Professional Services / 02 Data and AI
AI consulting for manufacturing and retail
torck assesses where AI delivers measurable value and builds the solution through to operation. Where AI pays off, we implement it. If it does not pay off in your case, we tell you that too.

- Step 1AssessmentFixed scope, written recommendation
- Step 2PilotReal data, defined metrics
- Step 3RolloutIntegration instead of isolated solutions
01 / Evidence
AI consulting that goes all the way to operation
AI applications from torck are in live operation at customers.
They include a platform that reads and classifies documents in industry, and a knowledge assistant based on RAG that runs as a proof of concept in the customer's secured cloud. For a mechanical engineering company, torck implemented anomaly detection in machine data. torck only names customers and project details with their approval.
- Intralogistics

- Mechanical Engineering

- Retail property

- IT services

- Mechanical Engineering

- Insurance

- Automotive

Clients of torck. The logos represent the work with torck as a whole, not a specific AI project. We are happy to name further references in the initial call.
For a food industry plant, torck built a capture device and developed an image analysis prototype that counts colonies on sample dishes.
Why torck
No model provider imposed
torck uses language models via APIs, self-hosted open-source models or classic machine learning, depending on the case.
Permissions as in your company
A knowledge assistant only shows what the person asking is allowed to see. torck checks permissions in the user context, for example via Microsoft Entra ID.
Recommendations against AI too
The assessment can also conclude that a script or a process change is cheaper than a model.
02 / Starting points
When AI consulting helps: five starting points
These are the situations in which AI projects at torck begin. For each one, we show what torck does first.
Situation 1
Everyone talks about AI, but nobody can name the use case.
In the assessment we review processes and rate potential applications by benefit, effort, risk and dependencies. You receive a prioritised list.
Situation 2
The data is scattered across legacy systems.
We clarify which sources need to be connected and how the data is historised. If the data foundation is missing, torck helps build it.
Situation 3
The pilot worked in testing but never made it into production.
We plan integration, permissions and monitoring from the start. The pilot runs on real data and metrics defined in advance.
Situation 4
The tool is there, but the team does not use it.
Before the project starts, we clarify who will work with the tool and involve those people. During rollout, torck supports the users.
Situation 5
The data must not leave the company.
In that case torck runs language models on your own hardware. The LLM Finder shows which model size fits which GPU.
In the laboratory of a food industry plant, samples were inspected and counted by hand.
03 / Scope of services
Scope of AI consulting: from assessment to an application in operation
What you have in hand at the end, for each building block with the technologies torck uses for it.

