A TORCK PRODUCT
Connect every asset. Predict every kilowatt. Take action before costs arise.
Jouvoli is the open, auditable, and AI-powered platform that combines industrial monitoring, SCADA control, and energy management in accordance with ISO 50001.
While 90% of the industrial data collected goes unused and a single hour of unplanned downtime costs from $39,000 to over $2M depending on the industry, Jouvoli leverages predictive maintenance to increase equipment uptime by 10–20% and cut maintenance costs by 5–10%.
THE PROBLEM
90% of the industrial data collected goes unused.
1
An average of 27 hours of unplanned downtime per facility per month
90% of data unused / 27 hrs downtime/mo
A single hour of downtime costs from $39,000 to over $2M, depending on industry.
$39k–$2M+ per downtime hour
3
Predictive maintenance increases uptime by 10–20%, cuts maintenance costs by 5–10%, and reduces planning effort by 20–50%.
+10–20% uptime, −5–10% cost (PdM)
Jouvoli bridges all three gaps with a single, open command center—and replaces the 3–4 standalone solutions (SCADA, BI, compliance, energy) that most facilities run in parallel.
Unified monitoring across solar, wind, BESS, hydrogen, biomass, and steel facilities. Resolution of less than one second; data archiving for 1–5+ years.
AI-powered forecasts with 90–95% daily accuracy (MAPE) over a 72-hour horizon. Production-ready MLOps with automatic retraining.
Soft-Logic runtime for SCADA, peak load shaving, and automated device control. Complements your existing PLCs (Siemens S7, Rockwell, Beckhoff)—it does not replace them. Continues to operate locally even without a cloud connection. Complete audit trail.
Monitoring, SCADA control, and the ISO 50001 energy management system share a common data model. No integration effort required; no need to export data between tools.
15+ industrial protocols out of the box: OPC UA, MQTT, Modbus RTU/TCP, S7comm, EtherNet/IP, PROFINET, IEC 61850, IEEE 1547, SunSpec, OCPP, BACnet, KNX, REST, CAN bus, and more.
Developed in accordance with ISO 50001 by a team of PECB ISO 50001 Lead Implementers. Every control action, every forecast, and every EnPI calculation is fully traceable.
Fixed-price pilot program using your existing sensors. The same platform scales from a single location to your entire fleet, with no migration effort required when upgrading to a higher package.
Designed for funding under
BAFA EEW Module 3:
45 % for small businesses, 35 % for medium-sized businesses, and 25 % for large businesses. The license, sensors, implementation, and training are eligible for funding.
Documents
10–25% lower energy costs through real-time monitoring, automatic peak load curtailment, and weather-based scheduling. A single dashboard replaced five separate solutions—unplanned downtime was reduced by half.
650+ component types live via RFID through 4 variant-specific manufacturing paths implemented. From planning simulations to the SCADA system running on the shop floor—all within a few weeks.
PACKAGES
Includes:
MOST POPULAR
Includes:
Includes:
Annual license (CAPEX) and on-premises deployment available for BAFA-funded rollouts.
Deployment: Cloud · Edge + Cloud · On-Premises.
HOW JOUVOLI FITS INTO THE TORCK PORTFOLIO
Jouvoli is one of two scalable products from torck, developed and operated by the same engineering organization with more than 120 engineers in Germany, Austria, and Morocco, which is also responsible for torck’s Professional Services projects.
This means:
Accuracy, security, patches, roadmap—it's all in the hands of the team that built it.
Cloud, edge, or on-premises—your choice, your data.
The engineers who lead Torck's industrial software projects will also deliver your 6-week pilot.
CONTACT
Talk to the Jouvoli team about a 6-week fixed-price pilot, using sensors you already have.