JetBrains Update Following the eMudhra Incident: Why Operating System Patches Don't Protect the IDE

JetBrains Update Following the eMudhra Incident: Why Operating System Patches Don't Protect the IDE

A JetBrains update has been due since October 30, 2026 on every computer with IntelliJ IDEA, Rider, ReSharper, or another JetBrains IDE, because the private keys of eight eMudhra intermediate certificates are compromised. This also applies to software teams at machine builders, suppliers, intralogistics providers, and retailers. Heads of IT and software development now decide whether to update once or move standalone installations to the Toolbox App.

Short answer

Since October 30, 2026, JetBrains has been urging users to update its IDEs, ReSharper, other .NET tools, Gateway, and the Toolbox App, because otherwise these tools will continue to trust the eight compromised eMudhra intermediate certificates. IDE versions up to 2025.1 and the Toolbox App up to 3.7 will not receive a fix; the 2025.2.6.* updates do not yet protect the built-in browser, so it should be disabled until a hotfix is available. An operating system update will not help here, because the tools check against their own trust stores.

Corrected versions, as of November 3, 2026. The 2025.2.6.* builds only include the JBR fix; JetBrains does not list a 2025.2 build for Rider and ReSharper. Source: JetBrains Security Blog
Product Corrected in
IntelliJ IDEA 2026.3 RC, 2026.2.4, 2026.1.5.1, 2025.3.6.2, 2025.2.6.4
PyCharm, PhpStorm, RubyMine, WebStorm 2026.3 RC, 2026.2.4, 2026.1.5.1, 2025.3.6.2, 2025.2.6.3
Rider 2026.3 EAP 9, 2026.2.4, 2026.1.5.3, 2025.3.5.3
ReSharper 2026.3 EAP9, 2026.2.4, 2026.1.5.3, 2025.3.5.3
Additional .NET Tools The latest version in each case
CLion 2026.3 RC, 2026.2.4.1, 2026.1.5.2, 2025.3.6.3, 2025.2.6.3
GoLand 2026.3 RC, 2026.2.4, 2026.1.5.1, 2025.3.5.2, 2025.2.6.3
DataGrip 2026.3 RC, 2026.2.6.1, 2026.1.4.1, 2025.3.6.1, 2025.2.6.1
DataSpell 2026.1.3.1, 2025.3.3.1, 2025.2.4.1
RustRover 2026.3 EAP 8, 2026.2.5, 2026.1.4.1, 2025.3.7.1, 2025.2.6.1
Gateway 2026.3 RC, 2026.2.4, 2026.1.4, 2025.3.3, 2025.2.6
Toolbox App 3.9.1, 3.8.2
Background service jetbrainsd 0.9.9728

Cause of the eMudhra Incident and Status of the Blocks

On October 17, 2026, a security researcher reported that the private keys for eight intermediate certificates issued by the eMudhra certification authority could be derived from the public certificates. Each of these keys was less than 256; six of the certificates are intended for TLS certificates on websites, and two are for code signing (Help Net Security, October 21, 2026). eMudhra attributes this to a faulty script used during key generation in April 2025 and states that none of these certificates issued certificates to customers. Our sources do not independently confirm this.

Firefox and Chrome blocked the certificates on October 17, Microsoft platforms on October 20, and Apple products on October 22 (Incident page by Dennis Jackson, Mozilla). According to the October 28 update, the git, curl, and python3 tools included with macOS continue to trust these certificates. It is not known whether anyone has misused the keys since April 2025. As of October 30, JetBrains was not aware of any exploits targeting users of its tools.

Why JetBrains IDEs Trust eMudhra Certificates Despite the Windows Update

A trust store is a list of root certificates that a piece of software trusts. JetBrains tools use their own trust stores in three locations that are not affected by any Windows, macOS, or Linux patches (JetBrains, October 2026):

  • JetBrains Runtime (JBR): The IDEs, the Toolbox App, Gateway, and ReSharper verify certificates against the trust store of this bundled Java runtime. JetBrains has integrated Oracle's fixes for CVE-2026-91403 and CVE-2026-114820.
  • Built-in browser (JCEF): Starting with the patched 2025.3 versions, it retrieves certificate updates from Chrome via Google's update server; this is tracked separately as CVE-2026-118696.
  • The jetbrainsd background service: Its list is built into the service; JetBrains tracks the fix as CVE-2026-118697. If a tool that includes jetbrainsd 0.9.9728 is installed or updated and then started, the service is fixed for all of that user's JetBrains tools.
Limitations of the Available SourcesJetBrains describes an attacker on the network path who impersonates websites and services to which the tools establish connections. The advisory does not specify which connections are involved, nor does it indicate whether packages or plugins would be affected. For Java runtimes, Adoptium cites signed code as a potential risk in addition to TLS connections (Adoptium, October 27, 2026).

