{"name":"torck","description":"code with torque","url":"https:\/\/www.torck.io","home":"https:\/\/www.torck.io\/en","gmt_offset":"0","timezone_string":"","page_for_posts":0,"page_on_front":518,"show_on_front":"page","namespaces":["oembed\/1.0","torck-matomo\/v1","deepl-for-translatepress\/api","faz\/v1","metricool\/v1","mosmcp\/v1","rankmath\/v1","rankmath\/v1\/setupWizard","rankmath\/v1\/an","torck\/v1","torck-mcp\/v1","torck-llm\/v1","webp-converter\/v1","elementor-mcp-composer\/v1.0.20","elementor-one\/v1","elementor\/v1","elementor-pro\/v1","torck-ats\/v1","wp-2fa-methods\/v1","wp-2fa-passkeys\/v1","wp-rocket\/v1","elementor-hello-elementor\/v1","rankmath\/v1\/ai-visibility","rankmath\/v1\/ca","rankmath\/v1\/in","rankmath\/v1\/status","pgmb\/v1","rankmath\/v1\/link-genius","elementor\/v1\/documents","elementor-ai\/v1","elementor\/v1\/feedback","rankmath-marketplace\/v1","mcp","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":{"application-passwords":{"endpoints":{"authorization":"https:\/\/www.torck.io\/wp-admin\/authorize-application.php"}}},"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/oembed\/1.0\/proxy"}]}},"\/torck-matomo\/v1":{"namespace":"torck-matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"torck-matomo\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-matomo\/v1"}]}},"\/torck-matomo\/v1\/urlmap":{"namespace":"torck-matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-matomo\/v1\/urlmap"}]}},"\/deepl-for-translatepress\/api":{"namespace":"deepl-for-translatepress\/api","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"deepl-for-translatepress\/api","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/deepl-for-translatepress\/api"}]}},"\/deepl-for-translatepress\/api\/settings":{"namespace":"deepl-for-translatepress\/api","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/deepl-for-translatepress\/api\/settings"}]}},"\/deepl-for-translatepress\/api\/translate":{"namespace":"deepl-for-translatepress\/api","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/deepl-for-translatepress\/api\/translate"}]}},"\/deepl-for-translatepress\/api\/translate-all":{"namespace":"deepl-for-translatepress\/api","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/deepl-for-translatepress\/api\/translate-all"}]}},"\/deepl-for-translatepress\/api\/usage":{"namespace":"deepl-for-translatepress\/api","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/deepl-for-translatepress\/api\/usage"}]}},"\/deepl-for-translatepress\/api\/validate":{"namespace":"deepl-for-translatepress\/api","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/deepl-for-translatepress\/api\/validate"}]}},"\/deepl-for-translatepress\/api\/translate-test":{"namespace":"deepl-for-translatepress\/api","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/deepl-for-translatepress\/api\/translate-test"}]}},"\/faz\/v1":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"faz\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1"}]}},"\/faz\/v1\/geo\/rulesets":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/geo\/rulesets"}]}},"\/faz\/v1\/geo\/rulesets\/(?P<id>[a-z0-9-]+)":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false}}}]},"\/faz\/v1\/geo\/overrides":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/geo\/overrides"}]}},"\/faz\/v1\/geo\/overrides\/(?P<country>[A-Za-z]{2})":{"namespace":"faz\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}]},"\/faz\/v1\/geo\/preview":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/geo\/preview"}]}},"\/faz\/v1\/geo\/status":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/geo\/status"}]}},"\/faz\/v1\/geo\/ipinfo-settings":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/geo\/ipinfo-settings"}]}},"\/faz\/v1\/geo\/pipl-attestation":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/geo\/pipl-attestation"}]}},"\/faz\/v1\/consent":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"token":{"type":"string","required":false},"can_refresh":{"type":"integer","required":false},"consent_id":{"type":"string","required":false},"status":{"type":"string","default":"partial","required":false},"categories":{"type":["object","array"],"default":[],"required":false},"url":{"type":"string","required":false},"banner_slug":{"type":"string","required":false},"policy_revision":{"type":"integer","required":false},"tc_string":{"type":"string","required":false},"gpp_string":{"type":"string","required":false},"geo_bootstrap":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/consent"}]}},"\/faz\/v1\/banner\/(?P<lang>[a-z0-9-]+)":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"lang":{"type":"string","required":true},"banner":{"type":"string","required":false}}}]},"\/faz\/v1\/amp-consent\/check":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"banner":{"type":"string","required":true},"scope":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/amp-consent\/check"}]}},"\/faz\/v1\/amp-consent\/update":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"banner":{"type":"string","required":true},"scope":{"type":"string","required":true},"ampUserId":{"type":"string","required":false},"consentStateValue":{"type":"string","required":false},"purposeConsent":{"type":"object","required":false},"purposeConsents":{"type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/amp-consent\/update"}]}},"\/faz\/v1\/cookie-policy\/settings":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookie-policy\/settings"}]}},"\/faz\/v1\/cookie-policy\/preview":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookie-policy\/preview"}]}},"\/faz\/v1\/cookie-policy\/suggest-services":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookie-policy\/suggest-services"}]}},"\/faz\/v1\/cookie-policy\/scaffold":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"jurisdiction":{"type":"string","required":true},"lang":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookie-policy\/scaffold"}]}},"\/faz\/v1\/cookie-policy\/detected-services":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookie-policy\/detected-services"}]}},"\/faz\/v1\/cookie-policy\/acknowledge-version":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"hash":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookie-policy\/acknowledge-version"}]}},"\/faz\/v1\/cookie-policy\/acknowledge-material-version":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"hash":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookie-policy\/acknowledge-material-version"}]}},"\/metricool\/v1":{"namespace":"metricool\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"metricool\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1"}]}},"\/metricool\/v1\/connected_brands":{"namespace":"metricool\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/connected_brands"}]}},"\/metricool\/v1\/connected_networks":{"namespace":"metricool\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/connected_networks"}]}},"\/metricool\/v1\/distribution\/(?P<metric>[^\/]+)":{"namespace":"metricool\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/metricool\/v1\/analytics":{"namespace":"metricool\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/analytics"}]}},"\/metricool\/v1\/realtime":{"namespace":"metricool\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/realtime"}]}},"\/metricool\/v1\/other_plugins_data":{"namespace":"metricool\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/other_plugins_data"}]}},"\/metricool\/v1\/do_plugin_action":{"namespace":"metricool\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/do_plugin_action"}]}},"\/metricool\/v1\/logout":{"namespace":"metricool\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/logout"}]}},"\/metricool\/v1\/get_notices":{"namespace":"metricool\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/get_notices"}]}},"\/metricool\/v1\/get_tasks":{"namespace":"metricool\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/get_tasks"}]}},"\/metricool\/v1\/dismiss_task":{"namespace":"metricool\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/metricool\/v1\/dismiss_task"}]}},"\/mosmcp\/v1":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mosmcp\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1"}]}},"\/mosmcp\/v1\/contact":{"namespace":"mosmcp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/contact"}]}},"\/mosmcp\/v1\/mcp":{"namespace":"mosmcp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/mcp"}]}},"\/mosmcp\/v1\/health":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/health"}]}},"\/mosmcp\/v1\/register":{"namespace":"mosmcp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/register"}]}},"\/mosmcp\/v1\/token":{"namespace":"mosmcp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/token"}]}},"\/mosmcp\/v1\/stats":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/stats"}]}},"\/mosmcp\/v1\/nhi":{"namespace":"mosmcp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/nhi"}]}},"\/mosmcp\/v1\/nhi\/(?P<uuid>[0-9a-f\\-]{36})":{"namespace":"mosmcp\/v1","methods":["PATCH","DELETE"],"endpoints":[{"methods":["PATCH"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/mosmcp\/v1\/me\/access":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/me\/access"}]}},"\/mosmcp\/v1\/nhi\/(?P<uuid>[0-9a-f\\-]{36})\/members":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/mosmcp\/v1\/roles":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/roles"}]}},"\/mosmcp\/v1\/rest-routes":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/rest-routes"}]}},"\/mosmcp\/v1\/nhi\/ability-owners":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/nhi\/ability-owners"}]}},"\/mosmcp\/v1\/audit":{"namespace":"mosmcp\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","minimum":1,"default":1,"required":false},"per_page":{"type":"integer","minimum":1,"maximum":100,"default":25,"required":false},"user_login":{"type":"string","default":"","required":false},"nhi_uuid":{"type":"string","default":"","required":false},"tool_name":{"type":"string","default":"","required":false},"status":{"type":"string","enum":["","success","failed","denied"],"required":false},"date_from":{"type":"string","default":"","required":false},"date_to":{"type":"string","default":"","required":false}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/audit"}]}},"\/mosmcp\/v1\/audit\/summary":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/audit\/summary"}]}},"\/mosmcp\/v1\/debug-logs":{"namespace":"mosmcp\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","minimum":1,"default":1,"required":false},"per_page":{"type":"integer","minimum":1,"maximum":100,"default":50,"required":false},"level":{"type":"string","enum":["","debug","info","warning","error"],"required":false},"channel":{"type":"string","default":"","required":false},"search":{"type":"string","default":"","required":false},"client_id":{"type":"string","default":"","required":false},"date_from":{"type":"string","default":"","required":false},"date_to":{"type":"string","default":"","required":false}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/debug-logs"}]}},"\/mosmcp\/v1\/debug-logs\/channels":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/debug-logs\/channels"}]}},"\/mosmcp\/v1\/debug-logs\/status":{"namespace":"mosmcp\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"enabled":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/debug-logs\/status"}]}},"\/mosmcp\/v1\/connectivity-test":{"namespace":"mosmcp\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/connectivity-test"}]}},"\/mosmcp\/v1\/connectivity-guide":{"namespace":"mosmcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/connectivity-guide"}]}},"\/mosmcp\/v1\/rest-bridge-settings":{"namespace":"mosmcp\/v1","methods":["GET","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PATCH"],"args":{"enable_create":{"type":"boolean","required":false},"enable_update":{"type":"boolean","required":false},"enable_delete":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/rest-bridge-settings"}]}},"\/mosmcp\/v1\/deactivation-feedback":{"namespace":"mosmcp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mosmcp\/v1\/deactivation-feedback"}]}},"\/rankmath\/v1":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1"}]}},"\/rankmath\/v1\/saveModule":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"module":{"type":"string","description":"Module slug","required":true},"state":{"type":"string","description":"Module state either on or off","enum":["on","off"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/saveModule"}]}},"\/rankmath\/v1\/toolsAction":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"action":{"type":"string","description":"Action to perform","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/toolsAction"}]}},"\/rankmath\/v1\/updateMode":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"mode":{"type":"string","description":"Mode to set","enum":["easy","advanced","custom"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/updateMode"}]}},"\/rankmath\/v1\/dashboardWidget":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/dashboardWidget"}]}},"\/rankmath\/v1\/updateSeoScore":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"postScores":{"type":"object","description":"Post scores","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/updateSeoScore"}]}},"\/rankmath\/v1\/updateSettings":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/updateSettings"}]}},"\/rankmath\/v1\/searchPage":{"namespace":"rankmath\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/searchPage"}]}},"\/rankmath\/v1\/disconnectSite":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"token":{"type":"string","description":"Site token","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/disconnectSite"}]}},"\/rankmath\/v1\/getFeaturedImageId":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"postId":{"type":"integer","description":"Post ID","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/getFeaturedImageId"}]}},"\/rankmath\/v1\/updateRedirection":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectID":{"type":"integer","description":"Object unique id","required":true},"objectType":{"type":"string","default":"post","description":"Object Type i.e. post, term, user","required":true},"hasRedirect":{"type":"boolean","description":"Whether the object has a redirect or not","required":true},"redirectionID":{"type":"string","description":"Redirection ID","required":false},"redirectionUrl":{"type":"string","description":"Redirection URL","required":false},"redirectionType":{"type":"string","default":"301","description":"Redirection Type","enum":["301","302","307","410","451"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/updateRedirection"}]}},"\/rankmath\/v1\/updateMeta":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectType":{"type":"string","description":"Object Type i.e. post, term, user","required":true},"objectID":{"type":"integer","description":"Object unique id","required":true},"meta":{"description":"Meta to add or update data.","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/updateMeta"}]}},"\/rankmath\/v1\/updateSchemas":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectType":{"type":"string","description":"Object Type i.e. post, term, user","required":true},"objectID":{"type":"integer","description":"Object unique id","required":true},"schemas":{"description":"schemas to add or update data.","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/updateSchemas"}]}},"\/rankmath\/v1\/updateMetaBulk":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"rows":{"description":"Selected posts to update the data for.","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/updateMetaBulk"}]}},"\/rankmath\/v1\/setupWizard":{"namespace":"rankmath\/v1\/setupWizard","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/setupWizard","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/setupWizard"}]}},"\/rankmath\/v1\/setupWizard\/getStepData":{"namespace":"rankmath\/v1\/setupWizard","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"step":{"type":"string","description":"Current Step","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/setupWizard\/getStepData"}]}},"\/rankmath\/v1\/setupWizard\/updateStepData":{"namespace":"rankmath\/v1\/setupWizard","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"step":{"type":"string","description":"Current Step","required":true},"value":{"type":"object","description":"Current Step Data","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/setupWizard\/updateStepData"}]}},"\/rankmath\/v1\/setupWizard\/updateTrackingOptin":{"namespace":"rankmath\/v1\/setupWizard","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"enable_tracking":{"type":"string","description":"Enable Tracking","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/setupWizard\/updateTrackingOptin"}]}},"\/rankmath\/v1\/saveTemplate":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postId":{"type":"integer","description":"Post