Mixed AGV Fleets: Who Controls Robots from Different Manufacturers?

Mixed AGV Fleets: Who Controls Robots from Different Manufacturers?

On October 22, 2026, the technology group Körber acquired a stake in NAiSE GmbH, a software provider for vendor-neutral fleet management in intralogistics. On the same day, the TMG Intralogistik Kompass 2026 showed that, among all areas examined, in-plant transport is gaining the most in automation. Both developments bear on a decision that many plants and warehouses are facing right now: Who will control automated guided vehicles and mobile robots from different manufacturers in the future? This affects plant management in plant engineering, the logistics management of an automotive supplier, and the heads of intralogistics or digitalization who are putting the next robot fleet out to tender.

Short answer

A vendor-neutral master control system pays off as soon as a second vehicle manufacturer is added or vehicles share routes, doors, and elevators. Before your next procurement, decide which layer coordinates the fleets, and require VDA 5050 in a named version. But do not budget for the master control system alone: the standard explicitly does not cover integration with the WMS, MES, and door control, and in practice that is where most of the effort arises.

What VDA 5050 Covers and What It Does Not. Source: VDA 5050 Version 3.0.0, March 2026, Chapters 2 and 4; as of October 24, 2026
Area Covered by VDA 5050 Who has to solve it
Commands and status messages between the control system and the vehicle Yes, via MQTT version 3.1.1 or later using JSON Vehicle manufacturers and control system providers
Freely navigating robots, zones, shared paths Yes, new in version 3.0 Vehicle manufacturers and control system providers
Traffic logic: right of way, priorities, resolving deadlocks No Master control system, varies by product
Interfaces to WMS, ERP, MES, doors, and elevators No Operator, integrator, or proprietary integration layer
Functional safety and cybersecurity No Operators, manufacturers, internal guidelines

Körber's stake in NAiSE and VDA 5050 version 3.0

According to a press release from Körber, NAiSE’s fleet management software integrates automated guided vehicles (AGVs), autonomous mobile robots (AMRs) from various manufacturers, and manually operated industrial trucks on a common control level, regardless of which WMS, WES, or WCS is in use (Körber, Oct. 22, 2026). NAiSE will remain independent and continue to work with other integrators and vehicle manufacturers. One day earlier, the Otto Group reported that it had developed its own platform for its COALA project, which connects warehouse IT, robot control, fleet orchestration and building technology. For fleet management, the Otto Group relies on vendor-neutral solutions (Otto Group, 21.10.2026).

The technical basis for this is the VDA 5050 interface, which is jointly published by the VDA and the VDMA. Version 3.0.0 was released in March 2026 and, for the first time, incorporates freely navigating robots using a zone-based concept and shared paths (VDA, April 20, 2026). The specification follows semantic versioning: A major version increment introduces changes that are incompatible with older versions; version 3.0 includes, among other things, renamed parameters (VDA 5050 on GitHub).

2.20 out of 5

Maturity level of in-plant transport on a scale of 1 to 5, up from 1.85 in 2024. This is the largest increase of all technology fields surveyed, with an importance rating of 4.14. Respondents name poor data quality as the biggest obstacle.

TMG Consultants, TMG Intralogistik Kompass 2026, 10/2026

What mixed vehicle fleets mean for plants and warehouses

Most companies started with a pilot: a few under-ride robots supplying the assembly line, later driverless forklifts in goods receiving. Each manufacturer brings its own control system. As long as the fleets use separate routes, this works. As soon as they share intersections, gates or elevators, restricted zones are maintained by hand, and each fleet needs its own connection to the WMS and MES.

An example from a supplier plant: six under-ride AMRs from manufacturer A, four driverless forklifts from manufacturer B, three tugger trains from manufacturer C. The WMS, the MES, and the control of high-speed doors and the elevator all have to be connected. Without a common layer, that is three fleets times three systems, so nine interfaces that are built and tested individually and checked again with every update. With a common master control system, there are three vehicle connections via VDA 5050 and three IT interfaces, so six. If a fourth manufacturer is added, the number rises by three without a common layer and by one with it. If manufacturer B only speaks VDA 5050 version 2 while the master control system expects version 3, you also need a translator or a firmware update on the vehicle.

LimitationVDA 5050 is a recommendation, not a formal standard. According to the specification, its use is voluntary and non-binding. A manufacturer that states “VDA 5050” may support an older version or only some of the actions. Traffic logic, safety, and integration with your IT are expressly outside its scope.

