{"id":6332,"date":"2026-10-23T13:29:18","date_gmt":"2026-10-23T13:29:18","guid":{"rendered":"https:\/\/www.torck.io\/?p=6332"},"modified":"2026-10-30T15:50:05","modified_gmt":"2026-10-30T15:50:05","slug":"nemotron-super-vl","status":"publish","type":"post","link":"https:\/\/www.torck.io\/en\/nemotron-super-vl\/","title":{"rendered":"Nemotron 3.5 Super VL: What Hardware Is Now Needed for In-House Document AI?"},"content":{"rendered":"<p><!-- Fokus-Keyword: Nemotron 3.5 Super VL (sekund\u00e4r: Dokumenten-KI On-Premise, Nemotron Hardware) | Funnel: MOFU | Quellen gepr\u00fcft 19.10.2026 --><\/p>\n<p>On October 15, 2026, NVIDIA released Nemotron 3.5 Super VL, an open model that processes text, images, document pages, and short videos. For IT managers and those responsible for digitalization in industry and commerce (such as in the goods receiving department of an automotive supplier or in the order processing department of an intralogistics provider) this raises a specific question: Can delivery slips, factory certificates, and technical documentation be analyzed using a model that runs entirely in-house, and what hardware is required to do so?<\/p>\n<div class=\"tk-key\"><b>Short answer<\/b><\/p>\n<p><a href=\"#was-passiert\">Nemotron 3.5 Super VL<\/a> is an image-text model with 120 billion parameters that NVIDIA has approved for use on a single DGX Spark, an H200, or two H100s. The OpenMDW-1.1 license permits commercial in-house use with no revenue cap. For a pilot project with your own documents, a single DGX Spark at a list price of $6,950 is sufficient. For production use with multiple concurrent requests, we estimate that a server with an H200 is required. Before purchasing, test the model with 100 to 200 of your own documents, as English is the model\u2019s primary language (as of October 19, 2026).<\/p>\n<\/div>\n<div class=\"tk-tablewrap\">\n<table>\n<caption>Nemotron 3.5 Super VL Specifications, as of October 19, 2026. Sources: NVIDIA, blog, and model card on Hugging Face (October 15, 2026), OpenMDW-1.1 license text<\/caption>\n<thead>\n<tr>\n<th>Specification<\/th>\n<th>Nemotron 3.5 Super VL<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Publisher<\/td>\n<td>NVIDIA Corporation<\/td>\n<\/tr>\n<tr>\n<td>Architecture<\/td>\n<td>Mixture of Experts consisting of Mamba-2 and Transformer layers with an image encoder<\/td>\n<\/tr>\n<tr>\n<td>Parameters<\/td>\n<td>120 billion total, 12 billion active per token<\/td>\n<\/tr>\n<tr>\n<td>Input<\/td>\n<td>Text, images (JPEG, PNG), document pages as images, videos up to 2 minutes long<\/td>\n<\/tr>\n<tr>\n<td>Context window<\/td>\n<td>Up to 1 million tokens<\/td>\n<\/tr>\n<tr>\n<td>Languages<\/td>\n<td>English as the primary language; post-training also covered German, French, Italian, Spanish, Japanese, and Chinese<\/td>\n<\/tr>\n<tr>\n<td>Formats<\/td>\n<td>BF16, NVFP4 (4-bit), base model<\/td>\n<\/tr>\n<tr>\n<td>License<\/td>\n<td>OpenMDW-1.1, commercial use permitted<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2 id=\"was-passiert\">What NVIDIA Has Released<\/h2>\n<p>NVIDIA presents Super VL as a model for agents that read documents, analyze tables and charts, and call tools (<a href=\"https:\/\/blogs.nvidia.com\/blog\/nemotron-3-5-super-vl\/\" target=\"_blank\" rel=\"noopener\">NVIDIA Blog<\/a>, Oct. 15, 2026). In addition to the weights, NVIDIA has released training data and recipes so that companies can fine-tune the model on their own data. The claim that Super VL runs up to five times faster than comparable open models comes from the manufacturer. On the same day, NVIDIA released Nemotron 3.5 Bolt 74B-A9B, a smaller image-text variant with native 2-bit quantization that fits into 24 GB of graphics memory.<\/p>\n<p>Initial external results are now available. As an early-access partner, Thoughtworks reduced the model to 4 bits: The weights shrank from 231.8 to 68.1 GiB, making it fit on a single H200. Retraining for a specific task took about three hours on four H200s (<a href=\"https:\/\/research.thoughtworks.com\/library\/nemotron-3-5-super-vl-test\" target=\"_blank\" rel=\"noopener\">Thoughtworks<\/a>, 10\/2026). These figures are based on a preliminary version dated September 21, not on the final version.<\/p>\n<div class=\"tk-stat\"><strong>12 bn<\/strong><\/p>\n<p>parameters are active per token, but all 120 billion have to be stored. That is why memory determines the hardware.<\/p>\n<p><cite>NVIDIA, Model Card Nemotron 3.5 Super VL, 10\/2026<\/cite><\/div>\n<h2 id=\"hardware\">Hardware requirements for running Large 4 in-house<\/h2>\n<p>NVIDIA lists four target systems for the 4-bit version. According to the model card, NVFP4 runs with 16-bit activations on older cards without the Blackwell architecture, which makes it slower than on Blackwell.