BMC Vulnerabilities in Supermicro and Dell: What to Patch First

BMC Vulnerabilities in Supermicro and Dell: What to Patch First

On October 26, 2026, the security firm runZero disclosed 21 additional vulnerabilities in out-of-band devices: eight in the management controllers (BMCs) of Supermicro motherboards, twelve in Dell iDRAC, and one in the Avocent ACS8000 and ACS800 console servers from Vertiv. Supermicro classifies the most severe vulnerability as critical and has released patched firmware for over 400 products; Dell has not yet released any. This affects IT management at industrial and commercial companies with servers in factories, warehouses, and data centers, as well as operations management at managed service providers, two weeks after the vulnerabilities in HPE iLO.

Short answer

Supermicro servers starting with the X11 and H11 series get the BMC update from the vendor's list now. Until it is installed, disable IPMI over LAN wherever it is not needed. X9 and X10 boards are not on the list, so the only options there are isolation and replacement. Dell iDRAC still has no fix. Block UDP port 623 for IPv6 as well and review the Redfish accounts. Make ACS8000 and ACS800 console servers reachable only from the management network, starting now.

Impact by Manufacturer, as of October 27, 2026. Sources: Supermicro Security Advisory (October 26, 2026), runZero Advisories (October 26, 2026), Vertiv Release Notes ACS8xxx 2.32.6 (September 15, 2026)
Manufacturer and Product Most severe findings Fix according to vendor
Supermicro, X11 through X14 and H11 through H14 motherboards Unsigned Commands in a Running IPMI Session (CVE-2026-18450), Elevation of Privileges to Administrator (CVE-2026-65220) Firmware version for each board in the list; two boards still pending
Supermicro, X9 and X10 Boards CVE-2026-18450 and CVE-2026-65220 observed by runZero Not on the list
Dell iDRAC9 and iDRAC10, one finding also iDRAC7 and iDRAC8 IPMI reachable via IPv6 despite being disabled, SQL injection by Redfish users with Login privilege No advisory with fixed versions found
Vertiv Avocent ACS8000 and ACS800 Commands with Root Privileges Without Logging In (CVE-2026-65184) Version 2.32.6 lists security improvements without CVE references

What runZero Found and What Manufacturers Offer

The most serious vulnerabilities involve Supermicro. In CVE-2026-18450, the controller accepts commands in an existing IPMI session that are neither signed nor encrypted, even though the session has negotiated both. Supermicro rates this at 9.8, while runZero rates it at 8.1, because it requires the identifier of a running session. CVE-2026-65220 elevates a low-privileged account to administrator privileges, CVE-2026-65219 opens a restricted session, including access to the server’s serial console, without a password. With administrator privileges, it is also possible to read from and write to the controller’s memory (runZero, 10/2026). Supermicro specifies the corrected firmware version for each affected board, usually 01.74.26 or 03.75.35 for X11 boards, and states that it is not aware of any exploitation in the field (Supermicro, 26.10.2026).

runZero rates the twelve Dell findings as low to medium. On iDRAC10, IPMI over LAN remains reachable via IPv6 even when it is disabled in the settings (CVE-2026-65196). Users with the lowest Redfish privilege can use SQL injection to read data outside their authorization (CVE-2026-65186, CVE-2026-65189). The same private TLS key for automatic provisioning ships in iDRAC7 through iDRAC10 (CVE-2026-65194). As of October 27, 2026, we have not found a Dell security advisory listing fixed versions for these CVEs.

On the ACS8000 and ACS800 console servers, an attacker can execute commands with root privileges without logging in as soon as they access the web interface (CVE-2026-65184, CVSS 9.8 according to runZero, investigated in version 2.32.4). Version 2.32.6, available since September 15, 2026, lists security improvements to the Serial Viewer, without a CVE number (Vertiv, 09/2026).

What's Still Up in the AirFor two Supermicro boards, the version is still listed as TBD. Vertiv has not confirmed whether version 2.32.6 patches the Avocent vulnerability. The Dell and Avocent findings are based on firmware analysis and virtualized tests; the impact may be less significant on actual hardware. As of October 27, 2026.

What a compromised BMC means for your operations

Anyone who takes control of a BMC can shut down the server, open the console or mount external storage without antivirus or monitoring noticing. A console server is also connected to the serial ports of switches, firewalls and servers. Anyone who takes control of it can reach all of these devices.

The Supermicro list also includes boards for GPU servers such as the X13DEG series and compact embedded boards of the X12SDV and X14SDV series. So check AI servers and small servers on shop floors and in branches as well.

402

entries are in the list of fixed firmware in the Supermicro advisory. X9 and X10 boards are missing, although runZero observed two of the IPMI vulnerabilities on them.

