Key-Person Risk: When System Knowledge Depends on a Single Person

Key-Person Risk: When System Knowledge Depends on a Single Person

A key-person risk in IT develops quietly. A system failure can usually be fixed. It is far more serious when only a single person knows how the system actually works. This only becomes apparent when that one person gets sick, quits, or is simply unavailable while on vacation, and then an area grinds to a halt that no one had previously considered at risk.

Short answer

A key-person risk in IT arises when system knowledge depends on a single person, and no one else can keep operations running if that person is unavailable. The bus factor describes how many people would have to be unavailable for an area to come to a standstill. In the worst case, it is one. Access Management, Documentation, and Pair Work reduce this risk.

How a Key-Person Risk Arises in IT

The bus factor is a simple but powerful metric. It describes how many people would have to be absent before a department in the company comes to a standstill. The smaller this number, the more vulnerable the organization is to illness, resignations, or simply extended vacations.

Knowledge monopolies extend far beyond access credentials. They include configurations, system dependencies, and undocumented workarounds that have evolved over the years, solutions that, at some point, even a single person can hardly explain in full, such as SAC describes (SAC, 2026). Anyone who thinks that a password manager solves the problem underestimates just how much knowledge actually exists only in a person's mind.

The shortage of skilled workers is further exacerbating this situation. According to Bitkom There is a shortage of approximately 109,000 IT professionals in Germany, and filling these positions takes a correspondingly long time (Bitkom, 2025). When a company loses a key employee, it is rarely able to hire someone with comparable expertise on short notice, even if the budget is available.

109.000

There is a shortage of IT professionals in Germany. If a key employee is unavailable, it takes a correspondingly long time to fill the position.

Bitkom, 2025

Where Key-Person Risk Is Greatest in Practice

In IT, a key-person risk most commonly arises in three scenarios. The first involves a single person who built a central system on their own years ago and has been the only one to know every corner of it ever since. The second is a small IT department where, for cost reasons, no real backup was ever planned. The third is an externally procured system for which all knowledge resides with a single in-house contact person, while the company has long since switched from the original service provider.

A recurring pattern emerges in the projects we take on. It is precisely the most reliable employees who are least likely to be represented, because they usually solve problems on their own before anyone else even notices there was one. It is precisely this reliability that masks the risk until the person is actually unavailable and no one knows where to start.

From a business perspective, risk is rarely factored into calculations. A production or logistics failure is quickly quantified in euros per hour, but a days-long outage of an internal system, for which no one else is responsible, doesn’t appear on any risk list until it actually occurs. This becomes particularly evident in the first few weeks after an acquisition, when a new team suddenly has to rely on established systems. This article describes how to organize this phase Post-Merger IT Integration: The First 100 Days.

What Countermeasures Increase the Bus Factor

Proper access management is the simplest step, and yet the one most often neglected. Access should be tied to roles rather than individuals, so that when someone leaves the organization, no systems become inaccessible and no one has to guess which password is still valid where.

Operational documentation is the more time-consuming but more effective approach. It doesn't need to explain every line of code, but it must document the architecture, the key dependencies, and the known workarounds that otherwise only one person would remember.

Pair programming shares knowledge as work progresses, without the need for a separate documentation session. Two people working together on a system automatically develop a second set of insights, even if neither of them had intended it to be a knowledge transfer.

An emergency manual answers the question of what to do during the first few hours of an outage when the very person who would normally answer that question is unavailable. An external second opinion, similar to that provided in a technical due diligence Before a takeover, an external review is conducted to determine whether these measures are actually effective or whether the knowledge monopoly has been dissolved only on paper.

Countermeasures and Their Effect on the Bus Factor
Action How it changes the monopoly on knowledge
Access Points on Wheels No system becomes inaccessible when one person leaves
Operational Documentation Architecture, dependencies, and known workarounds are documented in writing
Pair Work A second understanding develops during normal operations, without a scheduled appointment
Emergency Manual The first few hours of an outage are handled even without the key person
Second Opinion from an Outside Source Shows whether the monopoly on knowledge has truly dissolved or exists only on paper
What Cannot Be Fully Resolved
Knowledge can never be fully externalized; some portion of it will always remain tied to individuals. A realistic goal is the ability to act in an emergency. The demand for complete documentation of every little detail usually requires more effort than it provides in terms of security.

Have Your Bus Factor Assessed
An initial assessment of the most critical knowledge silos within a company can often be outlined in a single conversation. Initial consultation: 30 minutes, free of charge, response within one business day.

Get in touch

Frequently Asked Questions

How can you determine your own bus factor?

A simple exercise helps. For each important system, ask who else, besides the person currently in charge, could operate it without spending days researching how. If the answer comes down to a single name, the bus factor is one. This exercise can be repeated for each critical system individually, and the results often differ significantly. Those who approach the exercise soberly, rather than sugarcoating the situation, usually find more than one system with this pattern.

How can you keep records without disrupting operations?

Short, fixed time slots work better than a one-time, large-scale documentation project that rarely gets finished amid the day-to-day business. One hour per week, consistently devoted to the most critical systems, yields more over the course of several months than an ambitious effort that fizzles out after two weeks. It also makes sense to start with the system whose failure would be the most costly, not the one that’s easiest to document.

What to do when the key person resigns?

The notice period becomes the most important resource. Reserve it for knowledge transfer from the start rather than only for handing over ongoing tasks. Regular sessions with the rest of the team, a written summary of the most important relationships, and a test run in which someone else completes a typical task without assistance show whether the transfer has actually worked. If the notice period is short, it helps to limit the transfer to the two or three systems whose failure would be most costly, rather than working through everything evenly.

A key-person risk in IT rarely affects only the IT department. It extends into production, logistics, and customer service. It can rarely be assessed reliably from within. Whoever holds the knowledge monopoly often does not see their own gap. torck brings its own development teams from Maxhütte-Haidhof, Vienna, and Rabat, who actively build and document knowledge during day-to-day operations rather than simply handing over a checklist. The contractual partner is the German company torck GmbH. Anyone who wants to have their own bus factor assessed can do so in a Initial Consultation discuss.

Schedule a meeting

Questions about this post?

Just a couple of sentences about your situation will suffice. The person responding builds these kinds of systems himself.

We'll respond within one business day.torck · Code mit Drehmoment
Florian Blischke
Managing Director at torck · Over 20 years of software development experience
Florian Blischke is the managing director of torck, based in Maxhütte-Haidhof near Regensburg. He has been working in software development for over 20 years. His focus is custom software, data and AI for industry and retail, ranging from the integration of physical processes and IoT to cloud architecture and data- and AI-driven systems. torck works with its own nearshore team in Rabat. At torck, he oversees projects including the Jouvoli energy platform and the KVM Fleet fleet management product. torck develops software at its locations in Maxhütte-Haidhof, Vienna and Rabat and focuses on software that actually works in operation.

Are you facing the same question?

Since 2017, we have been building software for industry and retail from Maxhütte-Haidhof near Regensburg, with teams in Vienna and Rabat. An initial consultation takes 30 minutes and costs nothing. Afterwards you will know whether the project is worth pursuing, even if the answer is no.

More Articles