ID.","required":false},"schema":{"type":"object","description":"Schema data.","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/saveTemplate"}]}},"\/rankmath\/v1\/getVideoData":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectID":{"type":"integer","description":"Object unique id","required":true},"url":{"description":"Video URL.","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/getVideoData"}]}},"\/rankmath\/v1\/an":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/an","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an"}]}},"\/rankmath\/v1\/an\/getKeywordPages":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"query":{"description":"Query to search.","type":"string","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/getKeywordPages"}]}},"\/rankmath\/v1\/an\/postsOverview":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/postsOverview"}]}},"\/rankmath\/v1\/an\/getTrackedKeywords":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/getTrackedKeywords"}]}},"\/rankmath\/v1\/an\/getTrackedKeywordsRows":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Keyword to search.","type":"string","default":"","required":false},"orderby":{"default":"default","enum":["default","keyword"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/getTrackedKeywordsRows"}]}},"\/rankmath\/v1\/an\/getTrackedKeywordSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/getTrackedKeywordSummary"}]}},"\/rankmath\/v1\/an\/trackedKeywordsOverview":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/trackedKeywordsOverview"}]}},"\/rankmath\/v1\/an\/addTrackKeyword":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"keyword":{"description":"Keyword to add.","type":"string","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/addTrackKeyword"}]}},"\/rankmath\/v1\/an\/autoAddFocusKeywords":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"data":{"description":"Data to add.","type":"object","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/autoAddFocusKeywords"}]}},"\/rankmath\/v1\/an\/removeTrackKeyword":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc","ASC","DESC"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/removeTrackKeyword"}]}},"\/rankmath\/v1\/an\/deleteTrackedKeywords":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/deleteTrackedKeywords"}]}},"\/rankmath\/v1\/an\/getDesktopPagespeed":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"id":{"description":"Record id.","type":"integer","default":0,"required":false},"objectID":{"description":"Post id.","type":"integer","default":0,"required":false},"force":{"description":"Force update pagespeed.","type":"boolean","default":false,"required":false},"isAdminBar":{"description":"Is admin bar.","type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/getDesktopPagespeed"}]}},"\/rankmath\/v1\/an\/getMobilePagespeed":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"id":{"description":"Record id.","type":"integer","default":0,"required":false},"objectID":{"description":"Post id.","type":"integer","default":0,"required":false},"force":{"description":"Force update pagespeed.","type":"boolean","default":false,"required":false},"isAdminBar":{"description":"Is admin bar.","type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/getMobilePagespeed"}]}},"\/rankmath\/v1\/an\/getPageSEOScore":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"id":{"description":"Record id.","type":"integer","default":0,"required":false},"objectID":{"description":"Post id.","type":"integer","default":0,"required":false},"force":{"description":"Force update pagespeed.","type":"boolean","default":false,"required":false},"isAdminBar":{"description":"Is admin bar.","type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/getPageSEOScore"}]}},"\/rankmath\/v1\/an\/postsRows":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/postsRows"}]}},"\/rankmath\/v1\/an\/inspectionStats":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/inspectionStats"}]}},"\/rankmath\/v1\/pingSettings":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"apiKey":{"description":"API Key.","type":"string","required":true},"username":{"description":"Username.","type":"string","required":true},"plan":{"description":"Plan.","type":"string","required":true},"keywords":{"description":"Keywords.","type":"string","required":true},"settings":{"description":"Settings.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/pingSettings"}]}},"\/rankmath\/v1\/searchIntent":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyword":{"description":"The keyword used to determine the intent.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/searchIntent"}]}},"\/rankmath\/v1\/importCSV":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/importCSV"}]}},"\/rankmath\/v1\/cancelCsvImport":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/cancelCsvImport"}]}},"\/torck\/v1":{"namespace":"torck\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"torck\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck\/v1"}]}},"\/torck\/v1\/reels\/pending":{"namespace":"torck\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck\/v1\/reels\/pending"}]}},"\/torck\/v1\/reels\/(?P<id>\\d+)":{"namespace":"torck\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"hash":{"type":"string","required":true},"duration":{"type":"number","required":false},"lang":{"type":"string","required":false}}}]},"\/torck-mcp\/v1":{"namespace":"torck-mcp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"torck-mcp\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-mcp\/v1"}]}},"\/torck-mcp\/v1\/mcp":{"namespace":"torck-mcp\/v1","methods":["POST","GET","DELETE"],"endpoints":[{"methods":["POST","GET","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-mcp\/v1\/mcp"}]}},"\/torck-llm\/v1":{"namespace":"torck-llm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"torck-llm\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1"}]}},"\/torck-llm\/v1\/catalog":{"namespace":"torck-llm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/catalog"}]}},"\/torck-llm\/v1\/catalog\/entities":{"namespace":"torck-llm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/catalog\/entities"}]}},"\/torck-llm\/v1\/catalog\/values":{"namespace":"torck-llm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/catalog\/values"}]}},"\/torck-llm\/v1\/catalog\/sources":{"namespace":"torck-llm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/catalog\/sources"}]}},"\/torck-llm\/v1\/catalog\/changes":{"namespace":"torck-llm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/catalog\/changes"}]}},"\/torck-llm\/v1\/resolve":{"namespace":"torck-llm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/resolve"}]}},"\/torck-llm\/v1\/compare":{"namespace":"torck-llm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/compare"}]}},"\/torck-llm\/v1\/models":{"namespace":"torck-llm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/models"}]}},"\/torck-llm\/v1\/configurations":{"namespace":"torck-llm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/configurations"}]}},"\/torck-llm\/v1\/evidence-panel":{"namespace":"torck-llm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-llm\/v1\/evidence-panel"}]}},"\/torck-llm\/v1\/evidence\/(?P<id>[a-z0-9.-]+)":{"namespace":"torck-llm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/webp-converter\/v1":{"namespace":"webp-converter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"webp-converter\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/webp-converter\/v1"}]}},"\/webp-converter\/v1\/cloudflare-zones":{"namespace":"webp-converter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"api_token":{"description":"User API Token","default":false,"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/webp-converter\/v1\/cloudflare-zones"}]}},"\/webp-converter\/v1\/cron-conversion":{"namespace":"webp-converter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/webp-converter\/v1\/cron-conversion"}]}},"\/webp-converter\/v1\/images-stats":{"namespace":"webp-converter\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/webp-converter\/v1\/images-stats"}]}},"\/webp-converter\/v1\/paths":{"namespace":"webp-converter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"regenerate_force":{"description":"Option to force all images to be converted again (set `1` to enable)","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/webp-converter\/v1\/paths"}]}},"\/webp-converter\/v1\/regenerate":{"namespace":"webp-converter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"regenerate_force":{"description":"Option to force all images to be converted again (set `1` to enable)","default":false,"required":false},"paths":{"description":"Array of file paths (server paths)","default":[],"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/webp-converter\/v1\/regenerate"}]}},"\/webp-converter\/v1\/regenerate-attachment":{"namespace":"webp-converter\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"Attachment ID","required":true},"quality_level":{"description":"Conversion strategy","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/webp-converter\/v1\/regenerate-attachment"}]}},"\/elementor-mcp-composer\/v1.0.20":{"namespace":"elementor-mcp-composer\/v1.0.20","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-mcp-composer\/v1.0.20","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-mcp-composer\/v1.0.20"}]}},"\/elementor-mcp-composer\/v1.0.20\/mcp-settings":{"namespace":"elementor-mcp-composer\/v1.0.20","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"enabled":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-mcp-composer\/v1.0.20\/mcp-settings"}]}},"\/elementor-mcp-composer\/v1.0.20\/mcp-credentials":{"namespace":"elementor-mcp-composer\/v1.0.20","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"client":{"type":"string","enum":["claude-code","claude-desktop","codex","cursor","other"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-mcp-composer\/v1.0.20\/mcp-credentials"}]}},"\/elementor-one\/v1":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-one\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1"}]}},"\/elementor-one\/v1\/connect\/authorize":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"clearSession":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/connect\/authorize"}]}},"\/elementor-one\/v1\/connect\/disconnect":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/connect\/disconnect"}]}},"\/elementor-one\/v1\/connect\/switch-domain":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/connect\/switch-domain"}]}},"\/elementor-one\/v1\/connect\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/connect\/deactivate"}]}},"\/elementor-one\/v1\/top-bar\/notifications":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"app_name":{"type":"string","required":true},"app_version":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/top-bar\/notifications"}]}},"\/elementor-one\/v1\/top-bar\/feedback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product":{"type":"string","required":true},"subject":{"type":"string","required":true},"title":{"type":"string","required":true},"description":{"type":"string","required":true},"countryCode":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/top-bar\/feedback"}]}},"\/elementor-one\/v1\/themes":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The theme activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/themes"}]}},"\/elementor-one\/v1\/themes\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true}}}]},"\/elementor-one\/v1\/plugins":{"namespace":"elementor-one\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez","aryo-activity-log"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/plugins"}]}},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez","aryo-activity-log"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez","aryo-activity-log"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/upgrade":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez","aryo-activity-log"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["active"],"required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/run":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility","7":"cookiez","8":"aryo-activity-log"},"required":true},"force":{"type":"boolean","default":true,"description":"Force migration even if the plugin is already connected.","required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/rollback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility","7":"cookiez","8":"aryo-activity-log"},"required":true}}}]},"\/elementor-one\/v1\/settings":{"namespace":"elementor-one\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/settings"}]}},"\/elementor-one\/v1\/manage-dashboard-widget\/state":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/manage-dashboard-widget\/state"}]}},"\/elementor-one\/v1\/logs":{"namespace":"elementor-one\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-one\/v1\/logs"}]}},"\/elementor\/v1":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1"}]}},"\/elementor\/v1\/site-editor":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/site-editor"}]}},"\/elementor\/v1\/site-editor\/templates":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/site-editor\/templates"}]}},"\/elementor\/v1\/site-editor\/templates\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}}]},"\/elementor\/v1\/site-editor\/conditions-config":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/site-editor\/conditions-config"}]}},"\/elementor\/v1\/site-editor\/templates-conditions\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}}]},"\/elementor\/v1\/site-editor\/templates-conditions-conflicts":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/site-editor\/templates-conditions-conflicts"}]}},"\/elementor-pro\/v1":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-pro\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1"}]}},"\/elementor-pro\/v1\/license\/tier-features":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1\/license\/tier-features"}]}},"\/elementor-pro\/v1\/license\/get-license-status":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1\/license\/get-license-status"}]}},"\/torck-ats\/v1":{"namespace":"torck-ats\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"torck-ats\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-ats\/v1"}]}},"\/torck-ats\/v1\/applications":{"namespace":"torck-ats\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-ats\/v1\/applications"}]}},"\/torck-ats\/v1\/filter":{"namespace":"torck-ats\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/torck-ats\/v1\/filter"}]}},"\/wp-2fa-methods\/v1":{"namespace":"wp-2fa-methods\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-2fa-methods\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-2fa-methods\/v1"}]}},"\/wp-2fa-passkeys\/v1":{"namespace":"wp-2fa-passkeys\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-2fa-passkeys\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-2fa-passkeys\/v1"}]}},"\/wp-2fa-passkeys\/v1\/register\/response":{"namespace":"wp-2fa-passkeys\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-2fa-passkeys\/v1\/register\/response"}]}},"\/wp-rocket\/v1":{"namespace":"wp-rocket\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-rocket\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1"}]}},"\/wp-rocket\/v1\/rocketcdn\/enable":{"namespace":"wp-rocket\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"email":{"required":true},"key":{"required":true},"url":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/rocketcdn\/enable"}]}},"\/wp-rocket\/v1\/rocketcdn\/disable":{"namespace":"wp-rocket\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"email":{"required":true},"key":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/rocketcdn\/disable"}]}},"\/wp-rocket\/v1\/rocketcdn\/pages":{"namespace":"wp-rocket\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"url":{"required":true},"confirm_activation":{"default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/rocketcdn\/pages"}]}},"\/wp-rocket\/v1\/rocketcdn\/pages\/homepage":{"namespace":"wp-rocket\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"confirm_activation":{"default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/rocketcdn\/pages\/homepage"}]}},"\/wp-rocket\/v1\/rocketcdn\/pages\/(?P<id>\\d+)":{"namespace":"wp-rocket\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"id":{"required":true}}}]},"\/wp-rocket\/v1\/rocketcdn\/driver":{"namespace":"wp-rocket\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"driver":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/rocketcdn\/driver"}]}},"\/wp-rocket\/v1\/rocketcdn\/mode":{"namespace":"wp-rocket\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"mode":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