Professional Services / 03 Industrial IoT

Plant Monitoring and Industrial IoT

Asset monitoring continuously captures the condition and data of machines and plants and makes them visible in dashboards and alerts. torck builds the software for this, from sensor retrofit via OPC UA and MQTT to the connection to ERP and process control systems.

Sensor with a cable on the housing of an electric motor
  1. Step 1PilotFew assets, cost range based on complexity
  2. Step 2RolloutIntegration instead of isolated solutions
  3. Step 3OperationA system, not a project

01 / torck in figures

Asset monitoring from a software company with its own industrial product

  • since 2017torck has developed software for manufacturing and retail.
  • 3 locationsMaxhütte-Haidhof, Vienna and Rabat; your contracting party is torck's German or Austrian company.
  • TÜV SÜDhas audited torck's energy management software Jouvoli. The certificate is valid until July 2029.

Why torck

  • Experience with a range of assets

    torck has captured and analysed data from milling centres, filling lines, solar and wind farms and automated large-scale warehouses.

  • Cloud or on-premises

    The solution runs in the cloud, on premises or hybrid, depending on your requirements for data sovereignty and IT operations.

  • Vendor-neutral: torck does not sell hardware

    torck selects sensors and components to suit your assets. There is no in-house hardware range.

Clients of torck. The logos represent the work with torck as a whole.

02 / Starting points

When asset monitoring pays off: five starting points

These are the situations in which monitoring projects at torck begin. For each one, we show what torck does first.

  • Situation 1

    Older machines have no interface and remain a black box.

    torck retrofits sensors that capture states from the outside, without touching the control system wherever possible. They are connected via LoRaWAN or Modbus.

  • Situation 2

    Every line has its own system, and there is no overall picture.

    We bring the data together in one platform and connect ERP, MES or process control systems via open APIs.

  • Situation 3

    Maintenance follows the calendar, yet failures still come as a surprise.

    Condition monitoring comes first and shows the condition via limit values, trends and alerts. Predictive maintenance follows where it pays off.

  • Situation 4

    Production energy consumption is only known as a total on the bill.

    For energy management and consumption monitoring, torck uses its own product Jouvoli.

  • Situation 5

    Knowledge of control systems and data flows lies with a few people.

    torck coordinates between control engineering specialists and production plants for a limited period, secures production know-how and ensures the data flow.

03 / Scope of services

Does asset monitoring fit your machines, and does the data stay with you?

Yes, if the connection is planned for each asset. torck works vendor-neutrally with open standards: OPC UA for controllers, MQTT and REST for transport, LoRaWAN and Modbus for retrofitted sensors. torck does not sell hardware. Who orders sensors and edge devices and how a faulty device is replaced is set out in the pilot quote.

The data belongs to you, and the architecture is documented. In a handover you receive the data in open formats such as CSV or JSON, or as a database dump. You can continue to run the system yourself or hand it over to another service provider.

torck has connected milling centres, filling lines, solar and wind farms with various data loggers, and automated large-scale warehouses, among others.

What torck builds for this

  • Retrofit for existing machines

    Retrofitted sensors capture temperature, vibration, flow, energy consumption, current draw or operating states, connected via LoRaWAN or Modbus. If no suitable device exists for a measurement task, torck designs one for your project, right through to integration.

  • Connecting modern controllers

    Controllers with an interface deliver their data directly to the platform via OPC UA.

  • Data platform

    Transport via MQTT and REST, data flows with Node-RED, storage in a time-series database, with an edge device at the asset if you wish.

  • Condition monitoring with dashboards and alerts

    Condition, trends and limit values for each asset, with alerts to the people responsible.

  • Integration into your systems

    ERP, MES or process control systems via the existing interfaces and open APIs.

  • Operation

    In the cloud (Azure IoT Hub, AWS), on premises or hybrid, with updates, security patches and further development as assets are added. Who installs which updates is agreed before the start. torck only installs updates on edge devices of production-critical assets with your approval.

04 / How we work

How an asset monitoring project works at torck

Four steps, each with an outcome and a decision. You only ever commit up to the next decision point.

  1. Step 0

    First call

    You describe assets, data and goal. The people who will later build the connection and platform join the call.