<\/p>\n<div class=\"tk-tablewrap\">\n<table>\n<caption>Hardware variants, as of October 19, 2026. Sources: NVIDIA Model Cards Super VL and Bolt (October 15, 2026), vLLM recipes, Unsloth documentation, DGX Spark list price according to the NVIDIA Store (October 2, 2026)<\/caption>\n<thead>\n<tr>\n<th>System<\/th>\n<th>Format<\/th>\n<th>Note<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1\u00d7 DGX Spark (128 GB)<\/td>\n<td>NVFP4<\/td>\n<td>Text and image, NVIDIA quick-start configuration with one request at a time, list price $6,950<\/td>\n<\/tr>\n<tr>\n<td>1\u00d7 RTX PRO 6000 (96 GB)<\/td>\n<td>NVFP4<\/td>\n<td>vLLM recipe with 16,384 tokens of context<\/td>\n<\/tr>\n<tr>\n<td>1\u00d7 H200 or 2\u00d7 H100<\/td>\n<td>NVFP4<\/td>\n<td>Text, images, and video, according to NVIDIA<\/td>\n<\/tr>\n<tr>\n<td>4\u00d7 H100 or 2\u00d7 GB200<\/td>\n<td>BF16<\/td>\n<td>Full precision, basis for your own fine-tuning<\/td>\n<\/tr>\n<tr>\n<td>Graphics card with 24 to 32 GB<\/td>\n<td>Bolt 74B-A9B only<\/td>\n<td>Super VL doesn't fit into any quantization; the smallest version takes up 46.1 GB<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2 id=\"rechnung\">Calculation Example: Goods Receipt at an Automotive Supplier<\/h2>\n<p>An automotive supplier processes 800 delivery notes and factory certificates from approximately 150 suppliers daily in its receiving department. Let's assume it takes 2 minutes to enter each document manually.<\/p>\n<ul>\n<li>Manual effort: 800 \u00d7 2 minutes equals 1,600 minutes, or about 27 hours per workday, which is roughly three full-time positions.<\/li>\n<li>Machine time budget: When processing over two shifts, 57,600 seconds are available, which amounts to 72 seconds per document.<\/li>\n<li>Hardware: A DGX Spark has a list price of $6,950. Whether it can maintain a processing time of 72 seconds per document when handling a single request remains to be seen in a load test using real documents; NVIDIA does not publish throughput figures for this.<\/li>\n<\/ul>\n<p>In this example, the hardware is the smaller expense. The main costs come from the integration with the ERP system and the goods receipt posting, the validation rules for quantities and batches, and the need for employees to approve fields where data is uncertain. Only once the pilot demonstrates a stable recognition rate will it be worth investing in a server for multiple locations.<\/p>\n<h2 id=\"optionen\">Options for In-House Document AI<\/h2>\n<div class=\"tk-tablewrap\">\n<table>\n<caption>Options for IT management, as of October 19, 2026. Sources: NVIDIA, OpenMDW-1.1 license text, our own assessment<\/caption>\n<thead>\n<tr>\n<th>Option<\/th>\n<th>Effort<\/th>\n<th>Costs<\/th>\n<th>Risk<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Do nothing<\/td>\n<td>None<\/td>\n<td>None<\/td>\n<td>Manual data entry remains, and knowledge of document AI is missing in the next budget round<\/td>\n<\/tr>\n<tr>\n<td>Test via Hosted API (NVIDIA, OpenRouter)<\/td>\n<td>A few days<\/td>\n<td>Usage-based<\/td>\n<td>Data leaves the company; use anonymized documents only<\/td>\n<\/tr>\n<tr>\n<td>Pilot on DGX Spark<\/td>\n<td>3 to 4 weeks<\/td>\n<td>List price: $6,950 plus project costs<\/td>\n<td>One request at a time, not a production system<\/td>\n<\/tr>\n<tr>\n<td>Server with an H200 or two H100s<\/td>\n<td>Sizing, Data Center Space, Operations<\/td>\n<td>Server investment; pricing varies depending on configuration<\/td>\n<td>Only pays off once the recognition rate is proven<\/td>\n<\/tr>\n<tr>\n<td>Bolt 74B-A9B on an existing GPU<\/td>\n<td>1 to 2 weeks<\/td>\n<td>Existing hardware with 24 GB or more<\/td>\n<td>Less capable than Super VL<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2 id=\"eignung\">What the model is suitable for<\/h2>\n<p>Super VL targets documents in which text, tables, and images belong together: delivery notes with stamps, test reports with photos, measurement reports with charts, maintenance manuals, and spare parts lists. In the CharXiv chart test, NVIDIA reports 80.8 percent. According to the model card, documents are fed into the model as page images with accompanying text; CAD files must first be exported as images. For simple searches in manuals, a smaller text model is often sufficient, as the <a href=\"\/en\/open-source-llm-comparison\/\">comparison of open-source LLMs<\/a> shows.<\/p>\n<p>About the license: OpenMDW-1.1 permits use, modification, and distribution without a revenue cap. Anyone who distributes the model must include the license text and notices of origin. If a user sues claiming that the model infringes a patent or copyright, their rights terminate. No conditions apply to the outputs. Anyone who runs the weights themselves sends no data to NVIDIA.