/rocketcdn\/mode"}]}},"\/wp-rocket\/v1\/rocketcdn\/subscription":{"namespace":"wp-rocket\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/rocketcdn\/subscription"}]}},"\/wp-rocket\/v1\/cpcss\/post\/(?P<id>[\\d]+)":{"namespace":"wp-rocket\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/wp-rocket\/v1\/support":{"namespace":"wp-rocket\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"email":{"required":true},"key":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/support"}]}},"\/wp-rocket\/v1\/dynamic_lists\/update":{"namespace":"wp-rocket\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/dynamic_lists\/update"}]}},"\/wp-rocket\/v1\/options\/export":{"namespace":"wp-rocket\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/options\/export"}]}},"\/wp-rocket\/v1\/rocket-insights\/pages":{"namespace":"wp-rocket\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":false},"post_id":{"required":false}}},{"methods":["POST"],"args":{"page_url":{"required":true},"source":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/rocket-insights\/pages"}]}},"\/wp-rocket\/v1\/rocket-insights\/pages\/progress":{"namespace":"wp-rocket\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"ids":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/rocket-insights\/pages\/progress"}]}},"\/wp-rocket\/v1\/rocket-insights\/pages\/(?P<id>\\d+)":{"namespace":"wp-rocket\/v1","methods":["DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["DELETE"],"args":{"id":{"required":true}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":true},"source":{"required":true}}}]},"\/wp-rocket\/v1\/recommendations":{"namespace":"wp-rocket\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-rocket\/v1\/recommendations"}]}},"\/elementor-hello-elementor\/v1":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-hello-elementor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-hello-elementor\/v1"}]}},"\/elementor-hello-elementor\/v1\/admin-settings":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-hello-elementor\/v1\/admin-settings"}]}},"\/elementor-hello-elementor\/v1\/theme-settings":{"namespace":"elementor-hello-elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-hello-elementor\/v1\/theme-settings"}]}},"\/elementor-hello-elementor\/v1\/whats-new":{"namespace":"elementor-hello-elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-hello-elementor\/v1\/whats-new"}]}},"\/rankmath\/v1\/ai-visibility":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/ai-visibility","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ai-visibility"}]}},"\/rankmath\/v1\/ai-visibility\/overview":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"refresh":{"description":"Force a refresh from the AI Visibility API.","type":"boolean","default":false,"required":false},"search":{"description":"Filter brands by name or URL.","type":"string","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ai-visibility\/overview"}]}},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true},"name":{"type":"string","required":false},"url":{"type":"string","required":false},"description":{"type":"string","required":false},"locale":{"type":"string","required":false},"language":{"type":"string","enum":["","US English","UK English","Arabic","Bulgarian","Chinese","Czech","Danish","Dutch","Estonian","Finnish","French","German","Greek","Hebrew","Hungarian","Indonesian","Italian","Japanese","Korean","Latvian","Lithuanian","Norwegian","Polish","Portuguese","Romanian","Russian","Slovak","Slovenian","Spanish","Swedish","Turkish"],"required":false},"status":{"type":"string","enum":["active","inactive"],"required":false},"interval":{"type":"string","enum":["daily","weekly","monthly"],"required":false},"platforms":{"description":"AI platforms to track for this brand. Supported values: \"chatgpt\", \"gemini\". Tracking more than one platform per brand requires the Expert plan.","type":"array","minItems":1,"items":{"type":"string","enum":["chatgpt","gemini"]},"required":false}}}]},"\/rankmath\/v1\/ai-visibility\/brands":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"name":{"description":"Brand name.","type":"string","required":true},"url":{"description":"Brand website URL or domain.","type":"string","required":true},"description":{"description":"Short description of the brand or product.","type":"string","required":true},"locale":{"description":"ISO 3166-1 alpha-2 country code (e.g. &quot;US&quot;, &quot;HU&quot;).","type":"string","required":false},"language":{"description":"Output language to use when analyzing\/generating content for this brand. Independent of `locale` (target country). Required; immutable after creation.","type":"string","enum":["US English","UK English","Arabic","Bulgarian","Chinese","Czech","Danish","Dutch","Estonian","Finnish","French","German","Greek","Hebrew","Hungarian","Indonesian","Italian","Japanese","Korean","Latvian","Lithuanian","Norwegian","Polish","Portuguese","Romanian","Russian","Slovak","Slovenian","Spanish","Swedish","Turkish"],"required":true},"interval":{"description":"Analysis refresh cadence. Omitted \u2192 backend applies the account plan&#039;s default.","type":"string","enum":["daily","weekly","monthly"],"required":false},"platforms":{"description":"AI platforms to track for this brand. Supported values: \"chatgpt\", \"gemini\". Tracking more than one platform per brand requires the Expert plan.","type":"array","minItems":1,"items":{"type":"string","enum":["chatgpt","gemini"]},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ai-visibility\/brands"}]}},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)\/insights":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true}}}]},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)\/queries":{"namespace":"rankmath\/v1\/ai-visibility","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true}}}]},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)\/queries\/(?P<qid>[a-zA-Z0-9\\-]+)":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true},"qid":{"description":"Query UUID.","type":"string","required":true},"enabled":{"description":"Whether the query is enabled for analysis.","type":"boolean","required":true}}}]},"\/rankmath\/v1\/ai-visibility\/brands\/(?P<id>[a-zA-Z0-9\\-]+)\/generate-queries":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Brand UUID.","type":"string","required":true}}}]},"\/rankmath\/v1\/ai-visibility\/trial\/activate":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ai-visibility\/trial\/activate"}]}},"\/rankmath\/v1\/ai-visibility\/checkout-url":{"namespace":"rankmath\/v1\/ai-visibility","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ai-visibility\/checkout-url"}]}},"\/rankmath\/v1\/ca":{"namespace":"rankmath\/v1\/ca","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/ca","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca"}]}},"\/rankmath\/v1\/ca\/researchKeyword":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyword":{"description":"The keyword to be researched.","type":"string","required":true},"country":{"description":"The country for which the keyword should be researched.","type":"string","required":true},"objectID":{"description":"The ID of the post initiating the keyword research request.","type":"integer","required":true},"force_update":{"description":"If true, forces a fresh research request.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/researchKeyword"}]}},"\/rankmath\/v1\/ca\/getCredits":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/getCredits"}]}},"\/rankmath\/v1\/ca\/createPost":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"content":{"description":"The content of the new post.","type":"string","required":true},"title":{"description":"The title of the new post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/createPost"}]}},"\/rankmath\/v1\/ca\/saveOutput":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"outputs":{"description":"An array of AI-generated and existing outputs to be saved.","type":"array","required":false},"endpoint":{"description":"The API endpoint for which the output was generated.","type":"string","required":false},"isChat":{"description":"Indicates if the request was for the Chat endpoint.","type":"boolean","required":false},"attributes":{"description":"The parameters used to generate the AI output.","type":"object","required":false},"credits":{"description":"Credit usage details returned by the API.","type":"object","required":false},"usage":{"description":"Per-tool usage data returned by the API.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/saveOutput"}]}},"\/rankmath\/v1\/ca\/deleteOutput":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"isChat":{"description":"Indicates if the request to delete the output was for the Chat endpoint.","type":"boolean","required":false},"index":{"description":"The output index to delete, applicable only to the Chat endpoint.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/deleteOutput"}]}},"\/rankmath\/v1\/ca\/updateRecentPrompt":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompt":{"description":"The selected prompt to be updated in the recent prompts.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/updateRecentPrompt"}]}},"\/rankmath\/v1\/ca\/updatePrompt":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompt":{"description":"The prompt data to be saved in the database.","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/updatePrompt"}]}},"\/rankmath\/v1\/ca\/savePrompts":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompts":{"description":"A list of prompts received from the API to be saved in the database.","type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/savePrompts"}]}},"\/rankmath\/v1\/ca\/pingContentAI":{"namespace":"rankmath\/v1\/ca","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"plan":{"description":"Rank Math AI plan to update in the Database.","type":"string","required":true},"refreshDate":{"description":"Content AI reset date to update in the Database","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/pingContentAI"}]}},"\/rankmath\/v1\/ca\/generateAlt":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"attachmentIds":{"description":"List of attachment IDs for which to generate alt text.","type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/generateAlt"}]}},"\/rankmath\/v1\/ca\/updateCredits":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"credits":{"description":"Credit usage details returned by the API.","type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/ca\/updateCredits"}]}},"\/rankmath\/v1\/an\/dashboard":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/dashboard"}]}},"\/rankmath\/v1\/an\/keywordsOverview":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/keywordsOverview"}]}},"\/rankmath\/v1\/an\/postsSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/postsSummary"}]}},"\/rankmath\/v1\/an\/postsRowsByObjects":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","required":false},"per_page":{"description":"Results per page.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/postsRowsByObjects"}]}},"\/rankmath\/v1\/an\/post\/(?P<id>\\d+)":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Post ID.","type":"integer","required":true}}}]},"\/rankmath\/v1\/an\/keywordsSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/keywordsSummary"}]}},"\/rankmath\/v1\/an\/analyticsSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"postType":{"description":"Post Type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/analyticsSummary"}]}},"\/rankmath\/v1\/an\/keywordsRows":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","required":false},"perPage":{"description":"Results per page.","type":"integer","required":false},"orderBy":{"description":"Order by.","type":"string","required":false},"order":{"description":"Order.","type":"string","required":false},"search":{"description":"Search.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/keywordsRows"}]}},"\/rankmath\/v1\/an\/userPreferences":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"preferences":{"description":"User preferences.","type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/userPreferences"}]}},"\/rankmath\/v1\/an\/inspectionResults":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","required":false},"perPage":{"description":"Results per page.","type":"integer","required":false},"orderBy":{"description":"Order by.","type":"string","required":false},"order":{"description":"Order.","type":"string","required":false},"search":{"description":"Search.","type":"string","required":false},"filter":{"description":"Filter.","type":"string","required":false},"filterType":{"description":"Filter type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/inspectionResults"}]}},"\/rankmath\/v1\/an\/removeFrontendStats":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"toggleBar":{"description":"Toggle bar.","type":"boolean","required":false},"hide":{"description":"Hide.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/an\/removeFrontendStats"}]}},"\/rankmath\/v1\/in":{"namespace":"rankmath\/v1\/in","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/in","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/in"}]}},"\/rankmath\/v1\/in\/submitUrls":{"namespace":"rankmath\/v1\/in","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"urls":{"description":"The list of urls to submit to the Instant Indexing API.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/in\/submitUrls"}]}},"\/rankmath\/v1\/in\/getLog":{"namespace":"rankmath\/v1\/in","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"filter":{"description":"Filter log by type.","type":"string","enum":["all","manual","auto"],"default":"all","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/in\/getLog"}]}},"\/rankmath\/v1\/in\/clearLog":{"namespace":"rankmath\/v1\/in","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filter":{"description":"Clear log by type.","type":"string","enum":["all","manual","auto"],"default":"all","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/in\/clearLog"}]}},"\/rankmath\/v1\/in\/resetKey":{"namespace":"rankmath\/v1\/in","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/in\/resetKey"}]}},"\/rankmath\/v1\/links\/posts":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"required":false},"per_page":{"description":"Items per page.","type":"integer","default":50,"maximum":100,"required":false},"search":{"description":"Search in post title.","type":"string","default":"","required":false},"post_type":{"description":"Filter by post type. Supports multiple values.","type":"array","items":{"type":"string"},"default":[],"required":false},"is_orphan":{"description":"Filter by orphan status (orphan, linked).","type":"string","default":"","required":false},"seo_score_range":{"description":"Filter by SEO score range (great, good, bad, no-score).","type":"string","default":"","required":false},"post_id":{"description":"Filter by post ID.","type":"integer","default":0,"required":false},"orderby":{"description":"Order by field.","type":"string","default":"post_title","required":false},"order":{"description":"Order direction (ASC, DESC).","type":"string","default":"ASC","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/links\/posts"}]}},"\/rankmath\/v1\/links\/posts-stats":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/links\/posts-stats"}]}},"\/rankmath\/v1\/links\/links":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"required":false},"per_page":{"description":"Items per page.","type":"integer","default":50,"maximum":100,"required":false},"search":{"description":"Search in URL.","type":"string","default":"","required":false},"source_id":{"description":"Filter by source post ID.","type":"integer","default":0,"required":false},"target_post_id":{"description":"Filter by target post ID.","type":"integer","default":0,"required":false},"is_internal":{"description":"Filter by link type (1 = internal, 0 = external).","type":"string","default":"","required":false},"orderby":{"description":"Order by field.","type":"string","default":"id","required":false},"order":{"description":"Order direction (ASC, DESC).","type":"string","default":"DESC","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/links\/links"}]}},"\/rankmath\/v1\/links\/links-stats":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/links\/links-stats"}]}},"\/rankmath\/v1\/status":{"namespace":"rankmath\/v1\/status","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/status","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/status"}]}},"\/rankmath\/v1\/status\/getViewData":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/status\/getViewData"}]}},"\/rankmath\/v1\/status\/updateViewData":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/status\/updateViewData"}]}},"\/rankmath\/v1\/status\/importSettings":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/status\/importSettings"}]}},"\/rankmath\/v1\/status\/exportSettings":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/status\/exportSettings"}]}},"\/rankmath\/v1\/status\/runBackup":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/status\/runBackup"}]}},"\/pgmb\/v1":{"namespace":"pgmb\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"pgmb\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/pgmb\/v1"}]}},"\/pgmb\/v1\/variables":{"namespace":"pgmb\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_id":{"type":"integer","required":false},"post_type":{"type":"string","required":true},"offset":{"type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/pgmb\/v1\/variables"}]}},"\/pgmb\/v1\/preview":{"namespace":"pgmb\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_id":{"type":"integer","required":true},"form_fields":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/pgmb\/v1\/preview"}]}},"\/rankmath\/v1\/link-genius":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/link-genius","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius"}]}},"\/rankmath\/v1\/link-genius\/links":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"required":false},"per_page":{"description":"Items per page.","type":"integer","default":50,"maximum":100,"required":false},"source_id":{"description":"Filter by source post ID.","type":"integer","default":0,"required":false},"target_post_id":{"description":"Filter by target post ID.","type":"integer","default":0,"required":false},"is_internal":{"description":"Filter by link type.","type":"string","default":"","required":false},"is_nofollow":{"description":"Filter by nofollow status.","type":"string","default":"","required":false},"anchor_type":{"description":"Filter by anchor type (HPLNK, CNCL, HLANG, IMAGE).","type":"string","default":"","required":false},"target_blank":{"description":"Filter by target blank status.","type":"string","default":"","required":false},"search":{"description":"Search in anchor text or URL.","type":"string","default":"","required":false},"orderby":{"description":"Order by field.","type":"string","default":"created_at","required":false},"order":{"description":"Order direction.","type":"string","default":"DESC","required":false},"status_code":{"description":"Filter by HTTP status code (e.g., 404). Supports multiple values.","type":"array","items":{"type":"string"},"default":[],"required":false},"status_category":{"description":"Filter by status category (2xx, 3xx, 4xx, 5xx, timeout, error).","type":"string","default":"","required":false},"is_broken":{"description":"Filter broken links (4xx, 5xx, timeout, error).","type":"boolean","default":false,"required":false},"is_success":{"description":"Filter successful links (2xx).","type":"boolean","default":false,"required":false},"is_redirect":{"description":"Filter redirect links (3xx).","type":"string","default":"","required":false},"robots_blocked":{"description":"Filter links blocked by robots.txt.","type":"string","default":"","required":false},"unchecked":{"description":"Filter unchecked links (no status data).","type":"string","default":"","required":false},"is_marked_safe":{"description":"Filter links marked as safe.","type":"string","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/links"}]}},"\/rankmath\/v1\/link-genius\/links\/(?P<id>\\d+)\/details":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Link ID.","type":"integer","required":true}}}]},"\/rankmath\/v1\/link-genius\/delete":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"link_ids":{"description":"Link IDs to delete.","type":"array","required":false},"filters":{"description":"Filter criteria for selecting links to delete.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/delete"}]}},"\/rankmath\/v1\/link-genius\/undo-delete":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"Post ID to restore.","type":"integer","required":true},"original_content":{"description":"Original post content to restore.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/undo-delete"}]}},"\/rankmath\/v1\/link-genius\/remove-nofollow":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"link_id":{"description":"Link ID to remove nofollow from.","type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/remove-nofollow"}]}},"\/rankmath\/v1\/link-genius\/update":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"link_id":{"description":"Link ID to update.","type":"integer","required":true},"new_url":{"description":"New URL for the link.","type":"string","required":true},"new_anchor":{"description":"New anchor text for the link.","type":"string","required":true},"is_nofollow":{"description":"Whether the link should have nofollow attribute.","type":"integer","default":0,"required":false},"target_blank":{"description":"Whether the link should open in a new tab.","type":"integer","default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/update"}]}},"\/rankmath\/v1\/link-genius\/bulk-actions\/restore":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batch_id":{"description":"Batch ID to restore from snapshots.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/bulk-actions\/restore"}]}},"\/rankmath\/v1\/link-genius\/link-suggestions":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"Post ID.","type":"integer","required":true},"text":{"description":"Selected text used for suggestions.","type":"string","required":false},"current":{"description":"Current editor state summary.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/link-suggestions"}]}},"\/rankmath\/v1\/link-genius\/link-opportunities":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"Post ID.","type":"integer","required":true},"current":{"description":"Current editor state summary.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/link-opportunities"}]}},"\/rankmath\/v1\/link-genius\/related-posts":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"Post ID.","type":"integer","required":true},"current":{"description":"Current editor state summary.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/related-posts"}]}},"\/rankmath\/v1\/link-genius\/audit\/stats":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/audit\/stats"}]}},"\/rankmath\/v1\/link-genius\/audit\/start":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"filters":{"description":"Filters to apply (is_internal, unchecked_only, etc.).","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/audit\/start"}]}},"\/rankmath\/v1\/link-genius\/audit\/recheck":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"link_ids":{"description":"Array of link IDs to recheck.","type":"array","required":false},"filters":{"description":"Filter criteria for selecting links to recheck.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/audit\/recheck"}]}},"\/rankmath\/v1\/link-genius\/audit\/mark-safe":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"link_ids":{"description":"Link IDs to mark as safe.","type":"array","required":false},"reason":{"description":"Reason for marking as safe.","type":"string","required":false},"filters":{"description":"Filter criteria for selecting links to mark as safe.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/audit\/mark-safe"}]}},"\/rankmath\/v1\/link-genius\/export":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"type":{"description":"Export type (links or posts).","type":"string","required":true},"format":{"description":"Export format (csv, json, excel).","type":"string","required":true},"filters":{"description":"Filters to apply to the export.","type":"object","required":false},"columns":{"description":"Column definitions.","type":"array","required":true},"total":{"description":"Total number of records to export.","type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/export"}]}},"\/rankmath\/v1\/link-genius\/posts":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"required":false},"per_page":{"description":"Items per page.","type":"integer","default":50,"maximum":100,"required":false},"search":{"description":"Search in post title.","type":"string","default":"","required":false},"post_type":{"description":"Filter by post type. Supports multiple values.","type":"array","items":{"type":"string"},"default":[],"required":false},"is_orphan":{"description":"Filter by orphan status.","type":"string","default":"","required":false},"seo_score_range":{"description":"Filter by SEO score range.","type":"string","default":"","required":false},"orderby":{"description":"Order by field.","type":"string","default":"post_title","required":false},"order":{"description":"Order direction.","type":"string","default":"ASC","required":false},"min_incoming_links":{"description":"Minimum incoming links count filter.","type":"integer","default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/posts"}]}},"\/rankmath\/v1\/link-genius\/posts-stats":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/posts-stats"}]}},"\/rankmath\/v1\/link-genius\/stats":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/stats"}]}},"\/rankmath\/v1\/link-genius\/regenerate":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/regenerate"}]}},"\/rankmath\/v1\/link-genius\/operations\/progress":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"operation":{"description":"Operation type.","type":"string","enum":["regenerate","audit","bulk_delete","bulk_mark_safe","bulk_restore","bulk_update_preview","bulk_update_apply","keyword_map_preview","keyword_map_apply","export"],"required":true},"id":{"description":"Optional operation ID (for keyword maps).","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/operations\/progress"}]}},"\/rankmath\/v1\/link-genius\/operations\/cancel":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"operation":{"description":"Operation type to cancel.","type":"string","enum":["regenerate","audit","bulk_delete","bulk_mark_safe","bulk_restore","bulk_update_preview","bulk_update_apply","keyword_map_preview","keyword_map_apply","export"],"required":true},"id":{"description":"Optional operation ID (for keyword maps).","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/operations\/cancel"}]}},"\/rankmath\/v1\/link-genius\/operations\/clear":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"operation":{"description":"Operation type to clear.","type":"string","enum":["regenerate","audit","bulk_delete","bulk_mark_safe","bulk_restore","bulk_update_preview","bulk_update_apply","keyword_map_preview","keyword_map_apply","export"],"required":true},"id":{"description":"Optional operation ID (for keyword maps).","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/operations\/clear"}]}},"\/rankmath\/v1\/link-genius\/bulk-update\/preview":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"filters":{"description":"Search filters for finding links.","type":"object","required":true},"update_config":{"description":"Update configuration.","type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/bulk-update\/preview"}]}},"\/rankmath\/v1\/link-genius\/bulk-update\/preview\/results":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Number of items per page.","type":"integer","default":20,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/bulk-update\/preview\/results"}]}},"\/rankmath\/v1\/link-genius\/bulk-update\/history":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Number of items per page.","type":"integer","default":20,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/bulk-update\/history"}]}},"\/rankmath\/v1\/link-genius\/bulk-update\/history\/(?P<batch_id>[a-zA-Z0-9_]+)":{"namespace":"rankmath\/v1\/link-genius","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"batch_id":{"description":"Batch ID to delete.","type":"string","required":true}}}]},"\/rankmath\/v1\/link-genius\/bulk-update\/apply":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"filters":{"description":"Search filters for finding links.","type":"object","required":true},"update_config":{"description":"Update configuration.","type":"object","required":true},"selected_link_ids":{"description":"Optional array of specific link IDs to update.","type":"array","items":{"type":"integer"},"required":false},"is_rollback":{"description":"Whether this is a rollback operation (prevents history creation).","type":"boolean","default":false,"required":false},"rollback_batch_id":{"description":"Batch ID being rolled back (for status update).","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/bulk-update\/apply"}]}},"\/rankmath\/v1\/link-genius\/bulk-update\/rollback":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batch_id":{"description":"Batch ID to rollback.","type":"string","required":true},"selected_post_ids":{"description":"Optional array of specific post IDs to rollback.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/bulk-update\/rollback"}]}},"\/rankmath\/v1\/link-genius\/bulk-update\/changes\/(?P<batch_id>[a-zA-Z0-9_]+)":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"batch_id":{"description":"Batch ID.","type":"string","required":true}}}]},"\/rankmath\/v1\/link-genius\/keyword-maps\/(?P<id>\\d+)\/preview":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/rankmath\/v1\/link-genius\/keyword-maps\/preview\/results":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Number of items per page.","type":"integer","default":20,"minimum":1,"maximum":100,"required":false},"keyword_map_id":{"description":"Keyword map ID.","type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/keyword-maps\/preview\/results"}]}},"\/rankmath\/v1\/link-genius\/keyword-maps\/history":{"namespace":"rankmath\/v1\/link-genius","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Number of items per page.","type":"integer","default":20,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/keyword-maps\/history"}]}},"\/rankmath\/v1\/link-genius\/keyword-maps":{"namespace":"rankmath\/v1\/link-genius","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Number of items per page.","type":"integer","default":20,"minimum":1,"maximum":100,"required":false},"orderby":{"description":"Column to order by.","type":"string","default":"created_at","enum":["id","name","created_at","updated_at","last_executed_at","execution_count"],"required":false},"order":{"description":"Order direction.","type":"string","default":"DESC","enum":["ASC","DESC"],"required":false},"enabled":{"description":"Filter by enabled status.","type":"boolean","required":false},"search":{"description":"Search term.","type":"string","required":false}}},{"methods":["POST"],"args":{"name":{"description":"Keyword map name.","type":"string","required":true},"description":{"description":"Keyword map description.","type":"string","required":false},"target_url":{"description":"Target URL.","type":"string","required":true},"is_enabled":{"description":"Whether the keyword map is enabled.","type":"boolean","default":true,"required":false},"max_links_per_post":{"description":"Maximum links per post.","type":"integer","default":3,"minimum":1,"required":false},"auto_link_on_publish":{"description":"Enable auto-linking on publish.","type":"boolean","default":false,"required":false},"case_sensitive":{"description":"Enable case-sensitive keyword matching.","type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/keyword-maps"}]}},"\/rankmath\/v1\/link-genius\/keyword-maps\/(?P<id>\\d+)":{"namespace":"rankmath\/v1\/link-genius","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"name":{"description":"Keyword map name.","type":"string","required":false},"description":{"description":"Keyword map description.","type":"string","required":false},"target_url":{"description":"Target URL.","type":"string","required":false},"is_enabled":{"description":"Whether the keyword map is enabled.","type":"boolean","default":true,"required":false},"max_links_per_post":{"description":"Maximum links per post.","type":"integer","default":3,"minimum":1,"required":false},"auto_link_on_publish":{"description":"Enable auto-linking on publish.","type":"boolean","default":false,"required":false},"case_sensitive":{"description":"Enable case-sensitive keyword matching.","type":"boolean","default":false,"required":false}}},{"methods":["DELETE"],"args":[]}]},"\/rankmath\/v1\/link-genius\/keyword-maps\/bulk-toggle":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"ids":{"description":"Array of keyword map IDs.","type":"array","items":{"type":"integer"},"required":true},"enabled":{"description":"New enabled status.","type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/keyword-maps\/bulk-toggle"}]}},"\/rankmath\/v1\/link-genius\/keyword-maps\/bulk-delete":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"ids":{"description":"Array of keyword map IDs.","type":"array","items":{"type":"integer"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/keyword-maps\/bulk-delete"}]}},"\/rankmath\/v1\/link-genius\/keyword-maps\/(?P<id>\\d+)\/execute":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/rankmath\/v1\/link-genius\/keyword-maps\/(?P<id>\\d+)\/variations":{"namespace":"rankmath\/v1\/link-genius","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"variation":{"description":"Variation text.","type":"string","required":true},"source":{"description":"Variation source.","type":"string","default":"manual","enum":["manual","ai"],"required":false}}}]},"\/rankmath\/v1\/link-genius\/keyword-maps\/variations\/(?P<id>\\d+)":{"namespace":"rankmath\/v1\/link-genius","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}]},"\/rankmath\/v1\/link-genius\/keyword-maps\/(?P<id>\\d+)\/generate-variations":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/rankmath\/v1\/link-genius\/keyword-maps\/generate-variations":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyword":{"description":"Keyword to generate variations for.","type":"string","required":true},"context":{"description":"Optional context to help generate better variations.