An open-source LLM comparison is worthwhile for any company that wants to run a language model on its own rather than being locked into a single cloud API. Three model families regularly come up in this context: Mistral, Llama, and Qwen. They differ less in their fundamental capabilities than in their licensing terms, language coverage, and hardware requirements.
Qwen3.8-27B is the latest medium-sized Qwen model: 27 billion parameters, Apache 2.0 license, context window of 262,000 tokens. Llama 3.3, with 70 billion parameters, remains Meta’s go-to large model for on-premises deployment by companies in the EU, as EU companies are excluded from the usage rights for the multimodal Llama-4 models. Mistral Small 3.2, with 24 billion parameters, is licensed under Apache 2.0 and fits on a graphics card with 24 GB of memory when using 4-bit quantization. The choice of open-source LLM determines hardware requirements, licensing terms, and maintenance efforts all at once.
| Model | Parameters | License | Strength | Hardware Requirements |
|---|---|---|---|---|
| Qwen3.8-27B | 27 billion | Apache 2.0 | Programming tasks, context window of 262,000 tokens, Qwen3 generation with 119 languages and dialects | Mean, 4-bit weights, approximately 17 GB |
| Llama 3.3 | 70 billion | Llama 3.3 Community License | Context window of 128,000 tokens, available for use by EU companies without restriction | High, 4-bit weights over 40 GB |
| Mistral Small 3.2 | 24 billion | Apache 2.0 | High quality with minimal resource consumption | 4-bit weights are about 14 GB; with context, a 24-GB card |
Performance in an Open-Source LLM Comparison: What Manufacturer Specifications Reveal
According to the manufacturer, the Qwen3.8-27B achieves this score in the LiveCodeBench v6 benchmark for programming tasks. This is a manufacturer's specification, not an independent comparison test.
Qwen, Model Card Qwen3.8-27B, 08/2026
For companies looking to implement a code-assistance model, this serves as a point of reference but not a direct comparison: Manufacturers publish their results using different benchmarks and test setups (Qwen, Model Card, 08/2026). The Qwen3 generation also supports 119 languages and dialects, which is an advantage for companies with international locations (Qwen, 04/2025).
Llama 3.3 and Mistral: Licensing and Hardware Requirements Play a Key Role
Llama 3.3, in its 70-billion-parameter version, offers a context window of 128,000 tokens and is licensed under the Llama 3.3 Community License (Meta, Llama 3.3 Model Card, 12/2024). There is no license fee. Only companies that had more than 700 million monthly active users at the time of publication need their own license from Meta. For most companies, therefore, the licensing requirements are not an issue in practice. Nevertheless, it’s worth reading the fine print before using a model in a commercial product.
For Llama 4 (Scout and Maverick, 04/2025), there is a restriction in Europe: Meta does not grant usage rights for the multimodal Llama 4 models to companies headquartered in the EU. The only exceptions are end users of a product that contains such a model (Meta, Llama 4 Acceptable Use Policy). EU companies that want to self-host a Meta model therefore stay with Llama 3.3 or use Meta’s newer Muse Glimmer 30B, released under Apache 2.0 in 08/2026 (Meta, Model Card).
Mistral Small 3.2, with 24 billion parameters, is licensed under the Apache 2.0 License, one of the most permissive open-source licenses available. With 4-bit quantization, the model weights are approximately 14 GB. Including context and reserve, the LLM Finder estimates that 8,192 tokens require 15.6 to 18.1 GiB of graphics memory. This fits on a 24-GB card like the RTX 4090, but not on a 16-GB card. According to Mistral, even the previous version, Small 3, is competitive with Llama 3.3 70B (Mistral, 01/2025, provider's specification). For companies with a limited hardware budget, this is a reason not to choose a model by parameter count alone. Since March 2026, Mistral has also offered Mistral Small 4, a mixture-of-experts model with 119 billion parameters, 6 billion of which are active per token, also licensed under Apache 2.0 and with a 256,000-token context window (Mistral, 03/2026).
