{"id":6619,"date":"2026-10-29T05:44:34","date_gmt":"2026-10-29T05:44:34","guid":{"rendered":"https:\/\/www.torck.io\/?p=6619"},"modified":"2026-10-30T15:50:06","modified_gmt":"2026-10-30T15:50:06","slug":"net-8-end-of-support","status":"publish","type":"post","link":"https:\/\/www.torck.io\/en\/net-8-supportende\/","title":{"rendered":"Node2Shell and the End of .NET 8 Support: Which Applications to Rebuild Now"},"content":{"rendered":"<p><!-- Fokus-Keyword: .NET 8 Supportende (sekund\u00e4r: Node2Shell, Node.js Sicherheitsl\u00fccke, CVE-2026-111497, Brotli Sicherheitsl\u00fccke) | Funnel: MOFU\/BOFU | Quellen gepr\u00fcft 29.10.2026 --><\/p>\n<p>Since October 27, 2026, the U.S. agency CISA has listed the Brotli vulnerability CVE-2026-111497, known as Node2Shell, as actively exploited. The vulnerability resides in the Brotli decoder included in Node.js, .NET, Python packages, Envoy, and many Electron-based desktop applications. Patches are only available for supported runtime environments, and support for .NET 8 and .NET 9 ends as early as November 10, 2026. This affects IT management in industry and commerce with their own portals, interface services, and warehouse tools, as well as machine manufacturers who use Node.js or .NET in user interfaces and service tools.<\/p>\n<div class=\"tk-key\"><b>Short answer<\/b><\/p>\n<p><a href=\"#was-ist-passiert\">Applications running on Node.js 22, 24, or 26 and on .NET 8, 9, or 10<\/a> should be updated to the fixed versions now, and their container images and self-contained applications rebuilt. Applications on Node.js 20 or older, .NET 6 or .NET 7 will not get a fix; remove them from the internet until they are migrated. At the same time, plan the move from .NET 8 and 9 to .NET 10, because no security updates will be released for them after November 10. Node.js 22 follows on April 30, 2027.<\/p>\n<\/div>\n<div class=\"tk-tablewrap\">\n<table>\n<caption>Fixes and end of support by runtime, as of October 29, 2026. Sources: Node.js security advisory of October 21, 2026, Node.js Release Schedule, Microsoft security advisory of October 25, 2026, .NET releases overview<\/caption>\n<thead>\n<tr>\n<th>Runtime environment<\/th>\n<th>Fixed version<\/th>\n<th>Support ends<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Node.js 26<\/td>\n<td>26.12.1<\/td>\n<td>30.04.2029<\/td>\n<\/tr>\n<tr>\n<td>Node.js 24<\/td>\n<td>24.22.1<\/td>\n<td>30.04.2028<\/td>\n<\/tr>\n<tr>\n<td>Node.js 22<\/td>\n<td>22.23.4<\/td>\n<td>30.04.2027<\/td>\n<\/tr>\n<tr>\n<td>Node.js 20 and earlier<\/td>\n<td>None<\/td>\n<td>Ends on April 30, 2026<\/td>\n<\/tr>\n<tr>\n<td>.NET 10<\/td>\n<td>10.0.14<\/td>\n<td>14.11.2028<\/td>\n<\/tr>\n<tr>\n<td>.NET 8 and .NET 9<\/td>\n<td>8.0.33 and 9.0.22<\/td>\n<td>10.11.2026<\/td>\n<\/tr>\n<tr>\n<td>.NET 6 and .NET 7<\/td>\n<td>None<\/td>\n<td>Ends in 2024<\/td>\n<\/tr>\n<tr>\n<td>.NET Framework 4.x<\/td>\n<td>Not affected<\/td>\n<td>The Windows Lifecycle<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2 id=\"was-ist-passiert\">What is known about Node2Shell<\/h2>\n<p>The vulnerability is located in Google\u2019s Brotli library, versions 1.0.3 through 1.2.0. A malformed data stream causes the decoder to write beyond an internal buffer. Unauthenticated attackers can thus read memory, cause processes to crash, or, in the worst case, execute code. Google rates the vulnerability at a CVSS 4.0 score of 9.2; it has been fixed in Brotli versions 1.0.10, 1.1.1, and 1.2.1 (<a href=\"https:\/\/www.heise.de\/news\/Brotli-Decoder-Luecke-nicht-nur-in-Node-js-sondern-auch-in-Bun-Python-und-mehr-11499975.html\" target=\"_blank\" rel=\"noopener\">heise online<\/a>, 26.10.2026).<\/p>\n<p>On October 21, Node.js released versions 22.23.4, 24.22.1, and 26.12.1 and explicitly notes that versions past their end-of-support date are always affected (<a href=\"https:\/\/nodejs.org\/en\/blog\/vulnerability\/october-2026-security-releases\" target=\"_blank\" rel=\"noopener\">Node.js<\/a>, Oct. 21, 2026). One day later, Imperva demonstrated code execution in the official Node.js 24.22.0 container image with Express 5 (<a href=\"https:\/\/www.imperva.com\/blog\/node2shell-from-brotli-data-to-remote-code-execution\/\" target=\"_blank\" rel=\"noopener\">Imperva<\/a>, Oct. 22, 2026). Microsoft released .NET 8.0.33, 9.0.22, and 10.0.14 on October 25. According to Microsoft, a .NET application is only affected if it decompresses Brotli data from external sources, such as by decompressing incoming requests in ASP.NET Core, via HttpClient, or directly using the Brotli classes (<a href=\"https:\/\/github.com\/dotnet\/runtime\/security\/advisories\/GHSA-p3jp-9v83-76w9\" target=\"_blank\" rel=\"noopener\">Microsoft Security Advisory<\/a>, Oct. 25, 2026). On October 27, CISA added the vulnerability to its list of actively exploited vulnerabilities, without providing any details about the attacks (<a href=\"https:\/\/www.cisa.gov\/news-events\/alerts\/2026\/10\/27\/cisa-adds-two-known-exploited-vulnerabilities-catalog\" target=\"_blank\" rel=\"noopener\">CISA<\/a>, 27.10.2026).