    Duration
    One hour, free of charge
    Result
    An assessment of what a pilot can achieve and where its limits are

    Then you decide

    Pilot: yes or no

  2. Step 1

    Pilot

    One or a few assets: sensors, data connection, first dashboard with alerts. We agree the cost range with you based on complexity. We plan installation and commissioning with your plant during maintenance windows or shutdowns. On your side, the pilot needs a technical contact person and access to the assets or their data.

    Duration
    a few weeks to a few months, depending on access to the assets and sensor delivery times
    Result
    Real data, a running system and a reliable cost basis for the rollout

    Then you decide

    Rollout: yes or no, and to what extent

  3. Step 2

    Rollout

    Further assets and sites, connection to ERP and process control systems via open APIs.

    Duration
    depends on the number of assets and sites
    Result
    One integrated solution instead of isolated islands

    Then you decide

    Operation by torck or by your team

  4. Step 3

    Operation

    Hosting or on-premises operation, updates and security patches, further development as assets are added.

    Duration
    ongoing
    Result
    A system in operation with documented architecture

    Then you decide

    Continue with torck or hand over to your team or another service provider

05 / Engagement and cost range

Cost of asset monitoring: what drives the effort

torck does not quote a price in advance. Assets, sensors and system landscapes differ so much that a sound figure is only possible once the use case is known. These factors determine the effort.

What drives the effort

  • Number of assets and sites

    How many machines need to be connected and whether they are at one or several sites.

  • Sensors

    Whether controllers supply data or sensors need to be retrofitted, and which variables need to be measured.

  • Depth of integration

    Whether the data only appears in the dashboard or flows to ERP, MES and process control systems.

  • Access to the assets

    When installation on the machine is possible without disrupting production.

  • Operating model

    Cloud, on premises or hybrid, and whether torck takes over operation.

How your quote is put together

  1. First call: you describe assets, data and goal, and we assess what a pilot can achieve.
  2. Quote for the pilot on one or a few assets. Scope and cost range depend on complexity.
  3. After the pilot: quote for the rollout based on real data.

How the budget stays predictable

  • We agree the cost range of the pilot with you based on complexity before it starts.
  • The rollout is only costed after the pilot, on a reliable cost basis.
  • After each phase you decide again.

Engagement models

Three models, contract language German or English
ModelThis works ifAgreed in advance
Pilot with a cost range based on complexity
This works ifyou want to test the benefit on a few assetsAgreed in advanceAssets, metrics, dashboard, cost range
Rollout with defined scope
This works ifthe pilot has proven itself and the scope is fixedAgreed in advanceAssets, sites, interfaces, milestones
Framework agreement for operation and further development
This works iftorck operates the system and assets are addedAgreed in advanceTypes of service, call-off procedure, contacts

06 / Evidence

Has torck already monitored assets and integrated machine data?

Success story

Yes. For a production site with complex material flows, torck implemented a digital twin.

A model from Siemens Plant Simulation became a live real-time solution with a web dashboard, data flows via MQTT and containerised operation. torck does not name the client.

With Jouvoli, torck develops and operates its own energy management software, audited by TÜV SÜD, which supports an energy management system in line with ISO 50001. torck hosts it itself; on request it runs in the customer's data centre. Jouvoli can also control equipment. Via an on-site gateway, the software switches devices and sets target values, for example to enable a charging point or limit the charging current.

We are happy to name further references in the initial call.

Rendering of the capture device from the design data: industrial camera above a dome light, frame made of aluminium profiles and printed parts, illuminated sample window in the base.

Prototype

Practical example

Capture device for a food laboratory, designed by torck

At a food industry plant, a camera evaluates samples in the laboratory using image analysis and counts colonies on sample dishes. The result goes into the laboratory information management system (LIMS).

torck designed and built the device itself: frame made of 3D-printed parts and aluminium, with an industrial camera and dome light sourced and integrated by torck. The software is a prototype. If no suitable device exists for a measurement task, torck builds one, from design to integration.

Why torck

  • Own edge devices and back ends

    torck has developed its own edge devices for machine data and cloud back ends that evaluate sensor data against a rule set in real time, in each case for the customer's project.

  • Limits are stated

    Where a limit-value alert is enough, torck says so and does not build an ML model.