Assessed list of use cases
Potential applications rated by benefit, effort, risk and dependencies, with a recommendation for each case.
Knowledge system based on your documents
RAG knowledge system with source links, chat and monitoring. Answers are based on your documents and systems.
Qdrant, OpenWebUI, MCP, Microsoft Entra ID
Automated processes
AI agents and workflows with OCR, image analysis and human review, with defined permissions and logs.
Model operation to your specifications
Language models via APIs or self-hosted open-source models, bundled via an LLM gateway if you wish. We agree provider, region and logging with you, and switching models later remains possible.
Azure, Kubernetes, Docker
Data foundation for AI
Data platform that connects and historises sources, with reports for the business units.
Microsoft Fabric, OneLake, Lakehouse, Power BI
Computer vision including capture device
Image analysis for inspection and laboratory tasks. If required, torck also builds the capture device, from design to integration.
Industrial camera, dome light, 3D printing, aluminium
We also justify the choice of model and platform to your IT team. The yardstick is what your team can run later.
04 / How we work
How AI consulting works at torck
Four steps, each with an outcome you can review and present internally. You only ever commit up to the next decision point.
Step 0
Initial Consultation
A frank assessment of whether AI can make a difference in your case
You describe your situation and a process that costs you time. Someone from torck's development team that builds AI applications joins the call.
- Duration
- One hour, free of charge
Then you decide
Assessment: yes or no
Step 1
Assessment
Written report from the AI assessment
A four-hour on-site workshop, usually led by torck's management. It brings together the people responsible in your IT team and those who own or carry out the process today, for example from production, quality assurance or the business unit. We then analyse processes, data and systems. The report contains an assessed list of use cases, a recommendation with limits and alternatives, an architecture sketch with a permissions concept, a proposal for the pilot and a rough estimate for operation. We discuss it with you online.
- Duration
- fixed scope, report usually within one week of the workshop
Then you decide
Start, postpone or drop the pilot
Step 2
Pilot
Measured results from the AI pilot
We implement the most promising case with real data and measure it against metrics fixed before the start. The access to your systems the pilot needs is set out beforehand in the assessment report.
- Duration
- planned for a few months, schedule in the proposal from the assessment
Then you decide
Rollout: yes or no
Step 3
Rollout
AI application in operation
Integration into your existing systems, monitoring and user support. torck documents the application.
- Duration
- depends on integration and number of systems
Then you decide
Operation and further development by torck or handover to business units and IT
05 / Engagement and cost range
Cost of AI consulting: what drives the effort
torck does not quote a price in advance. AI projects differ so much that a sound figure is only possible once the use case is known. These factors determine the effort.
What drives the effort
Data
How many sources need to be connected and what condition the data is in.
Type of use case
Whether a pre-trained language model is sufficient or a dedicated model is trained on your data.
Integration and permissions
Which systems the solution is built into and how finely permissions are checked.
Model operation
Usage-based via an API, or on your own hardware with your own operation.
Roll-out to the team
How many users will use the tool and what support they need.
How your quote is put together
- 01First call: you describe your situation and we assess whether an assessment makes sense.
- 02Assessment as a separate fixed-scope order: we give you the cost range after the first call, and it is invoiced once the report has been delivered.
- 03Quote for pilot and rollout based on the report, with scope, metrics and milestones.
How the budget stays predictable
- The entry point has a fixed scope.
- After the assessment and the pilot, you decide again before any further budget is committed.
- Payment schedules with milestones are standard.
Engagement models
| Model | This works if | Agreed in advance |
|---|---|---|
| Fixed-scope assessment | This works ifit is still open which use case pays off | Agreed in advanceScope, workshop date, content of the report |
| Project with defined scope | This works ifpilot or rollout are agreed after the assessment | Agreed in advanceScope, metrics, milestones, acceptance |
| Framework agreement with call-offs | This works iftorck operates and develops the solution further | Agreed in advanceTypes of service, call-off procedure, contacts |
| Team extension billed by effort | This works ifyour team builds itself and wants to add AI experience | Agreed in advanceRoles, number of people, duration. A torck project manager or product owner leads the team |
06 / Evidence
AI consulting with torck: what is proven
AI applications from torck are in operation.
At industrial customers, a platform that reads and classifies documents is in operation. A knowledge assistant based on RAG runs as a proof of concept exclusively in the customer's secured cloud. At another industrial company, an AI agent checks change requests in the PLM system; the first expansion stage has been implemented. For a mechanical engineering company, torck implemented anomaly detection in machine data.
torck only names customers and results with the approval of the company concerned.