<\/p>\n<div class=\"tk-stat\"><strong>88 %<\/strong><\/p>\n<p>According to the EPSS prediction model, this is the probability that exploitation attempts targeting CVE-2026-111497 will be observed in the next 30 days.<\/p>\n<p><cite>FIRST EPSS, October 2026<\/cite><\/div>\n<div class=\"tk-note\"><b>Limitation<\/b>EPSS assesses overall attack activity on the Internet. Whether your application is vulnerable depends on whether it decompresses Brotli data from external sources. According to heise, Nginx and Apache do not do this in their default configurations, but an application running behind them may still do so.<\/div>\n<h2 id=\"ihr-betrieb\">Where the Problem Lies in Your Company<\/h2>\n<p>The vulnerability exists in every copy of the runtime environment. Typical examples in industry and commerce include supplier and freight forwarder portals built on Node.js, interface services between ERP, warehouse management, and shipping systems built on .NET, Python scripts for data transfer, and container images that haven\u2019t been rebuilt in months. In addition, there are Electron-based desktop tools, such as control room clients or configurators from machine manufacturers. On October 28, Electron released versions 43.8.4, 44.10.0, and 45.1.0 with the Node.js fix (<a href=\"https:\/\/releases.electronjs.org\/release\/\" target=\"_blank\" rel=\"noopener\">Electron Releases<\/a>, Oct. 28, 2026). The situation varies among Linux distributions: Debian provides patches, while as of Oct. 28, the New Zealand Cybersecurity Agency had not yet reported any regular packages for Red Hat Enterprise Linux and SUSE (<a href=\"https:\/\/www.ncsc.govt.nz\/alerts\/cve-2026-111497-affecting-brotli-decoder\/\" target=\"_blank\" rel=\"noopener\">NCSC New Zealand<\/a>, 28.10.2026).<\/p>\n<p>A worked example from intralogistics with assumed values: a logistics service provider with three sites runs nine in-house applications. A carrier portal runs on Node.js 20, the scanner backend and a control room dashboard on Node.js 22. Three interface services to the warehouse management system run on .NET 8, one on .NET 6 and two on .NET Framework 4.8. Due immediately are the update and rebuild of the two Node.js 22 applications and the three .NET 8 services, by our assumption half a person-day to one person-day per application, no more than five in total. The portal on Node.js 20 has to go behind a VPN until it is updated to Node.js 24, assumed at 5 to 10 person-days. The .NET 6 service needs 8 to 15 person-days for .NET 10, the three .NET 8 services 5 to 10 each. By April 2027, the two Node.js 22 applications follow with 3 to 6 person-days each. In total, that is 34 to 67 person-days over six months that belong in the 2027 budget.<\/p>\n<h2 id=\"optionen\">What each option takes, what it costs and where the risks lie<\/h2>\n<div class=\"tk-tablewrap\">\n<table>\n<caption>Options for action, torck's own assessment, as of October 29, 2026<\/caption>\n<thead>\n<tr>\n<th>Option<\/th>\n<th>Effort<\/th>\n<th>Costs<\/th>\n<th>Risk<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Update the runtime and rebuild the images<\/td>\n<td>Hours to one day per application<\/td>\n<td>Staff time<\/td>\n<td>Minimal, if the build pipeline is still working<\/td>\n<\/tr>\n<tr>\n<td>Disable Brotli decoding<\/td>\n<td>Hours<\/td>\n<td>Low<\/td>\n<td>This is only a transitional solution; it does not cover every library<\/td>\n<\/tr>\n<tr>\n<td>Restrict access behind a VPN or require login<\/td>\n<td>Hours to days<\/td>\n<td>Low<\/td>\n<td>Partners lose direct access, the vulnerability stays in the network<\/td>\n<\/tr>\n<tr>\n<td>Migration to Node.js 24 or .NET 10<\/td>\n<td>Days to weeks per application<\/td>\n<td>Resources, person-days<\/td>\n<td>Low with automated testing; high without testing<\/td>\n<\/tr>\n<tr>\n<td>Replace the application<\/td>\n<td>Months<\/td>\n<td>High<\/td>\n<td>Data Migration and Parallel Operation<\/td>\n<\/tr>\n<tr>\n<td>Do nothing<\/td>\n<td>None<\/td>\n<td>None for now<\/td>\n<td>A potential breach of the company network via a known, actively exploited vulnerability would be difficult to justify in a NIS2 audit<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>According to Microsoft, standalone .NET programs and NativeAOT applications must be republished.<\/p>\n<h2 id=\"eignung\">Which option suits which application<\/h2>\n<p>Updating and rebuilding is this week's task for everything on supported versions. If you find that an image can no longer be built because the pipeline or credentials are missing, you have found a bigger problem than Node2Shell. Isolating works as a bridge for applications without a fix, with a fixed end date. Migrating pays off for everything that stays in use for more than a year, and it is best done in one go. Moving to .NET 10 and Node.js 24 secures support until 2028. Replacing is the right path for legacy applications without tests and without anyone who still knows the code.