<\/p>\n<div class=\"tk-note\"><b>What the Numbers Don't Show<\/b>The performance figures come mostly from NVIDIA. According to the model card, the 4-bit version loses noticeably in some tests, from 77.72 to 66.31 points in the WebVoyager web agent test and from 76.91 to 73.76 in the multilingual MMLU-ProX. There are no independent measurements for German documents yet. A test with your own documents is worth more than any benchmark.<\/div>\n<div class=\"tk-inline-cta\">\n<p><b>Document Pilot with Nemotron 3.5 Super VL<\/b>We will analyze 200 of your documents (such as delivery notes, factory certificates, or test reports) containing approved or anonymized data in a test environment. Within 15 business days, you\u2019ll receive the recognition rate per field, the processing time per document, a hardware recommendation between the DGX Spark and a server, and a cost estimate based on your volume. Initial consultation: 30 minutes, free of charge, with a response within one business day.<\/p>\n<p><a class=\"tk-btn\" href=\"\/en\/?anfrage=nemotron-super-vl#contact-us\">Request a pilot<\/a><\/div>\n<h2 id=\"haeufige-fragen\">Frequently asked questions<\/h2>\n<h3 class=\"tk-faq-item\" id=\"grafikkarte\">Does Nemotron 3.5 Super VL run on an RTX 4090 or 5090?<\/h3>\n<p>No. The smallest available quantization takes up 46.1 GB, while an RTX 5090 has 32 GB. For cards with 24 to 32 GB, NVIDIA has released Nemotron 3.5 Bolt 74B-A9B, which also processes images.<\/p>\n<h3 class=\"tk-faq-item\" id=\"lizenz\">Is it permitted to use Nemotron 3.5 Super VL for commercial purposes?<\/h3>\n<p>Yes. The OpenMDW-1.1 license permits commercial use without any revenue or user thresholds. When the model is distributed, the license text and attribution information must be included.<\/p>\n<h3 class=\"tk-faq-item\" id=\"deutsch\">Does the model understand German documents?<\/h3>\n<p>NVIDIA lists German as one of six additional languages in post-training; the primary language is English. Only a test with your own documents shows how well technical terms, handwriting, and stamps on German delivery notes are recognized.<\/p>\n<h2 id=\"naechster-schritt\">The next step<\/h2>\n<p>torck designs and operates open language models in the data centers of industrial and commercial clients, handling everything from model selection and integration with ERP and archive systems to day-to-day operations. During the initial consultation, we determine whether your documents require an image-text model and which hardware is best suited for the task. The page provides an overview of document processing with AI <a href=\"\/en\/ai-document-processing\/\">Document Processing with AI<\/a>. <a href=\"\/en\/ai-consulting\/\">AI consulting for on-premises LLMs<\/a>.<\/p>\n<p>Read more: To find out whether it's worth buying this hardware right now, check out the article on <a href=\"\/en\/buy-ai-hardware\/\">AI Hardware 2027<\/a>. What a trillion-parameter model requires is covered in the article on <a href=\"\/en\/mistral-large-4\/\">Mistral Large 4<\/a>. How companies run language models themselves is described in the article on <a href=\"\/en\/on-premise-llm-for-business\/\">Running an LLM on premises<\/a>.<\/p>\n<aside class=\"tk-llm-blog-link\">\n<p>Use the free LLM Finder to calculate memory requirements, context, and quantization for document tasks. <a href=\"https:\/\/www.torck.io\/en\/llm-finder\/documents-on-this-computer\/\">Go to the LLM Finder for Documents<\/a><\/p>\n<\/aside>","protected":false},"excerpt":{"rendered":"<p>On October 15, 2026, NVIDIA released Nemotron 3.5 Super VL, an open image-to-text model with 120 billion parameters, under the OpenMDW-1.1 license. According to NVIDIA, it runs on a DGX Spark, one H200, or two H100s and is suitable for delivery notes, test reports, and technical documentation.<\/p>","protected":false},"author":10,"featured_media":6335,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_mbp_gutenberg_autopost":false,"footnotes":""},"categories":[24],"tags":[],"art":[],"class_list":["post-6332","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ki-beratung"],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/posts\/6332","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/comments?post=6332"}],"version-history":[{"count":4,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/posts\/6332\/revisions"}],"predecessor-version":[{"id":7071,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/posts\/6332\/revisions\/7071"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/media\/6335"}],"wp:attachment":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/media?parent=6332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/categories?post=6332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/tags?post=6332"},{"taxonomy":"art","embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/art?post=6332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}