Anyone comparing LoRaWAN, 5G, and cable for industrial sensor applications often underestimates just how much the number of measurement points alone influences the decision. A temperature sensor on a tank requires a different connection than a control loop on an injection molding machine. A comparison based solely on range falls short.
As a rule of thumb, LoRaWAN is suitable for infrequent measurements over large areas using battery-powered devices, Cables for All Control-Related Applications and a 5G campus network is only necessary once a certain density of real-time applications is reached. Wi-Fi remains the pragmatic choice for mobile devices with moderate requirements.
LoRaWAN, 5G and Wired Networks in Industry: A Comparison of the Criteria
Such a comparison starts with the application. Range and data rate are mentioned first, but they are rarely the deciding factors. In practice, three other factors matter: battery life at hard-to-reach measurement points, the cost per sensor over its entire service life, and immunity to interference in buildings with a lot of steel.
Added to this are latency, operating costs, and safety requirements. A control loop with millisecond-level requirements is often ruled out from the start for wireless technology. An application that accesses recipes or design data requires different safety measures than a simple level sensor.
LoRaWAN: Infrequent Measurements Over Large Areas
LoRaWAN transmits small data packets over long distances while consuming very little power. According to the provider, TEKTELIC Starting in 2025, such networks will have a range of up to 15 kilometers in rural areas and 2 to 5 kilometers in built-up areas, with data rates ranging from 0.3 to 50 kilobits per second. Depending on the transmission interval, the batteries will last 5 to 10 years.
These values apply under ideal conditions. In buildings with a lot of metal, the usable range decreases significantly because steel structures reflect the signal and multipath propagation interferes with transmission. For a tank level that changes hourly, this is not an issue. For an application that requires an up-to-date value every minute, LoRaWAN is the wrong choice, regardless of what the datasheet says.
The cost per measurement point is usually lowest in this scenario because a single gateway covers large areas, and there are no recurring fees when operating your own network. Operating costs remain low as long as the number of sensors does not run into the thousands.
5G Campus Network: Allocations, Fees and Cost-Effectiveness
For local 5G networks, the Federal Network Agency has been making the 3.7 to 3.8 gigahertz frequency band available since 2019, exclusively for internal use on private premises. As of November 2025, the agency had recorded in its Overview of Allotment Holders 484 assignments in this frequency band. The fee starts at a base amount of 1,000 euros and increases based on bandwidth, duration, and area.
A 5G campus network delivers latency in the low single-digit millisecond range, predictable coverage even in halls with a lot of metal, and guaranteed quality of service for many devices. These features cost significantly more than Wi-Fi, both in terms of initial purchase and system integration with existing control technology.
A campus network only becomes cost-effective once a certain density of applications is reached: many autonomous guided vehicles in a given area, frequent handoffs between radio cells, or so many sensors that Wi-Fi reaches its capacity limit. For just a handful of measurement points, the investment is rarely justifiable. According to a Bitkom survey from 2024 Campus Networks Monitoring Report In 85 percent of cases, the interconnection of production facilities is the main reason for having a dedicated 5G network.
Wi-Fi: Practical, but Prone to Interference in Halls with a Lot of Metal
Wi-Fi based on the 802.11 standard covers most mobile applications and is available on nearly every device. In factory floors, the technology reaches its well-known limits. Metal shelves, machines, and steel doors reflect radio waves, causing the faster 5-gigahertz band to lose significantly more range than the older 2.4-gigahertz band. In the congested 2.4-gigahertz band, only three non-overlapping channels are available in Europe.
With careful planning, industrial-grade access points, and sufficient density, Wi-Fi can be operated reliably even in demanding industrial facilities. For handheld scanners, mobile terminals, and sensors with moderate requirements, it remains the most cost-effective solution. However, for demanding real-time applications, such as motion control for autonomous guided vehicles, the handover latency between access points, which often exceeds 50 milliseconds, is considered a weak point.
Cables with PoE: The Standard for All Control-Related Applications
A wired Ethernet connection with Power over Ethernet remains the most reliable option when latency and determinism are critical. Data and power are transmitted over a single cable; structured cabling in accordance with DIN EN 50173 limits copper runs to 100 meters, with fiber optics used for longer distances.