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath\/v1\/link-genius\/keyword-maps\/generate-variations"}]}},"\/rankmath\/v1\/link-genius\/keyword-maps\/(?P<id>\\d+)\/accept-variations":{"namespace":"rankmath\/v1\/link-genius","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"variations":{"description":"Array of variations to accept.","type":"array","required":true}}}]},"\/elementor\/v1\/documents":{"namespace":"elementor\/v1\/documents","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/documents","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/documents"}]}},"\/elementor\/v1\/documents\/(?P<id>\\d+)\/media\/import":{"namespace":"elementor\/v1\/documents","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":true}}}]},"\/elementor\/v1\/cache":{"namespace":"elementor\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/cache"}]}},"\/elementor\/v1\/globals":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/globals"}]}},"\/elementor\/v1\/globals\/colors":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/globals\/colors"}]}},"\/elementor\/v1\/globals\/colors\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/globals\/typography":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/globals\/typography"}]}},"\/elementor\/v1\/globals\/typography\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/mcp-proxy":{"namespace":"elementor\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"tool":{"type":"string","required":true},"input":{"type":"object","required":true}}},{"methods":["GET"],"args":{"uri":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/mcp-proxy"}]}},"\/elementor\/v1\/settings\/(?P<key>[\\w_-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/elementor\/v1\/post":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included post types","type":"array","default":null,"required":false},"excluded_types":{"description":"Post type to exclude","type":"array","default":["e-floating-buttons","e-landing-page","elementor_library","attachment","revision","nav_menu_item","custom_css","customize_changeset"],"required":false},"term":{"description":"Posts to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"ID":"id","post_title":"label","post_type":"groupLabel"},"required":false},"items_count":{"description":"Posts per page","type":"integer","default":100,"required":false},"is_public":{"description":"Whether to include only public post types","type":"boolean","default":true,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false},"tax_query":{"description":"WP_Query tax_query array","type":"array","default":null,"required":false},"search_in_content":{"description":"Whether to search within post content and excerpt in addition to title","type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/post"}]}},"\/elementor\/v1\/term":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"excluded_types":{"description":"Excluded taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"term":{"description":"Terms to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"term_id":"id","name":"label","taxonomy":"groupLabel"},"required":false},"items_count":{"description":"Terms per request","type":"integer","default":100,"required":false},"hide_empty":{"description":"Whether to include only public terms","type":"boolean","default":false,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/term"}]}},"\/elementor\/v1\/user":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"term":{"description":"Users to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":["array","string"],"default":{"ID":"id","display_name":"label","role":"groupLabel"},"required":false},"items_count":{"description":"Number of users to return","type":"integer","default":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/user"}]}},"\/elementor-ai\/v1":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-ai\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-ai\/v1"}]}},"\/elementor-ai\/v1\/permissions":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-ai\/v1\/permissions"}]}},"\/elementor\/v1\/favorites":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/favorites"}]}},"\/elementor\/v1\/favorites\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to create.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to delete.","type":"string","required":true}}}]},"\/elementor\/v1\/pro-setup-promotion":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/pro-setup-promotion"}]}},"\/elementor\/v1\/pro-setup-promotion\/dismiss":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/pro-setup-promotion\/dismiss"}]}},"\/elementor\/v1\/pro-setup-promotion\/complete-setup":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/pro-setup-promotion\/complete-setup"}]}},"\/elementor\/v1\/pro-setup-promotion\/setup-state":{"namespace":"elementor\/v1","methods":["GET","GET"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/pro-setup-promotion\/setup-state"}]}},"\/elementor\/v1\/kit-elements-defaults":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/kit-elements-defaults"}]}},"\/elementor\/v1\/kit-elements-defaults\/(?P<type>[\\w\\-\\_]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"type":{"type":"string","description":"The type of the element.","required":true},"settings":{"description":"All the default values for the requested type","type":"object","required":true}}},{"methods":["DELETE"],"args":{"type":{"type":"string","description":"The type of the element.","required":true}}}]},"\/elementor\/v1\/site-navigation\/recent-posts":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"posts_per_page":{"description":"Number of posts to return","type":"integer","required":true},"post_type":{"description":"Post types to retrieve","type":"array","default":["page","post","elementor_library"],"required":false},"post__not_in":{"description":"Post id`s to exclude","type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/site-navigation\/recent-posts"}]}},"\/elementor\/v1\/site-navigation\/add-new-post":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"description":"Post type to create","type":"string","default":"post","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/site-navigation\/add-new-post"}]}},"\/elementor\/v1\/css-to-atomic":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"blocks":{"type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/css-to-atomic"}]}},"\/elementor\/v1\/global-classes":{"namespace":"elementor\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"args":{"context":{"type":"string","default":"frontend","enum":["frontend","preview"],"required":false}}},{"methods":["PUT"],"args":{"context":{"type":"string","default":"frontend","enum":["frontend","preview"],"required":false},"changes":{"type":"object","additionalProperties":false,"properties":{"added":{"type":"array","required":true,"items":{"type":"string"}},"deleted":{"type":"array","required":true,"items":{"type":"string"}},"modified":{"type":"array","required":true,"items":{"type":"string"}},"order":{"type":"boolean","required":false}},"required":true},"items":{"type":"object","additionalProperties":{"type":"object","properties":{"id":{"type":"string","required":true},"variants":{"type":"array","required":true},"type":{"type":"string","enum":["class"],"required":true},"label":{"type":"string","required":true}}},"required":true},"order":{"type":"array","items":{"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/global-classes"}]}},"\/elementor\/v1\/global-classes\/post":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"type":"string","default":"frontend","enum":["frontend","preview"],"required":false},"post_id":{"type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/global-classes\/post"}]}},"\/elementor\/v1\/global-classes\/styles":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"type":"string","default":"frontend","enum":["frontend","preview"],"required":false},"ids":{"type":"string","description":"Comma-separated list of global class IDs","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/global-classes\/styles"}]}},"\/elementor\/v1\/global-classes\/usage":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"type":"string","default":"frontend","enum":["frontend","preview"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/global-classes\/usage"}]}},"\/elementor\/v1\/default-styles":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/default-styles"}]}},"\/elementor\/v1\/default-styles\/(?P<tag>[a-z0-9]+)":{"namespace":"elementor\/v1","methods":["GET","PUT","DELETE"],"endpoints":[{"methods":["GET"],"args":{"tag":{"type":"string","required":true}}},{"methods":["PUT"],"args":{"tag":{"type":"string","required":true},"variants":{"type":"array","required":true},"type":{"type":"string","enum":["class"],"required":false}}},{"methods":["DELETE"],"args":{"tag":{"type":"string","required":true}}}]},"\/elementor\/v1\/variables\/list":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/variables\/list"}]}},"\/elementor\/v1\/variables\/create":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"type":{"type":"string","required":true},"label":{"type":"string","required":true},"value":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/variables\/create"}]}},"\/elementor\/v1\/variables\/update":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"string","required":true},"label":{"type":"string","required":true},"value":{"type":"string","required":true},"order":{"type":"integer","required":false},"type":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/variables\/update"}]}},"\/elementor\/v1\/variables\/delete":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/variables\/delete"}]}},"\/elementor\/v1\/variables\/restore":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"string","required":true},"label":{"type":"string","required":false},"value":{"type":"string","required":false},"type":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/variables\/restore"}]}},"\/elementor\/v1\/variables\/batch":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"watermark":{"type":"integer","required":true},"operations":{"type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/variables\/batch"}]}},"\/elementor\/v1\/design-system-sync\/stylesheet":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/design-system-sync\/stylesheet"}]}},"\/elementor\/v1\/operations\/opt-in-v4":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/operations\/opt-in-v4"}]}},"\/elementor\/v1\/components":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"status":{"type":"string","enum":["publish","draft","autosave"],"required":true},"items":{"type":"array","items":{"type":"object","properties":{"uid":{"type":"string","required":true},"title":{"type":"string","required":true,"minLength":2,"maxLength":200},"elements":{"type":"array","required":true,"items":{"type":"object"}},"settings":{"type":"object","required":false}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components"}]}},"\/elementor\/v1\/components\/styles":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components\/styles"}]}},"\/elementor\/v1\/components\/create-validate":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","items":{"type":"object","properties":{"uid":{"type":"string","required":true},"title":{"type":"string","required":true,"minLength":2,"maxLength":200},"elements":{"type":"array","required":true,"items":{"type":"object"}},"settings":{"type":"object","required":false}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components\/create-validate"}]}},"\/elementor\/v1\/components\/overridable-props":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"componentIds":{"type":"array","items":{"type":"integer"},"description":"The component IDs to get overridable props for","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components\/overridable-props"}]}},"\/elementor\/v1\/components\/status":{"namespace":"elementor\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"status":{"type":"string","enum":["publish"],"required":true},"ids":{"type":"array","items":{"type":"number","required":true},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components\/status"}]}},"\/elementor\/v1\/components\/lock":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"componentId":{"type":"number","description":"The component ID to unlock","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components\/lock"}]}},"\/elementor\/v1\/components\/unlock":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"componentId":{"type":"number","description":"The component ID to unlock","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components\/unlock"}]}},"\/elementor\/v1\/components\/lock-status":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"componentId":{"type":"string","description":"The component ID to check lock status","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components\/lock-status"}]}},"\/elementor\/v1\/components\/archive":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"componentIds":{"type":"array","items":{"type":"number","required":true},"description":"The component IDs to archive","required":true},"status":{"type":"string","enum":["publish","draft","autosave"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components\/archive"}]}},"\/elementor\/v1\/components\/update-titles":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"components":{"type":"array","items":{"type":"object","properties":{"componentId":{"type":"number","required":true,"description":"The component ID to update title"},"title":{"type":"string","required":true,"description":"The new title for the component"}}},"required":true},"status":{"type":"string","enum":["publish","draft","autosave"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/components\/update-titles"}]}},"\/elementor\/v1\/feedback":{"namespace":"elementor\/v1\/feedback","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/feedback","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/feedback"}]}},"\/elementor\/v1\/feedback\/submit":{"namespace":"elementor\/v1\/feedback","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/feedback\/submit"}]}},"\/elementor\/v1\/angie\/consent":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/angie\/consent"}]}},"\/elementor\/v1\/agents-ready\/scan":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/agents-ready\/scan"}]}},"\/elementor\/v1\/template-library\/templates":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"title":{"type":"string","description":"The title of the document","required":false},"type":{"description":"The document type.","type":"string","enum":["page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item"],"required":true},"content":{"description":"Elementor data object","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/template-library\/templates"}]}},"\/elementor\/v1\/system-info":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/system-info"}]}},"\/elementor\/v1\/user-data\/current-user":{"namespace":"elementor\/v1","methods":["GET","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PATCH"],"args":{"suppressedMessages":{"type":"array","description":"Array of suppressed message keys","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/user-data\/current-user"}]}},"\/elementor\/v1\/global-widget\/templates":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/global-widget\/templates"}]}},"\/elementor-pro\/v1\/collection-loop\/loop-preview":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"query":{"description":"Resolved collection loop query settings.","type":"object","required":true},"document_id":{"description":"ID of the document the loop element belongs to. Required to pass the element instance to element-scoped query hooks.","type":"integer","required":false},"element_id":{"description":"ID of the collection-loop element. Required to pass the element instance