Your Options: Effort, Costs, and Risks

Options for mixed vehicle fleets, our own assessment, as of October 24, 2026
Option Effort Costs Risk
Maintain manufacturer control on a fleet-by-fleet basis Small for a single manufacturer, but growing with each additional fleet Low at the start, interface costs per fleet Lock-in to the first manufacturer, manually maintained restricted zones on shared routes
Vendor-neutral fleet management software as a standard product Weeks to months for implementation and map synchronization License plus integration The VDA-5050 version and feature set must be compatible with each vehicle
Fleet manager from the WMS provider or general contractor Funds, if the WMS is being replaced anyway Often bundled into the overall project Lock-in shifts from the vehicle manufacturer to the software provider
Standard fleet manager plus your own integration layer to WMS, MES, and doors Funds, one-time allocation Development and operation of the layer Requires someone in-house to be in charge or a permanent partner
Do nothing None None for now Every new fleet becomes a separate project; expansions take longer and become more expensive

Whether an option works depends less on the master control system than on the data behind it: storage locations, load carriers, transfer points and door states must be correct in the WMS and MES, otherwise even the best fleet runs into nothing. This matches the TMG study’s finding on data quality.

Which master control system fits which operation

A facility with a single fleet and separate routes can get by with the manufacturer’s control system, but should already specify VDA 5050 in the tender so that a second manufacturer does not require a rebuild. Any facility that operates or plans to operate two or more manufacturers on shared routes needs a higher-level control system. Whether this comes from a specialized provider, the WMS provider, or a combination with an in-house integration layer depends on how often the layout, processes and systems change. Companies operating multiple plants benefit most from a unified integration layer, because connections can then be transferred from one location to another.

Integration Check for Your Vehicle Fleet in Ten Business DaysYou will receive an inventory of all vehicles, including the manufacturer, control system, and supported VDA 5050 version; a map of all interfaces to WMS, ERP, MES, gates, and elevators; a review of the master data for storage locations and load carriers; an architectural proposal including the options listed above, along with a cost estimate; and the requirements for your next RFP. Initial consultation: 30 minutes, free of charge, with a response within one business day.

Request an Integration Check

Frequently Asked Questions

Do all vehicles have to comply with VDA 5050?

No. Older vehicles without the interface can be integrated as a subsystem via an adapter or via their manufacturer’s control system. This adds integration effort and limits traffic management. For new purchases, you should specify the interface in the contract, including version number and scope of functions.

Do vehicles compliant with VDA 5050 Version 2 work with a master controller designed for Version 3?

It's not that simple. Version 3.0 is a major version update with incompatible changes, such as renamed parameters. Determine which versions the control system supports concurrently and whether the vehicle manufacturer offers an update.

Does a fleet manager replace the WMS?

No. The WMS determines what needs to be moved, while the master controller determines which vehicle will handle it and which route it will take. VDA 5050 does not specify the connection between the two; it must be built and maintained as part of the project.

The Next Step

Through custom software development Master control systems, WMS, ERP, and MES via open interfaces, and continues to operate the integration layer upon request. The page describes software for warehousing and production Intralogistics Software. Our experience with MQTT and control system integrations from our projects in the Plant Monitoring projects. To learn how to connect SAP and Dynamics, see ERP Integration: Connecting SAP and Dynamics to Custom Software, how to limit dependencies right in the contract, in Avoiding Vendor Lock-in, and how production and office IT come together, in OT-IT Integration. Schedule an Initial Consultation.

Questions about this post?

Just a couple of sentences about your situation will suffice. The person responding builds these kinds of systems himself.

We'll respond within one business day.torck · Code mit Drehmoment
Florian Blischke
Managing Director at torck · Over 20 years of software development experience
Florian Blischke is the managing director of torck, based in Maxhütte-Haidhof near Regensburg. He has been working in software development for over 20 years. His focus is custom software, data and AI for industry and retail, ranging from the integration of physical processes and IoT to cloud architecture and data- and AI-driven systems. torck works with its own nearshore team in Rabat. At torck, he oversees projects including the Jouvoli energy platform and the KVM Fleet fleet management product. torck develops software at its locations in Maxhütte-Haidhof, Vienna and Rabat and focuses on software that actually works in operation.