Since October 2026, Aleph Alpha’s Kolibri has also made a German model available under the Apache 2.0 license: 78 billion parameters, of which about 3.5 billion are active per token, trained on German and English. It requires about 78 GB of graphics memory and therefore a server rather than a workstation (Aleph Alpha, Model Card, 10/2026). For a business perspective, see our article Kolibri by Aleph Alpha.
A common mistake when initially selecting a model is the assumption that more parameters automatically lead to better results. For many business applications (such as summarization, classification, or simple text modules) a smaller, more cost-effective model provides sufficiently good results. The largest available model is particularly worthwhile when complex relationships across multiple documents need to be understood.
What the Open-Source LLM Comparison Means for Choosing Your Own Model
If you're looking for a model primarily for programming tasks or multilingual applications, you should consider the latest Qwen models. Those who prioritize a particularly straightforward license and low hardware requirements are often better served by Mistral Small. For EU companies, Llama 3.3 is Meta’s large model with no licensing restrictions. However, with 128,000 tokens, its context window is currently on the lower end; Qwen and Mistral offer 256,000 tokens and more. None of these options is the right choice in every situation.
A good approach, therefore, is to first describe your own use case in detail, including the most important sample tasks and the expected language, and then compare several models using the same test cases. If, instead, you choose a model simply because it’s in the headlines, you’re making a decision that has no bearing on your own requirements.
The hardware requirements for each model size directly determine which configuration makes the most economic sense. We've provided details on graphics processors and total costs over the lifespan of the equipment in the article Private AI Models in the Workplace .
Which of these models fit an existing graphics card depends on quantisation and context length. That calculation is handled by the LLM Finder with VRAM calculator for the card in question.
For programming tasks, what matters is whether generated changes work in your own repository. To test models against your own tasks and existing tests, see Select a local coding LLM.
How Often It Makes Sense to Switch Models
A comparison of open-source LLMs quickly becomes outdated, as a model that’s currently leading the pack can be surpassed by a new version within just a few months. However, that’s no reason to switch with every new version. It’s worth switching if the new version measurably improves a specific use case or if licensing or support issues with the current model become a problem. If you switch more than once a year, you’ll spend more time on migration than on productive use.
Compare models using your own test casesWe give the same sample problems from your company to several models and compare their answers side by side. Initial consultation: 30 minutes, free of charge, response within one business day.
Frequently Asked Questions
What exactly does "open source" mean in the context of language models?
The licenses differ significantly. Apache 2.0, as used for Mistral Small, allows for virtually unrestricted commercial use. The Llama 3.3 Community License includes conditions, such as a requirement for providers with more than 700 million monthly active users to create their own license. With Llama 4, Meta excludes companies based in the EU from rights to the multimodal models. Before putting these models into production, it’s worth reading the respective license terms carefully.
Which model is best suited for German-language applications?
The Qwen3 generation supports 119 languages and dialects, including German. For applications specific to the German language, however, it’s still worth conducting your own test, since benchmark values are usually based on English and Chinese and cannot be applied directly. Technical terms from industry and commerce, such as those found in customs documents or technical standards, are best tested using your own example sentences.
How often should a company change the model it uses?
It’s worth switching if there’s a clear improvement in performance for your specific use case or if you’re experiencing issues with your existing license, but not automatically with every new version. An annual review cycle is a sensible starting point for most companies. It’s important to treat the switch as a small project in its own right, including a test of response quality before the migration.
The Next Step
torck deploys open-source LLMs such as Mistral, Llama, and Qwen in production for clients in industry and retail, testing them beforehand with real queries from the respective businesses. Our development teams in Maxhütte-Haidhof, Vienna, and Rabat handle the selection, setup, and subsequent operation, all under one roof. During the initial consultation, we determine which model is best suited for your use case. The page describes how to operate language models in-house Local AI and On-Premises LLMs. Schedule an Initial Consultation.