For control loops, safety-critical signals, and anything else a PLC needs to access every millisecond, cable therefore remains the right choice. The downside lies in the installation costs: Every new line requires cable routing, cut-ins, and, in existing facilities, often a time-consuming retrofit. In new construction, this is less of an issue because the cable routes are planned from the start.
Narrowband Alternatives: NB-IoT and mioty
In addition, there are other narrowband technologies, each with its own strengths. NB-IoT operates in the licensed cellular spectrum and remains reliable over all distances, but incurs ongoing fees for the SIM connection. mioty, developed at Fraunhofer IIS, distributes each message across many small radio bursts over time and frequency, making it more resistant to interference in crowded frequency bands. The mioty Alliance states its energy consumption as 17.8 microwatt-hours per message.
For a company without an existing wireless network, mioty is worth considering in situations where many battery-powered sensors are transmitting simultaneously in a confined space, such as in fuel storage monitoring.
As of November 2025, the Federal Network Agency had allocated this many local 5G frequency assignments in the 3.7 to 3.8 gigahertz range nationwide.
Federal Network Agency, Overview of Allocation Holders, 11/2025
| Technology | Range | Data Rate | Battery life | Immunity to Interference in Environments with a Lot of Metal |
|---|---|---|---|---|
| LoRaWAN | Up to 15 km of rural areas, 2 to 5 km of built-up areas | 0.3 to 50 kbit/s | 5 to 10 years | Low to moderate |
| 5G Campus Network | Entire company premises, available for planning | Double-digit Mbit/s range | Grid-connected | High, licensed spectrum |
| Wi-Fi (2.4 / 5 GHz) | A few tens of meters per access point | High | Grid-connected | Moderate, prone to damping |
| Cables (Ethernet, PoE) | Up to 100 m per copper segment | Very high | Unlimited, network-based | Very high |
The ranges and data rates listed apply under good radio conditions and vary significantly depending on the surrounding environment, building structures, and sources of interference. For highly mobile applications with a large number of simultaneous users, such as factory logistics involving hundreds of forklifts, this comparison serves only as a starting point. It is not a substitute for on-site network planning.
Select a connection for your own measurement point
The best technology for a new measurement point depends on the range, battery life, and immunity to interference in the specific facility. Initial consultation: 30 minutes, free of charge, response within one business day.
Frequently Asked Questions
Is a 5G campus network worth it for a single production site?
That depends on the density of deployment. With just a few measurement points or sensors used purely for information, the investment rarely pays off because the costs of purchase and system integration usually exceed the operating costs saved. As soon as several autonomous guided vehicles, robot-assisted cells, or a three-digit number of end devices are brought together, the cost-benefit analysis often tips in favor of 5G, especially if the facility contains a lot of metal and Wi-Fi is already reaching its limits there.
Can LoRaWAN replace Wi-Fi in manufacturing?
No. LoRaWAN transmits small amounts of data infrequently and with high latency, whereas Wi-Fi provides the bandwidth needed for video, tablets, and applications that require continuous communication. The two technologies complement each other in most facilities; they rarely compete directly with one another in the same use case. A facility often uses both technologies in parallel: the narrowband network for scattered measurement points in outbuildings and Wi-Fi for mobile terminals on the shop floor.
What role does security play in choosing a connection?
A 5G campus network operates in licensed, exclusive spectrum and can be separated from the public cellular network. Wired networks benefit from established segmentation between IT and OT, which is already standard in many plants. For wireless networks in unlicensed spectrum, the configuration decides. Encryption and network segmentation are mandatory here. Anyone connecting sensors with access to production data should plan for security from the very beginning.
torck integrates sensors and existing systems without rushing to commit to a specific wireless technology. Because the teams in Maxhütte-Haidhof, Vienna, and Rabat implement OT connectivity, gateways, and the data path all the way to the dashboard themselves, the specific measurement point determines the technology used, rather than a predefined product portfolio. Learn more about the implementation at Plant Monitoring, for on-machine analysis in the article „Edge Computing in Manufacturing“ and for plant effectiveness in the article Improving OEE with Machine Data.