to element-scoped query hooks.","type":"string","required":false},"force_empty":{"description":"When true, return an empty preview payload so the editor can design the empty state.","type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1\/collection-loop\/loop-preview"}]}},"\/elementor-pro\/v1\/posts-widget":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1\/posts-widget"}]}},"\/elementor\/v1\/form-submissions":{"namespace":"elementor\/v1","methods":["GET","DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"order_by":{"description":"Sort collection by object attribute.","type":"string","default":"created_at","enum":["created_at","id","main_meta_id"],"required":false},"status":{"description":"Limit result set to submissions assigned one or more statuses.","type":"string","default":"all","enum":["all","unread","read","trash"],"additionalProperties":{"context":"filter"},"required":false},"form":{"description":"Limit result set to submissions assigned to specific forms. The form id should follow this pattern {post_id}_{element_id} e.g: 10_476d0ce","type":"string","additionalProperties":{"context":"filter"},"required":false},"referer":{"description":"Limit result set to submissions assigned to specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false},"after":{"description":"Limit response to submissions sent after a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"before":{"description":"Limit response to submissions sent before a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false}}},{"methods":["DELETE"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true},"force":{"description":"Delete the object permanently.","type":"boolean","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true},"is_read":{"description":"mark whether the submission was read or not","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/form-submissions"}]}},"\/elementor\/v1\/form-submissions\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET","DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true},"force":{"description":"Delete the object permanently.","type":"boolean","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true},"is_read":{"description":"mark whether the submission was read or not","type":"boolean","required":false},"values":{"description":"Form field values, receive an array, the key should be the form field id and the value should be the value.","type":"object","required":false}}}]},"\/elementor\/v1\/form-submissions\/restore\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/form-submissions\/restore":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/form-submissions\/restore"}]}},"\/elementor\/v1\/form-submissions\/export":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":10000,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"order_by":{"description":"Sort collection by object attribute.","type":"string","default":"created_at","enum":["created_at","id","main_meta_id"],"required":false},"status":{"description":"Limit result set to submissions assigned one or more statuses.","type":"string","default":"all","enum":["all","unread","read","trash"],"additionalProperties":{"context":"filter"},"required":false},"form":{"description":"Limit result set to submissions assigned to specific forms. The form id should follow this pattern {post_id}_{element_id} e.g: 10_476d0ce","type":"string","additionalProperties":{"context":"filter"},"required":false},"referer":{"description":"Limit result set to submissions assigned to specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false},"after":{"description":"Limit response to submissions sent after a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"before":{"description":"Limit response to submissions sent before a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"additionalProperties":{"context":"filter"},"required":false},"format":{"description":"The format of the export (for now only csv).","enum":["csv"],"default":"csv","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/form-submissions\/export"}]}},"\/elementor\/v1\/form-submissions\/referer":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made, determines fields present in response. (only \"options\" available for now)","type":"string","enum":["options"],"default":"options","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"value":{"description":"Limit results specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/form-submissions\/referer"}]}},"\/elementor\/v1\/forms":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made, determines fields present in response. (only \"options\" available for now)","type":"string","enum":["options"],"default":"options","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/forms"}]}},"\/elementor-pro\/v1\/get-post-type-taxonomies":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"description":"The post type for which to fetch the list of taxonomies.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1\/get-post-type-taxonomies"}]}},"\/elementor-pro\/v1\/refresh-loop":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"The post ID of the page containing the loop.","type":"integer","required":true},"widget_id":{"description":"The ID of the loop widget.","type":"string","required":true},"widget_filters":{"description":"The filters for the loop widget.","type":"object","required":true},"widget_model":{"description":"The model of the loop widget. In Editor mode only.","type":"object","required":false},"pagination_base_url":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1\/refresh-loop"}]}},"\/elementor-pro\/v1\/refresh-search":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"The post ID of the page containing the loop.","type":"integer","required":true},"widget_id":{"description":"The ID of the loop widget.","type":"string","required":true},"widget_model":{"description":"The model of the loop widget. In Editor mode only.","type":"object","required":false},"breakpoint":{"description":"Active Elementor responsive device key (e.g. mobile, tablet, desktop).","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1\/refresh-search"}]}},"\/elementor-pro\/v1\/font-awesome-pro-icon":{"namespace":"elementor-pro\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"library":{"type":"string","required":true},"value":{"type":"string","required":true}}},{"methods":["POST"],"args":{"library":{"type":"string","required":true},"value":{"type":"string","required":true},"width":{"type":"integer","required":true},"height":{"type":"integer","required":true},"paths":{"type":"array","items":{"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1\/font-awesome-pro-icon"}]}},"\/elementor-pro\/v1\/custom-icon-svg":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"library":{"type":"string","required":true},"offset":{"type":"integer","minimum":0,"required":false},"limit":{"type":"integer","minimum":1,"maximum":250,"required":false},"value":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor-pro\/v1\/custom-icon-svg"}]}},"\/elementor\/v1\/notes":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"route_url":{"type":"string","description":"The URL of the route where the note was created at.","required":false},"status":{"type":"string","description":"The note status (e.g. \"publish\", \"draft\").","enum":["publish","draft"],"default":"publish","required":false},"is_resolved":{"type":"boolean","description":"Whether the note is resolved or not.","required":false},"parent_id":{"type":"integer","description":"The note's parent id (use 0 for top-level).","required":false},"post_id":{"type":"integer","description":"The ID of the post that the note is attached to.","required":false},"only_unread":{"type":"boolean","description":"Show only unread notes (represents an unread thread if one of its replies is unread).","required":false},"only_relevant":{"type":"boolean","description":"Show only notes that are relevant to the current user.","required":false},"order_by":{"type":"string","description":"A column to order the results by.","default":"last_activity_at","enum":["last_activity_at","created_at"],"required":false},"order":{"type":"string","description":"Results order direction.","default":"desc","enum":["asc","desc"],"required":false}}},{"methods":["POST"],"args":{"post_id":{"type":"integer","description":"The id of the post where the note was created at (can be template, post, page, etc.).","required":true},"element_id":{"type":"string","description":"Each note must be attached to an elementor element.","required":true},"content":{"type":"string","description":"The content of the note.","required":true},"position":{"type":"object","properties":{"x":{"required":true,"type":"number"},"y":{"required":true,"type":"number"}},"description":"The position of the note.","required":true},"mentioned_usernames":{"type":"array","description":"List of user names that have been mentioned in the note's content.","default":[],"items":{"type":"string","sanitize_callback":{}},"required":false},"route_post_id":{"description":"The ID of the post that's associated with the route (doesn't always exist, e.g: home page, archive)","required":false},"route_url":{"type":"string","description":"The URL of the route where the note was created at.","required":false},"route_title":{"type":"string","description":"The title of the route where the note was created at.","required":false},"parent_id":{"type":"integer","description":"If the new note is a reply to another note, the parent_id should be the thread's id.","default":0,"required":false},"is_public":{"type":"boolean","description":"Should this note be visible for everyone or just for its author.","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/notes"}]}},"\/elementor\/v1\/notes\/read-status":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"ids":{"type":"array","description":"The id's of the notes.","items":{"type":"integer"},"required":true}}},{"methods":["DELETE"],"args":{"ids":{"type":"array","description":"The id's of the notes.","items":{"type":"integer"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/notes\/read-status"}]}},"\/elementor\/v1\/notes\/summary":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"route_url":{"type":"string","description":"The URL of the route where the note was created at.","required":false},"status":{"type":"string","description":"The note status (e.g. \"publish\", \"draft\").","enum":["publish","draft"],"default":"publish","required":false},"is_resolved":{"type":"boolean","description":"Whether the note is resolved or not.","required":false},"parent_id":{"type":"integer","description":"The note's parent id (use 0 for top-level).","required":false},"post_id":{"type":"integer","description":"The ID of the post that the note is attached to.","required":false},"only_unread":{"type":"boolean","description":"Show only unread notes (represents an unread thread if one of its replies is unread).","required":false},"only_relevant":{"type":"boolean","description":"Show only notes that are relevant to the current user.","required":false},"order_by":{"type":"string","description":"A column to order the results by.","default":"last_activity_at","enum":["last_activity_at","created_at"],"required":false},"order":{"type":"string","description":"Results order direction.","default":"desc","enum":["asc","desc"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/notes\/summary"}]}},"\/elementor\/v1\/notes\/users":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"limit":{"type":"integer","description":"Limit the results.","required":false},"order_by":{"type":"string","description":"A column to order the results by.","default":"display_name","enum":["user_nicename","display_name","user_registered"],"required":false},"order":{"type":"string","description":"Results order direction.","default":"asc","enum":["asc","desc"],"required":false},"search":{"type":"string","description":"Filter users by a search term.","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/notes\/users"}]}},"\/elementor\/v1\/notes\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","description":"Note ID to find.","required":true}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"integer","description":"The id the note.","required":true},"content":{"type":"string","description":"The content of the note.","required":false},"mentioned_usernames":{"type":"array","description":"List of user names that have been mentioned in the note's content.","items":{"type":"string","sanitize_callback":{}},"required":false},"status":{"type":"string","description":"Note status can be draft or publish.","enum":["publish","draft"],"required":false},"is_public":{"type":"boolean","description":"Should this note be visible for everyone or just for its author.","required":false},"is_resolved":{"type":"boolean","description":"Is this note resolved and should be hidden.","required":false}}},{"methods":["DELETE"],"args":{"id":{"type":"integer","description":"The id of the note.","required":true},"force":{"type":"boolean","description":"Determine if it should be deleted permanently or change the status to trash.","default":false,"required":false}}}]},"\/rankmath-marketplace\/v1":{"namespace":"rankmath-marketplace\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath-marketplace\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath-marketplace\/v1"}]}},"\/rankmath-marketplace\/v1\/plugins":{"namespace":"rankmath-marketplace\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/rankmath-marketplace\/v1\/plugins"}]}},"\/rankmath-marketplace\/v1\/plugins\/active\/(?P<slug>[a-zA-Z0-9-_]+)":{"namespace":"rankmath-marketplace\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/faz\/v1\/settings\/pages":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"type":"string","maxLength":100,"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/pages"}]}},"\/faz\/v1\/settings":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false},"expiry":{"description":"Notice dismissal duration in seconds; zero dismisses permanently.","type":"integer","default":0,"minimum":0,"required":false}}},{"methods":["POST"],"args":{"api":{"description":"Language.","type":"object","required":false},"account":{"description":"Language.","type":"object","required":false},"consent_logs":{"description":"Language.","type":"object","required":false},"languages":{"description":"Language.","type":"object","required":false},"onboarding":{"description":"Language.","type":"object","required":false},"banner_control":{"description":"Banner control settings.","type":"object","required":false},"microsoft":{"description":"Microsoft consent settings.","type":"object","required":false},"scanner":{"description":"Scanner settings.","type":"object","required":false},"site_links":{"description":"Linked sites settings.","type":"object","required":false},"iab":{"description":"IAB TCF settings.