Supermicro and runZero, October 2026

An example from IT operations: a managed service provider runs 260 servers for 14 manufacturing and retail customers, 150 of them with Supermicro boards (110 from the X11 to X13 series, 40 older X10) and 110 Dell servers with iDRAC9 and iDRAC10, plus six ACS8000 console servers in two data centres. Updating the 110 updatable Supermicro controllers one by one via the web interface takes about 20 minutes per device by our estimate, just under 37 hours in total. Distributed centrally via Redfish, what remains is one day of preparation and testing plus maintenance windows per customer. Three other tasks take more work: 40 X10 systems without an update have to move into the management network, 110 Dell controllers need an IPv6 rule and an account review until a fix is available, and for each customer it has to be recorded what was affected and when it was fixed. Customers that fall under NIS2 need this evidence.

Your Options: Effort, Costs, and Risks

Options for Action by Manufacturer, Our Own Classification, as of October 27, 2026
Option Effort Costs Risk
Supermicro update to the version listed by the manufacturer From a few hours to a few days, depending on the tool Mainly internal time Low, only the controller restarts
Disable IPMI over LAN and deactivate SMCRAKP mode Minutes per device, managed centrally via script Low Monitoring scripts that query IPMI must be migrated to Redfish
Dell iDRAC: Block UDP Port 623 for IPv4 and IPv6; Clean Up Redfish Accounts One to two days per environment Low Cannot be enforced without a firewall in front of the management network
Avocent: Web Interface Accessible Only from the Management Network; Update to 2.32.6 Hours per device Low Very old versions require the intermediate step via 2.14.4
Replace X9 and X10 systems Months, including the migration of workloads High, capital investment Migration Effort and Maintenance Windows in Production
Do nothing None None for now Servers and consoles can be taken over without being noticed

A sensible order: inventory across all vendors, isolate Avocent, update Supermicro, block IPMI, set the Dell rules, and put the replacement of X9 and X10 systems into the 2027 budget. How to plan updates across hundreds of controllers is described in the article Firmware Updates Across Hundreds of Servers.

Which approach fits which server landscape

With a handful of servers at one site, a manual update is enough. With many sites, such as a branch network or a supplier with several plants, a central inventory and a script-driven update via Redfish pay off. Managed service providers also need documented evidence for each customer.

X10 systems can continue to run if the controller is accessible only via the management network and IPMI remains disabled. In an emergency, a secondary path to the console is required, such as a hardware KVM with a switchable power strip. This article explains how to set up such a network Separating the management network.

Initial Discussion on the BMC Vulnerabilities at Supermicro and DellWe’ll review your management controllers and console servers, including their firmware and open services; determine which networks can access IPMI, Redfish, and the web interface, including via IPv6; and discuss options for systems that require correction, such as isolating them, providing emergency access via hardware KVM, or replacing them. 30 minutes, free of charge, response within one business day.

Request a first call

Frequently Asked Questions

Does the server need to restart for the Supermicro BMC update?

No. The update only restarts the management controller; the operating system and applications continue to run. The remote console will be briefly unavailable during this time, so the update should still be performed during a maintenance window.

Is it enough to disable IPMI over LAN?

For Supermicro, this covers most findings because they go through the IPMI service. For Dell iDRAC10, the setting alone is not enough because the service remains reachable via IPv6. There, also block UDP port 623 in the firewall in front of the management network.

Are HPE and Lenovo servers also affected?

HPE iLO was part of the runZero disclosure on October 13; for Lenovo XClarity Controller 2, runZero only documented an older vulnerability that has already been fixed. In addition, there are findings in OpenBMC, which is used in devices from several vendors. So inventory all controllers.

The Next Step

torck develops KVM Fleet as a platform for remote access to server fleets across many sites, with hardware KVM, power control and multi-tenant permissions. Managed service providers can test the platform in Early Access with up to 25 devices. For inventory, update planning and network separation, you are supported by our Professional Services. For more background information, see HPE iLO Vulnerabilities, BMC Security: The Underestimated Point of Entry and IPMI vs. Redfish: Comparison and Migration Path. Schedule an Initial Consultation.

Questions about this post?

Just a couple of sentences about your situation will suffice. The person responding builds these kinds of systems himself.

We'll respond within one business day.torck · Code mit Drehmoment
Florian Blischke
Managing Director at torck · Over 20 years of software development experience
Florian Blischke is the managing director of torck, based in Maxhütte-Haidhof near Regensburg. He has been working in software development for over 20 years. His focus is custom software, data and AI for industry and retail, ranging from the integration of physical processes and IoT to cloud architecture and data- and AI-driven systems. torck works with its own nearshore team in Rabat. At torck, he oversees projects including the Jouvoli energy platform and the KVM Fleet fleet management product. torck develops software at its locations in Maxhütte-Haidhof, Vienna and Rabat and focuses on software that actually works in operation.

Are you facing the same question?

Since 2017, we have been building software for industry and retail from Maxhütte-Haidhof near Regensburg, with teams in Vienna and Rabat. An initial consultation takes 30 minutes and costs nothing. Afterwards you will know whether the project is worth pursuing, even if the answer is no.

More Articles