<\/p>\n<p>Machine builders who ship Node.js or Electron in their products should also check whether the reporting obligation under the Cyber Resilience Act applies. This is a legal question; this article is not legal advice. The process is described in the article <a href=\"\/en\/cra-reporting-requirement\/\">CRA reporting requirements for machine builders<\/a>.<\/p>\n<div class=\"tk-inline-cta\">\n<p><b>Runtime check in five working days<\/b>You will receive a list of all in-house developments, container images, and tools, including their runtime versions, end-of-support dates, patch status, and whether they decompress Brotli data from external sources. In addition, you\u2019ll receive a software bill of materials for each application, a check to confirm that each image can be rebuilt reproducibly, and a cost estimate for the migration for each application running on .NET 6 through 9 or Node.js 20 and 22. You can then decide which parts your team will migrate in-house and which parts you\u2019ll outsource. Initial consultation: 30 minutes, free of charge, with a response within one business day.<\/p>\n<p><a class=\"tk-btn\" href=\"\/en\/?anfrage=net-8-supportende#contact-us\">Request a runtime check<\/a><\/div>\n<h2 id=\"haeufige-fragen\">Frequently asked questions<\/h2>\n<h3 class=\"tk-faq-item\" id=\"net-framework\">Is .NET Framework 4.8 affected by Node2Shell?<\/h3>\n<p>No. Microsoft explicitly lists .NET Framework as not affected. Affected are .NET 8, 9 and 10 before the October updates and the preview versions of .NET 11, and only if the application decompresses Brotli data from outside.<\/p>\n<h3 class=\"tk-faq-item\" id=\"net-8-ende\">What will happen to .NET 8 after November 10, 2026?<\/h3>\n<p>The applications keep running, but Microsoft no longer ships security updates. The next vulnerability in the runtime then stays open. In our experience, moving to .NET 10, supported until November 2028, is usually a manageable version change if automated tests exist.<\/p>\n<h3 class=\"tk-faq-item\" id=\"container-neustart\">Is it enough to restart the containers?<\/h3>\n<p>No. A restart loads the same image with the same Node.js version. You must rebuild the image based on a corrected base image and deploy it; then check the version in the running container.<\/p>\n<h2 id=\"naechster-schritt\">The next step<\/h2>\n<p>torck develops, operates, and modernizes custom software for industry and commerce, ranging from runtime updates to migration during live operations. You can read about how we work on the page <a href=\"\/en\/custom-software-development\/\">Custom Software Development<\/a>. For legacy applications without tests, we offer our <a href=\"\/en\/legacy-modernization\/\">Legacy Modernization<\/a>. For further reading, see <a href=\"\/en\/php-security-vulnerability\/\">PHP2Shell: Which PHP Systems You Need to Patch Now<\/a>, <a href=\"\/en\/measuring-technical-debt\/\">Measuring Technical Debt<\/a> and <a href=\"\/en\/modernise-legacy-software\/\">Modernize or Replace Legacy Software<\/a>. <a href=\"\/en\/?anfrage=net-8-supportende#contact-us\">Schedule an initial consultation<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Brotli vulnerability Node2Shell has been considered actively exploited since 27 October 2026. Only Node.js 22, 24 and 26 and .NET 8 to 10 have been patched. Support for .NET 8 and .NET 9 also ends on 10 November 2026.<\/p>","protected":false},"author":10,"featured_media":6622,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_mbp_gutenberg_autopost":false,"footnotes":""},"categories":[21],"tags":[],"art":[],"class_list":["post-6619","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-individuelle-softwareentwicklung"],"_links":{"self":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/posts\/6619","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/comments?post=6619"}],"version-history":[{"count":6,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/posts\/6619\/revisions"}],"predecessor-version":[{"id":7072,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/posts\/6619\/revisions\/7072"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/media\/6622"}],"wp:attachment":[{"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/media?parent=6619"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/categories?post=6619"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/tags?post=6619"},{"taxonomy":"art","embeddable":true,"href":"https:\/\/www.torck.io\/en\/wp-json\/wp\/v2\/art?post=6619"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}