Implications for Developer Machines, Build Servers, and Project JDKs

For an attack to occur, someone must be able to intercept network traffic. Firefox, Chrome, Edge, and Safari enforce Certificate Transparency and, according to the incident page, could not have been attacked. Many other programs do not enforce it.

Developer machines hold access to repositories, registries, and cloud accounts, which is why they belong in the same priority level as build servers. Project JDKs, Node.js, Python, and Go bring their own trust stores, as JetBrains points out. In our assessment, the same applies to container images. For Java, the fix depends on the vendor (OpenJDK). Sources differ regarding the emSign Root CA G1 certificate: Oracle and OpenJDK remove it, while Adoptium leaves it in Temurin's trust store.

Who Makes Decisions Regarding JetBrains Updates

The head of software development decides this week which teams must stay on which IDE version. This requires a list of the versions on each computer and of the projects tied to an older version.

The head of IT decides whether standalone installations stay or the Toolbox App becomes the standard, and checks whether proxies allow traffic to Google's update servers. Proxies that intercept TLS also need an updated trust store; otherwise, according to the incident page, all clients behind them remain vulnerable.

For management: No Windows update protects JetBrains tools; they require their own update or, for older versions, a migration. For the approach we recommend, we estimate 6.5 to 13 person-days for 60 computers.

Options for JetBrains Installations and the Effort Involved

Options, torck's own assessment, as of November 3, 2026
Option Effort Costs Risk
Update Existing Installations Minutes per computer plus a reboot Low Forgotten standalone installations remain unpatched
Replace standalone installations with the Toolbox App 20 to 40 minutes per computer, estimate Internal Time Project JDKs and build images are not covered
Manually clean up the Trust Store and disable JCEF According to JetBrains, about five minutes per IDE Markdown and HTML previews, Jupyter output, and some plugins are not working An incorrect path leaves the computer unprotected without any warning; jetbrainsd is not covered
Replace versions up to 2025.1 Depending on the plugins and project integration Internal time; license fees vary depending on the contract Tests and plugins must run on the new version
Do nothing None None for now Forged certificates are still accepted as valid by the tools

We recommend the Toolbox App as the standard because otherwise multiple versions of the same IDE tend to remain on many computers. It updates IDEs automatically when the "Update all tools automatically" option is enabled. Standalone installations only report updates; someone must install them manually (JetBrains Rider Documentation). According to JetBrains, anyone staying with the Toolbox App should uninstall existing standalone installations and reinstall them through it (Toolbox App FAQ). Centralized configuration of versions and plugins also requires JetBrains IDE Services.

For applications that rely on very old runtime versions, there is a guide to Modernization of Legacy Software.

Sample calculation for a software team with 60 developer workstations

Assumptions, freely chosen: 60 computers with standalone installations of Rider 2025.3 or later and IntelliJ IDEA 2025.2 or later, and 20 build images with their own JDK. We estimate the inventory at one to two person-days. At 20 to 40 minutes per computer, the move to the Toolbox App takes 20 to 40 hours, or 2.5 to 5 person-days. Rebuilding and testing the build images, at one to two hours per image, takes 2.5 to 5 person-days. Verifying against the test addresses on the incident page takes half a day to a full day.

In total, this amounts to an estimated 6.5 to 13 person-days. The main cost drivers are the number of individual installations and build images. You should also factor in downtime during the restart and, if older versions are added, licensing costs.

Common Pitfalls with JetBrains Updates and Java Trust Stores

Built-in browser: In versions 2025.2.6.*, its protection is missing until a hotfix is released. If the network blocks Google's update server, it remains unprotected even in newer, fixed versions. In both cases, JetBrains recommends disabling it via the registry key ide.browser.jcef.enabled.

Rejected servers: The updated runtime no longer trusts four root certificates, including AAA Certificate Services. According to JetBrains, connections to servers with such a certificate chain fail in rare cases; the server's operator must then replace the certificate. Disabling certificate validation is not a solution, as warned by Cloudflare (October 20, 2026).

