A torck PRODUCT· First MSP release in Q4 2026 · Early Access available

KVM Fleet | Remote Infrastructure Management for MSPs

KVM Fleet | Remote Infrastructure Management for MSPs

KVM Fleet is torck's platform for out-of-band management of KVM-over-IP devices across multiple locations. A single dashboard replaces hardware KVM, remote desktop, mobile device management, and mesh VPN. If the operating system crashes and TeamViewer fails, the hardware KVM takes over. Access will still be available even then.

KVM Fleet logo
KVM Fleet: fleet overview dashboard with device status, alerts and active sessions

THE PROBLEM

Four tools, four logins,
a blind spot

Every MSP runs the same overlapping stack across its customers’ environments: Remote Desktop for day-to-day support, hardware KVM/IPMI for when things go wrong, an MDM for endpoints, and a VPN that ties it all together. Each tool has its own login, its own audit trail, and its own invoice and none of them help when the OS itself stops responding.

1

Tool Flood

Four vendor stacks per customer, four invoices

EXCESSIVE LICENSING COSTS,

DOUBLE ADMINISTRATIVE BURDEN

2

Compliance Gap

Fragmented audit trails across all tenants

SLOW FORENSICS,

COMPLIANCE GAPS

3

Access Vulnerability

On-site intervention is necessary when remote tools fail

HUNDREDS OF EUROS PER INCIDENT,

LOST SLA CREDITS

4

Recovery Gap

No access if the OS crashes at 2 a.m.

EXTENDED DOWNTIME,

ESCALATIONS, MISSED SLAS

THE SOLUTION

A platform with four access levels and an audit trail.

A platform with four access levels and an audit trail.

KVM Fleet consolidates the entire stack into a single multi-tenant dashboard, with tiered access and an always-available fallback:

KVM Fleet: device list with status, IP address, group and health score
Circular Design Element

Hardware KVM

BIOS access via a compact KVM appliance and peer-to-peer browser streaming. Works even if the OS is unresponsive.

KVM Fleet desktop client: connected device with VPN IP, latency and connection time
Circular design element, bottom left

Remote Desktop

Software Session for Daily Support, Featuring Credential Vaulting and Session Recording.

KVM Fleet on a smartphone: device list with KVM access
Circular design element, top left

Mobile Device Management

Native enrollment and policy enforcement for Windows, macOS, Linux, and Android, all managed from a single console.

KVM Fleet: creating a notification channel for alerts in Slack

Mesh VPN

A zero-trust overlay network that connects locations, devices, and operators, without device-specific VPN profiles. (Available starting with the Enterprise Edition.)

UNIQUE FEATURES

What Makes KVM Fleet Special

What Makes KVM Fleet Special

No loss of access

Hardware KVM is the fallback layer, not an add-on. If the OS fails, the same dashboard still allows access.

Built for MSPs from the very beginning

Multi-tenant architecture with a five-tier role-based access model (Organization → Chapter → Team → Operator → End User). Each customer fleet is managed through a single console, with isolation between tenants.

Self-hosted by default; optionally EU-hosted SaaS

Run KVM Fleet on your own infrastructure or use the SaaS solution hosted in Germany. In either case, session data, recordings, and device status remain within the EU.

4-in-1: One platform instead of four

KVM, Remote Desktop, MDM, and Mesh VPN share a single dashboard and user model. Most MSPs use this to replace three to five existing tools.

True cross-platform MDM

Windows, macOS, Linux, and Android. Registration, configuration, and policy management are all handled through a single console. No operating system-specific tools are required.

GDPR by Design

Developed in Germany, hosted in the EU, with no data transfers to third countries by default. Compliance reporting and tamper-proof audit trails included.

Where the product is located

Transparency Regarding the Level of Maturity

Transparency Regarding the Level of Maturity

KVM Fleet is located in the final phase of development. The first issue of MSP will be published in Q4 2026. The platform is already in use internally within torck's Professional Services division. The following features have been validated in production:

Today:

Hardware KVM console with peer-to-peer browser streaming

SSH session management with credential vaulting

Power control (On/Off/Restart) via networked PDUs

Icon Quality and Safety

Five-level role-based access control

Session recording and tamper-proof audit trails

Icon: Concept and Consulting

Alerts and SLA tracking with export

Multi-tenant device management with groups, tags, racks, and locations

On the road to the launch in Q4 2026:

Cross-platform MDM (Windows, macOS, Linux, Android)

MSP Billing and Customer Onboarding Processes

Mesh VPN (Enterprise Edition)

EARLY ACCESS FOR MSPS

What You Get as an Early Access MSP

What You Get as an Early Access MSP

A limited number of Early Access partners have now joined the program. They receive preferential pricing, direct influence on the roadmap, and dedicated support from the torck engineering team.

Up to 25 devices

A guided pilot program involving up to 25 devices, with full support from the torck engineering team.

Get special rates

Preferential pricing guaranteed for 12 months after the official launch.

Direct influence on the roadmap

Your feedback will shape the feature set at launch. You have a direct say in the product roadmap.

EDITIONS (AT LAUNCH)

Three editions, one platform

Starter

For small teams

Includes:

Professional

For medium-sized MSPs

Includes:

Enterprise

For large MSPs / enterprises

Includes:

Prices will be announced at launch.
Early Access partners receive guaranteed preferential pricing for the first 12 months following the general launch.

HOW KVM FLEET FITS INTO THE torck PORTFOLIO

A torck product, supported by torck Professional Services

A torck product, supported by torck Professional Services

KVM Fleet is one of two scalable products from torck, developed and operated by the same engineering organization (with over 100 employees in Germany, Austria, and Morocco) that is also responsible for torck’s professional services projects. This means:

torck is responsible for the software

Accuracy, security, patches, and the roadmap are the responsibility of the team that built it.

You decide where it plays

Your own infrastructure or torck's EU-hosted SaaS.

Pilot projects are implemented by the same teams

The teams responsible for torck's industrial software projects are also your direct point of contact.

Get notified at release

One email when KVM Fleet is released

One email when KVM Fleet is released

Not ready for Early Access yet? We will write to you exactly once, when the first MSP edition is released (planned for Q4 2026). The email covers:

  • Launch date and available editions
  • Features of the first MSP edition
  • Contact person for getting started

Request notification

One email at release, then we delete your details. Your address is stored in the EU and not passed on.

Be among the first MSPs to launch KVM Fleet.

The MSP edition launches in Q4 2026. A limited number of early-access partners are joining now, with preferential pricing, direct influence on the roadmap, and dedicated support from the torck engineering team.