros or 2.5 percent of global annual revenue (Art. 64(2)) (Regulation (EU) 2024/2847).
Reports are submitted via ENISA's Single Reporting Platform, which has been in operation since September 11, 2026 (ENISA, 11 September 2026). The competent body is the CSIRT of the Member State in which decisions on the cybersecurity of your products are mainly taken (Art. 14(7)). For manufacturers with their main establishment in Germany, CERT-Bund at the BSI is responsible (BSI).
is all the time you have for the early warning after becoming aware of an actively exploited vulnerability, including the Member States in which the product was made available. The deadline makes no allowance for weekends or legacy devices.
Regulation (EU) 2024/2847, Art. 14 and Art. 69, October 2024
Worked example: the 24-hour deadline at a manufacturer of shuttle systems
In mechanical and plant engineering, control systems remain in service for ten to twenty years, and firmware versions are often frozen after acceptance testing. Here is a calculated example using assumed values: A manufacturer of shuttle systems for automated small-parts warehouses has three generations of control systems in the field, totaling 14 approved firmware versions, installed at customer sites in nine EU countries. Each version includes Linux, an OPC UA server, and several hundred open-source components.
On Friday afternoon, a vulnerability in a widely used TLS library appears in the Known Exploited Vulnerabilities catalogue of the US agency CISA. Without a bill of materials, the team has to open the build archive or image for each of the 14 firmware versions and check the library version. At two hours per version, that is 28 working hours before the second question even starts: which customer in which country is running which version today? With an SBOM for each release, the first query takes minutes. The result might be six affected versions across two generations. If a register of installed versions per customer is also maintained, the list of countries for the early warning is settled as well. The real gap is often in service. Many machine builders know what they shipped, but not what is actually running after field updates.
Your Options: Cost and Risk
| Option | Effort | Costs | Risk |
|---|---|---|---|
| Do nothing | None | None until an emergency arises | Deadline is missed, fines of up to 2.5 percent of annual turnover possible, disadvantage in supplier audits |
| On-call duty with well-maintained component lists in tables | Two to four weeks | Low | Lists become outdated with every release; knowledge is tied to specific individuals |
| SBOM in the build pipeline, matching with open-source tools such as OWASP Dependency-Track | Six to twelve weeks for the first product line | Resources, especially internal time | You are responsible for operation and maintenance; old builds without a reproducible build require rework |
| Commercial Platform for Vulnerability Management | Four to eight weeks of orientation | Ongoing licensing costs | Integration with in-house builds and service data remains a project task |
Regardless of the tool, from December 2027 Annex I Part II requires a software bill of materials in a commonly used machine-readable format covering at least the top-level dependencies. Security updates must also be provided separately from functional updates where technically feasible. The BSI Technical Guideline TR-03183 is more specific (BSI). Part 2 requires a separate SBOM for each software version, generated during the build process, in either the CycloneDX or SPDX formats. Part 3 stipulates separate roles and functional mailboxes for PSIRT and CSIRT within the vulnerability management process; these roles must not be held by a single person, except in the case of micro-enterprises.
Which approach suits which installed base
If you have a manageable number of product lines and a modern build pipeline, generating the SBOM directly from the build is the fastest route. If many older generations are in the field whose builds can no longer be reproduced, start with the shipped images: a retrospective analysis of the firmware yields a bill of materials that is sufficient to check whether a product is affected. If parts of the installed base lack an update path, add it to the to-do list for December 2027, because the final report depends on an available fix.
CRA Reportability Check for a Product LineIn three weeks, you will receive an overview of your product versions in the field, including their support periods; an SBOM in CycloneDX format for the current release of a product line directly from your build pipeline; a configured daily comparison against CVE reports and the KEV catalog; a reporting process with defined roles, delegation, and templates for the 24- and 72-hour reports, as well as a prioritized list of open items through December 2027. The check is a technical assessment, not a legal review. Initial consultation: 30 minutes, free of charge, response within one business day.
Frequently Asked Questions
Does the reporting requirement also apply to machines that were delivered before 2026?
Yes. Pursuant to Article 69(3), Article 14 applies to all products with digital elements within the scope of application that were placed on the market before December 11, 2027.
Do we have to report every new CVE in a library we use?
No. You are required to report actively exploited vulnerabilities in your product and serious security incidents. However, you must be able to determine quickly and transparently whether an exploited vulnerability affects your product. Starting in December 2027, you will also be required to address all vulnerabilities without delay.
Where do manufacturers from Germany and Austria file their reports?
Via ENISA's Single Reporting Platform. The notification goes to the coordinating CSIRT of the Member State in which decisions on the cybersecurity of the products are mainly taken. In Germany, this is CERT-Bund at the BSI; in Austria, the CSIRT designated there as coordinator.
The Next Step
torck develops software for industry and commerce, from the build pipeline to production: Custom Software Development. How older plants can be connected securely is shown on our page Plant Monitoring. How the obligations for operators and data fit together is covered in these articles: NIS2 in Production, EU Data Act for Machine Data and Modernize or Replace Legacy Software. Schedule an Initial Consultation.