Java on Debian and Ubuntu: The system's Java keystore is not regenerated when the system certificates are updated; the OpenJDK project and Canonical describe the necessary steps (Ubuntu Blog).

The vendor's instructions are authoritative. Test updates in a test environment first.

Initial Consultation on the JetBrains Update and Bundled Trust Stores30 minutes, free of charge, response within one business day. We’ll determine which of your tools, JDKs, and build images come with their own trust stores and what needs to be addressed first. Please bring someone from your development or operations team who is familiar with your tools. Afterward, you can decide whether your team will handle the update or if torck will manage the migration.

Request a first call

Frequently Asked Questions

Is a Windows update enough to address the compromised eMudhra certificates?

A Windows update is not sufficient for JetBrains tools because the IDEs, Toolbox App, Gateway, and ReSharper use their own runtime trust stores.

How much does it cost for a team to switch to the JetBrains Toolbox App?

We estimate the move at 20 to 40 minutes per computer, which means 2.5 to 5 person-days for 60 computers. Including the inventory, build images, and verification, the total is 6.5 to 13 person-days.

What applies to JetBrains IDEs version 2025.1 and earlier?

IDE versions up to 2025.1 will not receive a fix; JetBrains requires an update to a fixed version. If you cannot do this immediately, manually clean up the trust store, disable the built-in browser, and update jetbrainsd separately.

The Next Step

Our approach is described on the page Professional Services for Software Operations. Related decisions are covered in the articles GitLab Security Vulnerability: Update, Check, or Rebuild Servers and Node2Shell and .NET 8 end of support. The conversation will help you assess your tools and determine the appropriate next step, without any sales pitch. Request an assessment.

Sources and Status of the Review

  • JetBrains, Compromised eMudhra Certificates: Update Your JetBrains IDEs, ReSharper, .NET Tools, Toolbox App, and Gateway Now, October 30, 2026: JetBrains Security Blog
  • Dennis Jackson (Mozilla), eMudhra Intermediate CA Compromise, October 20, 2026, with an update on October 28, 2026: Incident Page
  • Mozilla, "Protecting Firefox Users Following the Compromise of eMudhra Intermediate Certificates," October 20, 2026: Mozilla Security Blog
  • Oracle, Security Alert CVE-2026-91403, October 21, 2026: Oracle
  • Oracle, Security Alert CVE-2026-114820, October 24, 2026: Oracle
  • OpenJDK, Compromised Certificates, and OpenJDK Java Runtimes, no date, accessed November 3, 2026: OpenJDK
  • Adoptium, October 2026: Eclipse Temurin releases address the eMudhra CA compromise, October 27, 2026: Adoptium
  • Help Net Security, "eMudhra Security Blunder Left Trusted CA Signing Keys Exposed to Anyone," October 21, 2026, updated October 23, 2026: Help Net Security
  • Cloudflare, 8 eMudhra certificates have been compromised, October 20, 2026: Cloudflare Blog
  • Canonical, eMudhra CA Vulnerability Fixes Available, October 20, 2026, updated: Ubuntu Blog
  • JetBrains, JetBrains Rider Update, October 2026: Rider Documentation
  • JetBrains, Toolbox App FAQ, July 2026: Toolbox App Documentation

All information was verified on November 3, 2026. If the situation changes, we will update this post.

Questions about this post?

Just a couple of sentences about your situation will suffice. The person responding builds these kinds of systems himself.

We'll respond within one business day.torck · Code mit Drehmoment
Florian Blischke
Managing Director at torck · Over 20 years of software development experience
Florian Blischke is the managing director of torck, based in Maxhütte-Haidhof near Regensburg. He has been working in software development for over 20 years. His focus is custom software, data and AI for industry and retail, ranging from the integration of physical processes and IoT to cloud architecture and data- and AI-driven systems. torck works with its own nearshore team in Rabat. At torck, he oversees projects including the Jouvoli energy platform and the KVM Fleet fleet management product. torck develops software at its locations in Maxhütte-Haidhof, Vienna and Rabat and focuses on software that actually works in operation.

Are you facing the same question?

Since 2017, we have been building software for industry and retail from Maxhütte-Haidhof near Regensburg, with teams in Vienna and Rabat. An initial consultation takes 30 minutes and costs nothing. Afterwards you will know whether the project is worth pursuing, even if the answer is no.

More Articles