Prototype
Computer vision with prototype construction
Image analysis in a food laboratory, with a capture device built in-house
At a food industry plant, a camera evaluates samples in the laboratory. The image analysis detects and counts colonies on sample dishes and passes the result to the laboratory information management system (LIMS).
torck designed and built the capture device itself and developed the software as a prototype.
- Own design made from 3D-printed parts and aluminium
- Industrial camera and dome light, sourced and integrated by torck
- Results passed to the LIMS
- since 2017software for manufacturing and retail
- 100+employees in Maxhütte-Haidhof, Vienna and Rabat
- until 2029the TÜV SÜD audit of torck's own energy management software Jouvoli remains valid
Why torck
Own products with AI
Jouvoli combines monitoring, forecasting, edge and cloud. In torck's own platform Awazira, AI providers are interchangeable.
Recommendations with limits
The written report after the workshop sets out limits and an alternative, even if it advises against a platform.
AI in our own development work
In its own day-to-day development work, the torck team uses coding agents such as Claude Code.
Qualifications in the team
- Microsoft Azure
- iSAQB Certified Professional for Software Architecture (CPSA)
- PRINCE2 (Projects IN Controlled Environments)
- Scrum.org Professional Scrum Facilitation Skills
- SAFe POPM (Product Owner / Product Manager)
These credentials are held by individual specialists as personal accreditations.
07 / For your internal alignment
Four questions before commissioning AI consulting
- Executive management
How do we measure whether AI pays off?
Against metrics fixed before the pilot. The assessment proposes them, and the pilot measures them with real data.
- IT management
Does our data stay in-house?
If you require it, yes. The language model then runs on your hardware or in your cloud tenant, with sign-in via your identity management, for example Microsoft Entra ID. For models accessed via an API, we agree the provider and data centre region with you and document the data flows.
- Procurement
Which contract models are available?
Fixed-scope assessment, project with defined scope, framework agreement with call-offs or team extension billed by effort. Your contracting party is torck's German or Austrian company, with German or English as contract language. On request we sign a non-disclosure agreement before the assessment, and a data processing agreement before any personal data is processed. A commercial register extract, insurance certificate and contract templates are available on request. Procurement is welcome to join the first call.
- Business units and plant management
How much of our team's time will this take?
For the assessment, a four-hour on-site workshop and an online review of the report. In the pilot, specialists from your team provide sample data, label it for image analysis and test the application before it goes live. One person from your team acts as the fixed point of contact.
08 / Comparison
AI consulting with implementation, strategy consulting or an off-the-shelf AI product: a comparison
| Criterion | AI consulting with implementation | Pure strategy consulting | Off-the-shelf AI product |
|---|---|---|---|
| This works if | AI consulting with implementationyour processes, data and systems define the case | Pure strategy consultingyou need a roadmap and will implement it yourself | Off-the-shelf AI productthe case matches the product's range of functions |
| Result | AI consulting with implementationAssessed use cases, pilot with measured results, application in operation | Pure strategy consultingStrategy paper and roadmap | Off-the-shelf AI productLicence with the vendor's range of functions |
| Connection to your systems | AI consulting with implementationPart of the engagement, with permission checks | Pure strategy consultingNot part of the engagement | Off-the-shelf AI productVia the interfaces the product offers |
| Model choice and data storage | AI consulting with implementationCase by case, including on your own hardware | Pure strategy consultingRecommendation; implementation on your side | Off-the-shelf AI productAs specified by the vendor |
| Operation | AI consulting with implementationBy torck or handover to your IT team | Pure strategy consultingOn your side or with another service provider | Off-the-shelf AI productWith the vendor |
| When torck advises against it | AI consulting with implementationWhen an off-the-shelf product covers the case without workarounds | Pure strategy consultingWhen nobody can implement the roadmap | Off-the-shelf AI productWhen data must not leave the company and the product cannot accommodate that |
Our recommendation: if an off-the-shelf product covers your case, use the product. AI consulting with implementation pays off where your data and systems define the case.
Why torck for this decision
Consulting and implementation in the same team
The people who carry out the assessment also build the pilot and rollout. So the recommendation has to work later on.
Recommendations with limits
The written report sets out limits and an alternative, even if it advises against a platform.
09 / FAQ
Frequently asked questions about AI consulting
Ordered by the objections raised before an order, with the cost question first.
What does AI consulting cost?
It depends on the use case, which is why torck does not quote a price in advance. The assessment has a fixed scope, and we give you the cost range after the first call. More in the section Engagement and cost range.
Describe your case to us using the contact form.
Are we tied to one model provider?
No. Depending on the case, torck uses language models via APIs, self-hosted open-source models or classic machine learning, and justifies the choice to your IT team. In torck's own platform Awazira, AI providers are interchangeable as well.
Can the data stay in-house?
Yes. In that case torck runs the language model on your own hardware or in your own cloud environment. Which model size, quantisation and context length fit a particular GPU is shown by the LLM Finder with VRAM calculator. More on operation in the guide On-premises LLMs for sensitive data.
What about data protection and the AI Act?
The AI Act (Regulation (EU) 2024/1689) classifies AI systems by risk and sets out obligations for providers and deployers. The GDPR (Regulation (EU) 2016/679) governs the handling of personal data. torck documents the data flows so that requirements remain technically feasible, and concludes data processing agreements under Art. 28 GDPR. On the timeline: EU AI Act: roadmap for companies.
This section refers to laws and regulations in order to put technical decisions into context. It is not legal advice. Please check with your legal department or a law firm whether and how a regulation applies to your company.
What if AI does not pay off for us?
Then we tell you. Even then, the assessment ends with a documented evaluation of your processes. It often reveals cheaper routes, such as automation without AI or a process change.
Do we need our own data?
For forecasts and anomaly detection, yes, because quality depends on this data. torck uses anomaly detection in its own product Jouvoli for energy and sensor data and has implemented it in machine data for a mechanical engineering company. For applications based on pre-trained language models, such as document processing or assistant tools, existing documents are often enough. We clarify what is available and what is missing in the assessment.
How do we bring employees on board?
Before the project starts, we clarify who will work with the tool and involve those people in the pilot and the metrics. During rollout, torck supports the users. Rules for roles and approvals are described in the guide AI governance in companies.
How long does it take to get the first measurable result?
It depends on the data, which is why we do not commit to a fixed deadline in advance. The written assessment report is usually available within one week of the workshop. torck plans the pilot for a few months. We only give a schedule for the rollout after the pilot.
Who owns the application, prompts and data after the project?
The same rule applies to AI applications as to software. After acceptance you receive the source code, prompts, configuration and documentation, with the exclusive right to use and develop them further once the work has been paid for. Your data remains your data, and torck returns it when the contract ends.
You use language models from providers under their licence terms. Who receives the rights to a specifically trained model is set out in the quote.
10 / Contact
Enquire about AI consulting: let's talk about your case
Bring a process that costs you time. We will tell you openly whether AI can make a difference there.
- First call: one hour, free of charge
- With the development team that builds AI applications at torck
- Services for businesses only
How torck processes your details is explained in the privacy policy.
11 / Further reading
Guides on AI consulting
Sorted by where you are in your decision.
01
Understanding
02
Calculating
03
Safeguarding
04
Operating