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings"}]}},"\/faz\/v1\/settings\/notices\/(?P<notice>[a-zA-Z0-9-_]+)":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false},"expiry":{"description":"Notice dismissal duration in seconds; zero dismisses permanently.","type":"integer","default":0,"minimum":0,"required":false}}}]},"\/faz\/v1\/settings\/reinstall":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false},"expiry":{"description":"Notice dismissal duration in seconds; zero dismisses permanently.","type":"integer","default":0,"minimum":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/reinstall"}]}},"\/faz\/v1\/settings\/apply_filter":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false},"expiry":{"description":"Notice dismissal duration in seconds; zero dismisses permanently.","type":"integer","default":0,"minimum":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/apply_filter"}]}},"\/faz\/v1\/settings\/notices\/pageviews_overage_notice":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"force":{"type":"boolean","description":"Force fetch data","required":false},"expiry":{"description":"Notice dismissal duration in seconds; zero dismisses permanently.","type":"integer","default":0,"minimum":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/notices\/pageviews_overage_notice"}]}},"\/faz\/v1\/settings\/geolite2\/update":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/geolite2\/update"}]}},"\/faz\/v1\/settings\/geolite2\/status":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/geolite2\/status"}]}},"\/faz\/v1\/settings\/geo-bootstrap\/status":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/geo-bootstrap\/status"}]}},"\/faz\/v1\/settings\/export":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/export"}]}},"\/faz\/v1\/settings\/import":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/import"}]}},"\/faz\/v1\/settings\/withdrawal-link\/verify":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/withdrawal-link\/verify"}]}},"\/faz\/v1\/settings\/invalidate-consents":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/invalidate-consents"}]}},"\/faz\/v1\/settings\/onboarding":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"create_cookie_page":{"type":"boolean","required":false},"law":{"type":"string","enum":["gdpr","ccpa","both","popia"],"required":true},"language":{"type":"string","required":false},"banner_control":{"type":"object","properties":{"per_service_consent":{"type":"boolean"},"gtm_datalayer":{"type":"boolean"},"hide_from_bots":{"type":"boolean"},"cache_compatibility":{"type":"boolean"},"adblock_resilience":{"type":"boolean"}},"additionalProperties":false,"required":false},"gcm":{"type":"object","properties":{"enabled":{"type":"boolean"}},"additionalProperties":false,"required":false},"microsoft":{"type":"object","properties":{"uet_consent_mode":{"type":"boolean"},"clarity_consent":{"type":"boolean"}},"additionalProperties":false,"required":false},"iab":{"type":"object","properties":{"enabled":{"type":"boolean"},"cmp_id":{"type":"integer","minimum":0,"maximum":4095},"publisher_cc":{"type":"string","pattern":"^[A-Za-z]{0,2}$"}},"additionalProperties":false,"required":false},"geolocation":{"type":"object","properties":{"geo_targeting":{"type":"boolean"},"cache_geo_bootstrap":{"type":"boolean"},"target_regions":{"type":"array","items":{"type":"string","enum":["eu","uk","us","ca","br","au","jp","ch","za"]}},"default_behavior":{"type":"string","enum":["show_banner","no_banner"]}},"additionalProperties":false,"required":false},"payment_gateways":{"type":["object","array"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/onboarding"}]}},"\/faz\/v1\/settings\/onboarding\/recommendations":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/settings\/onboarding\/recommendations"}]}},"\/faz\/v1\/gcm":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"status":{"description":"GCM status.","type":"boolean","required":false},"default_settings":{"description":"Default settings.","type":"array","required":false},"wait_for_update":{"description":"Wait for update.","type":"integer","required":false},"url_passthrough":{"description":"Pass ad click information through URLs.","type":"boolean","required":false},"ads_data_redaction":{"description":"Redact ads data.","type":"boolean","required":false},"gacm_enabled":{"description":"Enable Google Additional Consent Mode.","type":"boolean","required":false},"gacm_provider_ids":{"description":"GACM provider IDs (comma-separated).","type":"string","required":false},"non_personalized_ads_fallback":{"description":"Serve non-personalized ads when marketing consent is denied.","type":"boolean","required":false},"advanced_mode":{"description":"Advanced Consent Mode: load Google tags before consent.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/gcm"}]}},"\/faz\/v1\/gvl":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/gvl"}]}},"\/faz\/v1\/gvl\/vendors":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/gvl\/vendors"}]}},"\/faz\/v1\/gvl\/vendors\/(?P<id>\\d+)":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/faz\/v1\/gvl\/update":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/gvl\/update"}]}},"\/faz\/v1\/gvl\/selected":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/gvl\/selected"}]}},"\/faz\/v1\/gvl\/suggest":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/gvl\/suggest"}]}},"\/faz\/v1\/languages":{"namespace":"faz\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/languages"}]}},"\/faz\/v1\/banners":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"ver":{"description":"Version","type":"string","required":false},"language":{"description":"Language of the banner","type":"string","required":false}}},{"methods":["POST"],"args":{"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"target_countries":{"description":"ISO-3166 alpha-2 country codes this banner targets. Empty = match every visitor.","type":"array","items":{"type":"string","pattern":"^[A-Z]{2}$"},"required":false},"priority":{"description":"Tie-break priority when multiple banners target the same country. Higher wins.","type":"integer","minimum":0,"required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/banners"}]}},"\/faz\/v1\/banners\/bulk":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"target_countries":{"description":"ISO-3166 alpha-2 country codes this banner targets. Empty = match every visitor.","type":"array","items":{"type":"string","pattern":"^[A-Z]{2}$"},"required":false},"priority":{"description":"Tie-break priority when multiple banners target the same country. Higher wins.","type":"integer","minimum":0,"required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/banners\/bulk"}]}},"\/faz\/v1\/banners\/(?P<id>[\\d]+)":{"namespace":"faz\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"target_countries":{"description":"ISO-3166 alpha-2 country codes this banner targets. Empty = match every visitor.","type":"array","items":{"type":"string","pattern":"^[A-Z]{2}$"},"required":false},"priority":{"description":"Tie-break priority when multiple banners target the same country. Higher wins.","type":"integer","minimum":0,"required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"target_countries":{"description":"ISO-3166 alpha-2 country codes this banner targets. Empty = match every visitor.","type":"array","items":{"type":"string","pattern":"^[A-Z]{2}$"},"required":false},"priority":{"description":"Tie-break priority when multiple banners target the same country. Higher wins.","type":"integer","minimum":0,"required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}}]},"\/faz\/v1\/banners\/preview":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"name":{"description":"Banner name for reference","type":"string","required":false},"slug":{"description":"Banner unique name","type":"string","required":false},"settings":{"description":"Banner settings.","type":"array","required":false},"contents":{"description":"Banner contents.","type":"object","required":false},"default":{"description":"Indicates whether the banner is default or not","type":"boolean","required":false},"target_countries":{"description":"ISO-3166 alpha-2 country codes this banner targets. Empty = match every visitor.","type":"array","items":{"type":"string","pattern":"^[A-Z]{2}$"},"required":false},"priority":{"description":"Tie-break priority when multiple banners target the same country. Higher wins.","type":"integer","minimum":0,"required":false},"date_modified":{"description":"The date the banner was last modified, as GMT.","type":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/banners\/preview"}]}},"\/faz\/v1\/banners\/presets":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"ver":{"description":"Version","type":"string","required":false},"language":{"description":"Language of the banner","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/banners\/presets"}]}},"\/faz\/v1\/banners\/design-presets":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/banners\/design-presets"}]}},"\/faz\/v1\/banners\/configs":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"ver":{"description":"Version","type":"string","required":false},"language":{"description":"Language of the banner","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/banners\/configs"}]}},"\/faz\/v1\/cookies\/categories":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"lang":{"description":"Language of the cookie","type":"string","required":false},"category":{"description":"Cookie category","type":"integer","required":false}}},{"methods":["POST"],"args":{"name":{"description":"Cookie category name.","type":"object","required":false},"slug":{"description":"Cookie category unique name","type":"string","required":false},"language":{"description":"Cookie category language","type":"string","required":false},"description":{"description":"Cookie category description.","type":"object","required":false},"prior_consent":{"description":"Whether the category is granted before any consent action (an admin-declared consent-exempt category, e.g. first-party anonymised analytics). True pre-grants it client-side only; the server-side blocker keeps its scripts blocked under an opt-in law until the visitor acts.","type":"boolean","required":false},"priority":{"description":"Category display priority.","type":"integer","required":false},"visibility":{"description":"Whether category is visible in audit table.","type":"boolean","required":false},"sell_personal_data":{"description":"Whether the category involves SELLING personal data (CCPA\/CPRA sale).","type":"boolean","required":false},"share_personal_data":{"description":"Whether the category involves SHARING personal data for cross-context behavioural advertising (CPRA share).","type":"boolean","required":false},"cookie_list":{"description":"List of cookies in this category.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/categories"}]}},"\/faz\/v1\/cookies\/categories\/bulk":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"name":{"description":"Cookie category name.","type":"object","required":false},"slug":{"description":"Cookie category unique name","type":"string","required":false},"language":{"description":"Cookie category language","type":"string","required":false},"description":{"description":"Cookie category description.","type":"object","required":false},"prior_consent":{"description":"Whether the category is granted before any consent action (an admin-declared consent-exempt category, e.g. first-party anonymised analytics). True pre-grants it client-side only; the server-side blocker keeps its scripts blocked under an opt-in law until the visitor acts.","type":"boolean","required":false},"priority":{"description":"Category display priority.","type":"integer","required":false},"visibility":{"description":"Whether category is visible in audit table.","type":"boolean","required":false},"sell_personal_data":{"description":"Whether the category involves SELLING personal data (CCPA\/CPRA sale).","type":"boolean","required":false},"share_personal_data":{"description":"Whether the category involves SHARING personal data for cross-context behavioural advertising (CPRA share).","type":"boolean","required":false},"cookie_list":{"description":"List of cookies in this category.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/categories\/bulk"}]}},"\/faz\/v1\/cookies\/categories\/(?P<id>[\\d]+)":{"namespace":"faz\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"name":{"description":"Cookie category name.","type":"object","required":false},"slug":{"description":"Cookie category unique name","type":"string","required":false},"language":{"description":"Cookie category language","type":"string","required":false},"description":{"description":"Cookie category description.","type":"object","required":false},"prior_consent":{"description":"Whether the category is granted before any consent action (an admin-declared consent-exempt category, e.g. first-party anonymised analytics). True pre-grants it client-side only; the server-side blocker keeps its scripts blocked under an opt-in law until the visitor acts.","type":"boolean","required":false},"priority":{"description":"Category display priority.","type":"integer","required":false},"visibility":{"description":"Whether category is visible in audit table.","type":"boolean","required":false},"sell_personal_data":{"description":"Whether the category involves SELLING personal data (CCPA\/CPRA sale).","type":"boolean","required":false},"share_personal_data":{"description":"Whether the category involves SHARING personal data for cross-context behavioural advertising (CPRA share).","type":"boolean","required":false},"cookie_list":{"description":"List of cookies in this category.","type":"object","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false}}}]},"\/faz\/v1\/cookies":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"lang":{"description":"Language of the cookie","type":"string","required":false},"category":{"description":"Cookie category","type":"integer","required":false}}},{"methods":["POST"],"args":{"date_modified":{"description":"The date the cookie was last modified, as GMT.","type":"string","required":false},"name":{"description":"Cookie name.","type":"string","required":false},"category":{"description":"Cookie category name.","type":"integer","required":false},"slug":{"description":"Cookie unique name","type":"string","required":false},"description":{"description":"Cookie description.","type":"object","required":false},"duration":{"description":"Cookie duration","type":"object","required":false},"language":{"description":"Cookie language.","type":"string","required":false},"type":{"description":"Cookie type.","type":"integer","required":false},"domain":{"description":"Cookie domain.","type":"string","required":false},"discovered":{"description":"If cookies added from the scanner or not.","type":"boolean","required":false},"url_pattern":{"description":"URL patterns for blocking purposes","type":"string","required":false},"transfer":{"description":"Third-country (Schrems II) personal-data transfer disclosure for this cookie.","type":"object","properties":{"enabled":{"type":"boolean"},"countries":{"type":"object"},"safeguard":{"type":"object"}},"required":false},"opt_in_script":{"description":"JavaScript executed when this cookie's category is accepted.","type":"string","maxLength":10000,"required":false},"opt_out_script":{"description":"JavaScript executed when this cookie's category is rejected or revoked.","type":"string","maxLength":10000,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies"}]}},"\/faz\/v1\/cookies\/bulk-update":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/bulk-update"}]}},"\/faz\/v1\/cookies\/bulk-delete":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"reason":{"type":"string","default":"","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/bulk-delete"}]}},"\/faz\/v1\/cookies\/restore-deleted":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/restore-deleted"}]}},"\/faz\/v1\/cookies\/deleted-batches":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/deleted-batches"}]}},"\/faz\/v1\/blocker-templates":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/blocker-templates"}]}},"\/faz\/v1\/cookies\/catalogue-services":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/catalogue-services"}]}},"\/faz\/v1\/cookies\/register-service":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"service_id":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/register-service"}]}},"\/faz\/v1\/cookies\/(?P<id>[\\d]+)":{"namespace":"faz\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"date_modified":{"description":"The date the cookie was last modified, as GMT.","type":"string","required":false},"name":{"description":"Cookie name.","type":"string","required":false},"category":{"description":"Cookie category name.","type":"integer","required":false},"slug":{"description":"Cookie unique name","type":"string","required":false},"description":{"description":"Cookie description.","type":"object","required":false},"duration":{"description":"Cookie duration","type":"object","required":false},"language":{"description":"Cookie language.","type":"string","required":false},"type":{"description":"Cookie type.","type":"integer","required":false},"domain":{"description":"Cookie domain.","type":"string","required":false},"discovered":{"description":"If cookies added from the scanner or not.","type":"boolean","required":false},"url_pattern":{"description":"URL patterns for blocking purposes","type":"string","required":false},"transfer":{"description":"Third-country (Schrems II) personal-data transfer disclosure for this cookie.","type":"object","properties":{"enabled":{"type":"boolean"},"countries":{"type":"object"},"safeguard":{"type":"object"}},"required":false},"opt_in_script":{"description":"JavaScript executed when this cookie's category is accepted.","type":"string","maxLength":10000,"required":false},"opt_out_script":{"description":"JavaScript executed when this cookie's category is rejected or revoked.","type":"string","maxLength":10000,"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false}}}]},"\/faz\/v1\/cookies\/scrape":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"names":{"type":"array","description":"Array of cookie names to look up.","items":{"type":"string"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/scrape"}]}},"\/faz\/v1\/cookies\/definitions\/update":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/definitions\/update"}]}},"\/faz\/v1\/cookies\/definitions":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/cookies\/definitions"}]}},"\/faz\/v1\/consent_logs":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Filter by consent status.