Server hardware monitoring is designed to prevent a situation where a fan has been running slower than intended for weeks and no one notices until the server shuts down due to overheating. To do this, it continuously analyzes sensor data rather than waiting until a failure actually occurs to take action.
Server hardware monitoring retrieves temperature, voltage, fan speeds, and power consumption via IPMI or Redfish and makes these values available for analysis in Prometheus or Grafana. In addition, SMART attributes for hard drives and SSDs provide indications of impending failures, though only for a portion of actual failure cases.
Server Hardware Monitoring via IPMI and Redfish
Both IPMI and Redfish read the same basic data from the BMC: temperatures at various measurement points inside the chassis, voltages on the power rails, fan speeds, and the current power consumption (DMTF, Redfish Standard). Redfish aggregates these values into a structured sensor collection that can be queried via a REST interface, eliminating the need for anyone to write their own script to parse binary IPMI responses. Each sensor appears in the collection with its own identifier, current value, unit, and often the warning and critical thresholds specified by the manufacturer. A monitoring system only needs to understand this structure once to read it consistently for every server type, regardless of whether the firmware is from Dell, HPE, or Supermicro. The article describes how this same structure can also be used for servers at widely distributed locations. Remotely Manage Edge Locations: Keep Branches and Remote Offices Under Control.
For common monitoring systems, there are ready-made exporters that feed these values directly into Prometheus, allowing them to be displayed as a dashboard in Grafana, for both Redfish and IPMI. Integration thus largely involves configuration work rather than developing custom scripts. Nevertheless, the initial setup requires care: If an exporter runs with incorrect login credentials or a timeout that’s too short, individual servers may sporadically appear as unreachable even though they’re running perfectly. A thorough test run over several days before going live will reveal such configuration errors before they trigger a false alarm at night. If you’re planning a more fundamental switch from IPMI to Redfish, rather than simply reading sensor values from both protocols in parallel, you’ll find the steps to do so in this article IPMI vs. Redfish: Comparison and Migration Path.
What SMART Data Really Predicts
Since 2013, Backblaze has been publishing quarterly failure rates and SMART data from its own hard drive fleet, which has since become one of the largest publicly available data sets on this topic (Backblaze, Hard Drive Test Data). This continuous publication over more than a decade makes the data series one of the best-documented sources on the actual failure behavior of hard drives in continuous operation, far exceeding what individual manufacturers disclose. SMART attributes such as reallocated sectors or rising read error rates allow for limited prediction of impending drive failures. If one of these values rises continuously, it is advisable to replace the drive as a precaution before it actually fails.
Backblaze publishes quarterly failure rates and raw SMART data from its own hard drive fleet.
Backblaze, Hard Drive Test Data
In Practice: Setting Thresholds Without Triggering a Flood of Alerts
Not every sensor warrants its own alarm. Temperature, critical voltages, and the failure of a redundant power supply are exceptions because they immediately indicate a problem. Individual fluctuations in fan speed or brief spikes in power consumption, on the other hand, rarely warrant their own alarm because they occur constantly during normal operation. A threshold set too low will then trigger an alarm every night, which eventually no one will take seriously anymore.
Appropriate thresholds are based on the manufacturer’s specifications for the respective server type, not on a blanket value for the entire fleet. These thresholds can vary significantly between server models: A densely packed 1U system runs hotter during normal operation than a well-ventilated tower server. A uniform temperature threshold across the entire fleet therefore generates either too many or too few alerts, depending on which server type it was originally intended for.
The polling interval should be short enough to detect a genuine trend, and a few minutes are usually sufficient. An interval that is too short, on the other hand, places an unnecessary load on the BMC itself, which handles other tasks in addition to sensor polling. A good middle ground is usually one to five minutes, depending on how quickly a critical value can change in practice. In any case, the trend over time is more important than a single instantaneous value. A temperature that rises slowly over weeks reveals more about a developing problem than a single outlier, which could just as easily be due to a temporary load.
| Sensor | Alarming | Mostly uncritical |
|---|---|---|
| Temperature | Continued growth beyond the manufacturer's limit | Brief surge under heavy load |
| Suspense | Deviation outside the manufacturer's tolerance | Minimal fluctuation within the tolerance range |
| Fan speed | Failure of a fan in the redundant pair | Normal fluctuations with load |
| Power Consumption | Consistently operating near the power supply limit | Brief load spike during startup |
Where Server Hardware Monitoring Reaches Its Limits
SMART values can predict some drive failures in advance, but by no means all of them. Some drives fail without any warning in measurable values, while others show elevated error rates for weeks and keep running. Monitoring is therefore an early-warning system with gaps.
A functioning backup is therefore essential, regardless of how closely the sensor data is monitored. In the event that, despite all warnings, a system fails to boot, a method for recovery via the BMC is needed, as described in the article „Disaster Recovery with Out-of-Band Access.“.
Adjust alarm thresholds for your own fleet
A temperature threshold that works for a 1U system constantly triggers false alarms on a well-ventilated tower server. If you take the time to review your sensor configuration, you’ll usually spot such issues more quickly than by simply ignoring a growing number of alerts. Initial consultation: 30 minutes, free of charge, response within one business day.
Frequently Asked Questions
Which values should be monitored?
Temperature, critical power supply voltages, the status of redundant power supplies and fans, and the SMART attributes of the drives constitute a useful set of basic monitoring metrics. These values can be retrieved via IPMI or Redfish and cover the scenarios that most frequently lead to an actual failure.
How can you avoid a flood of alerts?
By triggering alerts only for values that actually indicate a problem, using thresholds based on manufacturer specifications rather than a blanket value for the entire fleet. Short-term fluctuations resulting from normal operation belong on the dashboard for trend monitoring rather than in the alert channel.
Is it possible to predict hard drive failures?
To some extent. SMART attributes, such as reallocated sectors or rising read error rates, provide indications of an increased risk of failure, but they do not detect every defect in advance. A drive that suddenly fails without warning is still possible despite monitoring, which is why redundancy remains necessary.
torck continuously monitors its own test fleet in Maxhütte-Haidhof, Vienna, and Rabat using the same sensor data described in this article, and regularly adjusts the thresholds if there are too many or too few alarms. In KVM Fleet uses this experience as the basis for evaluating the sensors in its own server fleet. The contract partner is the German company torck GmbH, and the project management team speaks German. Anyone who wants to have their own alarm logic checked for unnecessary noise should schedule a product demo or an initial consultation.