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/consent_logs"}]}},"\/faz\/v1\/consent_logs\/statistics":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/consent_logs\/statistics"}]}},"\/faz\/v1\/consent_logs\/stats":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"description":"Number of days to look back.","type":"integer","default":30,"minimum":1,"maximum":365,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/consent_logs\/stats"}]}},"\/faz\/v1\/consent_logs\/ab_test":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"description":"Look-back window in days; 0 means all time.","type":"integer","default":30,"minimum":0,"maximum":3650,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/consent_logs\/ab_test"}]}},"\/faz\/v1\/consent_logs\/export":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"paged":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Filter by consent status.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/consent_logs\/export"}]}},"\/faz\/v1\/consent_logs\/(?P<consent_id>[A-Za-z0-9=+\\\/_.-]+)":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/faz\/v1\/scans":{"namespace":"faz\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["POST"],"args":{"max_pages":{"default":20,"description":"Maximum pages to scan.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans"}]}},"\/faz\/v1\/scans\/info":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans\/info"}]}},"\/faz\/v1\/scans\/discover":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"max_pages":{"type":"integer","default":20,"minimum":1,"maximum":2000,"required":false},"fingerprint":{"type":"string","default":"","required":false},"scan_id":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans\/discover"}]}},"\/faz\/v1\/scans\/server-scan":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"url":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans\/server-scan"}]}},"\/faz\/v1\/scans\/import":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"scan_id":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans\/import"}]}},"\/faz\/v1\/scans\/heartbeat":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"scan_id":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans\/heartbeat"}]}},"\/faz\/v1\/scans\/session":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans\/session"}]}},"\/faz\/v1\/scans\/abort":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"scan_id":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans\/abort"}]}},"\/faz\/v1\/scans\/(?P<id>[\\d]+)":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the resource.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}}]},"\/faz\/v1\/scans\/debug-log":{"namespace":"faz\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans\/debug-log"}]}},"\/faz\/v1\/scans\/set-aside\/declare":{"namespace":"faz\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"name":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/scans\/set-aside\/declare"}]}},"\/faz\/v1\/pageviews\/chart":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"type":"integer","default":7,"required":false},"from":{"type":"string","required":false},"to":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/pageviews\/chart"}]}},"\/faz\/v1\/pageviews\/banner-stats":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"type":"integer","default":30,"required":false},"from":{"type":"string","required":false},"to":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/pageviews\/banner-stats"}]}},"\/faz\/v1\/pageviews\/daily":{"namespace":"faz\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"type":"integer","default":30,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/faz\/v1\/pageviews\/daily"}]}},"\/elementor\/v1\/library\/connect":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"token":{"type":"string","description":"Connect CLI token","required":true}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/library\/connect"}]}},"\/elementor\/v1\/send-event":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["POST"],"args":{"event_data":{"description":"All the recorded event data in JSON format","type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/elementor\/v1\/send-event"}]}},"\/elementor\/v1\/events\/api\/(?P<path>.+)":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":[]}]},"\/elementor\/v1\/events\/libs\/(?P<file>[\\w\\-.]+)":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/mcp":{"namespace":"mcp","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"mcp","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mcp"}]}},"\/mcp\/mcp-oauth-server":{"namespace":"mcp","methods":["POST","GET","DELETE"],"endpoints":[{"methods":["POST","GET","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mcp\/mcp-oauth-server"}]}},"\/mcp\/mcp-adapter-default-server":{"namespace":"mcp","methods":["POST","GET","DELETE"],"endpoints":[{"methods":["POST","GET","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/mcp\/mcp-adapter-default-server"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"art":{"description":"Limit result set to items with specific terms assigned in the art taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"art_exclude":{"description":"Limit result set to items except those with specific terms assigned in the art taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"art":{"description":"The terms assigned to the post in the art taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"art":{"description":"The terms assigned to the post in the art taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"art":{"description":"The terms assigned to the post in the art taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type or media types.","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type or MIME types.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"generate_sub_sizes":{"type":"boolean","default":true,"description":"Whether to generate image sub sizes.","required":false},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false},"url":{"type":"string","format":"uri","description":"URL of an external image to sideload into the media library, instead of uploading a file.","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Flip","properties":{"type":{"description":"Flip type.","type":"string","enum":["flip"]},"args":{"description":"Flip arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Flip direction.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"Whether to flip in the horizontal direction.","type":"boolean"},"vertical":{"description":"Whether to flip in the vertical direction.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/sideload":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"image_size":{"description":"Image size. Can be a single size name or an array of size names to register the same file under multiple sizes.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/finalize":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"sub_sizes":{"description":"Array of sub-size metadata collected from sideload responses.","type":"array","default":[],"maxItems":100,"items":{"type":"object","properties":{"image_size":{"description":"Size name, or an array of size names when a single file is registered under multiple sizes with matching dimensions.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"width":{"type":"integer","minimum":1},"height":{"type":"integer","minimum":1},"file":{"type":"string","minLength":1},"mime_type":{"type":"string","pattern":"^image\/.*"},"filesize":{"type":"integer","minimum":1},"original_image":{"type":"string","minLength":1}}},"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false}},"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID of global styles config.","type":"integer","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/e-floating-buttons":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/e-floating-buttons"}]}},"\/wp\/v2\/e-floating-buttons\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/elementor_library":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/elementor_library"}]}},"\/wp\/v2\/elementor_library\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","e-div-block","e-flexbox","e-grid","e-form","cloud-template-preview","elementor_component","widget","popup","header","footer","single","single-post","single-page","archive","search-results","error-404","code_snippet","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/elementor_snippet":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"_elementor_location":{"type":"string","title":"","description":"","default":"elementor_head","enum":["elementor_head","elementor_body_start","elementor_body_end"]},"_elementor_priority":{"type":"integer","title":"","description":"","default":1},"_elementor_code":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/elementor_snippet"}]}},"\/wp\/v2\/elementor_snippet\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false},"_elementor_location":{"type":"string","title":"","description":"","default":"elementor_head","enum":["elementor_head","elementor_body_start","elementor_body_end"]},"_elementor_priority":{"type":"integer","title":"","description":"","default":1},"_elementor_code":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/ats_job":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"ats_location":{"description":"Limit result set to items with specific terms assigned in the ats_location taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ats_location_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ats_location taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ats_department":{"description":"Limit result set to items with specific terms assigned in the ats_department taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ats_department_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ats_department taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ats_employment_type":{"description":"Limit result set to items with specific terms assigned in the ats_employment_type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ats_employment_type_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ats_employment_type taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ats_location":{"description":"The terms assigned to the post in the ats_location taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ats_department":{"description":"The terms assigned to the post in the ats_department taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ats_employment_type":{"description":"The terms assigned to the post in the ats_employment_type taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/ats_job"}]}},"\/wp\/v2\/ats_job\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ats_location":{"description":"The terms assigned to the post in the ats_location taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ats_department":{"description":"The terms assigned to the post in the ats_department taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ats_employment_type":{"description":"The terms assigned to the post in the ats_employment_type taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/ats_job\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_mbp_gutenberg_autopost":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ats_location":{"description":"The terms assigned to the post in the ats_location taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ats_department":{"description":"The terms assigned to the post in the ats_department taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ats_employment_type":{"description":"The terms assigned to the post in the ats_employment_type taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/ats_job\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/rm_content_editor":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/rm_content_editor"}]}},"\/wp\/v2\/rm_content_editor\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/rm_content_editor\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/rm_content_editor\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/rank_math_schema":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/rank_math_schema"}]}},"\/wp\/v2\/rank_math_schema\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/art":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/art"}]}},"\/wp\/v2\/art\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/ats_location":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/ats_location"}]}},"\/wp\/v2\/ats_location\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/ats_department":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/ats_department"}]}},"\/wp\/v2\/ats_department\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/ats_employment_type":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/ats_employment_type"}]}},"\/wp\/v2\/ats_employment_type\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/rank_math_redirection_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/rank_math_redirection_category"}]}},"\/wp\/v2\/rank_math_redirection_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","de_DE","fr_FR"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","e-floating-buttons","elementor_library","ats_job","category","post_tag","art","ats_location","ats_department","ats_employment_type","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"hello_elementor_settings_description_meta_tag":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_skip_link":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_header_footer":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_page_title":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_hello_style":{"title":"","description":"","type":"string","required":false},"hello_elementor_settings_hello_theme":{"title":"","description":"","type":"string","required":false},"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"url":{"title":"","description":"Site URL.","type":"string","format":"uri","required":false},"email":{"title":"","description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false},"elementor_one_welcome_screen_completed":{"title":"","description":"Elementor One Welcome Screen Completed","type":"boolean","required":false},"elementor_one_dismiss_connect_alert":{"title":"","description":"Elementor One Dismiss Connect Alert","type":"boolean","required":false},"elementor_one_dismiss_elementor_one_subscription_alert":{"title":"","description":"Elementor One Dismiss Elementor One Subscription Alert","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Unique identifier for the ability category.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Input parameters for the ability execution.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limit results to abilities in specific ability category.","type":"string","required":false},"namespace":{"description":"Limit results to abilities in a specific namespace.","type":"string","required":false},"meta":{"description":"Limit results to abilities matching all of the given meta fields.","type":"object","properties":{"annotations":{"description":"Limit results to abilities matching the given behavioral annotations.","type":"object","properties":{"readonly":{"description":"Whether the ability does not modify its environment.","type":["boolean","null"]},"destructive":{"description":"Whether the ability may perform destructive updates to its environment.","type":["boolean","null"]},"idempotent":{"description":"Whether repeated calls with the same arguments have no additional effect.","type":["boolean","null"]}},"additionalProperties":true}},"additionalProperties":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false}}}]},"\/wp\/v2\/icons":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/icons"}]}},"\/wp\/v2\/icons\/(?P<collection>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}]},"\/wp\/v2\/icons\/(?P<name>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?\/[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Icon name.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/icon-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/icon-collections"}]}},"\/wp\/v2\/icon-collections\/(?P<slug>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Icon collection slug.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/view-config":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"description":"Entity kind.","type":"string","required":true},"name":{"description":"Entity name.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/view-config"}]}}},"site_logo":1937,"site_icon":119,"site_icon_url":"https:\/\/www.torck.io\/wp-content\/uploads\/2026\/06\/cropped-favicon.png","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_logo","href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/media\/1937"},{"embeddable":true,"type":"site_icon","href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/media\/119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}