07 / For your internal alignment

Four questions before commissioning asset monitoring

  • Plant management

    Will installing the sensors disrupt our production?

    The sensors are retrofitted from the outside, without touching the machine control system. Your plant decides when installation and commissioning take place, for example during a maintenance window or a planned shutdown. Every change to an asset needs approval from the people responsible and a way back to the previous state. Where coordination between control engineering specialists and production plants is missing, torck takes it on for a limited period.

  • IT management

    Does the data stay with us, and who has access to it?

    Yes, the data belongs to you. Controllers connect via OPC UA, data via MQTT and REST, with operation in the cloud, on premises or hybrid. We plan the network connection with your IT team and the people responsible for control systems, with secured network boundaries and remote access only with your approval. torck only sets up access to personal data from Rabat once standard contractual clauses and a transfer impact assessment are in place, and your order can exclude such access entirely.

  • Procurement

    Who do we sign the contract with, and what is agreed in advance?

    Your contracting party is torck's German or Austrian company, with German or English as contract language. Before the project starts, torck signs a non-disclosure agreement and, where personal data is involved, a data processing agreement under Art. 28 GDPR. The first quote covers the pilot, with a cost range based on complexity. A commercial register extract, insurance certificate and contract templates are available on request. Procurement is welcome to join the first call.

  • Executive management

    Do we need a custom solution, or is a product enough?

    If a standard product connects your machines without workarounds, it is enough. torck tells you so in the first call.

08 / Comparison

When a monitoring product is enough and when integration pays off

When a standard product is the better choice

If a product supports your machines and you mainly need metrics and alerts in a dashboard, the product is usually quicker to introduce than an integration project. torck tells you so in the first call.

Custom integration pays off where older machines without interfaces, several manufacturers and in-house systems come together.

Vendor-neutral integration by torck and SaaS monitoring products compared
CriterionIntegration by torckMonitoring product as SaaS
Machines without an interfaceIntegration by torckYesRetrofit sensors, connected via LoRaWAN or ModbusMonitoring product as SaaSPartiallyDepending on the product, via the vendor's hardware. Check in advance.
Connection to ERP, MES, process control systemIntegration by torckYesVia the existing interfacesMonitoring product as SaaSPartiallyVia the product's connectors and APIs
Data storage and operationIntegration by torckCloud, on premises or hybridMonitoring product as SaaSIn the vendor's environment
Time to first dataIntegration by torckAfter the pilot, depending on access and sensorsMonitoring product as SaaSOften shorter for supported machines
Lock-inIntegration by torckOpen standards, documented architectureMonitoring product as SaaSDepends on contract and export functions

Our recommendation: first check whether a product connects your machines without workarounds. If not, start with a pilot on the most difficult assets.

Which of your assets are suitable is something we clarify in the first call.

Why torck for this decision

  • Not tied to any product

    Because torck is not tied to any product, we also tell you when a standard product is enough.

  • Existing machines are the norm

    Retrofit sensors, LoRaWAN, Modbus and OPC UA are part of our scope. A machine's age is rarely the real problem.

  • Condition first, then prediction

    torck only builds predictive maintenance where it pays off.

09 / FAQ

Frequently asked questions about asset monitoring

Ordered by the objections raised before an order.

Does this also work with old machines without an interface?

Yes. That is what retrofit is for: retrofitted sensors capture temperature, vibration, current draw and operating states from the outside of the machine. Depending on the site, the connection runs via LoRaWAN or Modbus. That is why a machine's age is rarely the real problem.

What should we prepare for the first call?

A short description is enough: which assets, which data, which goal. A list of the machines with manufacturer and controller is helpful if you have one.

Does the system interfere with our control system or the safety of the plant?

Retrofit sensors measure from the outside, without touching the control system. torck reads data from controllers via existing interfaces such as OPC UA. torck only sets up write access to a controller if you explicitly commission it, and only after approval by the people responsible for your control systems. Safety functions remain with your safety engineering.

torck's own product Jouvoli can also control equipment: via an on-site gateway it sends schedules to your plant's controller, switches devices and sets target values. We agree with you before the start which devices Jouvoli controls.

We plan the connection to your networks with your IT team and the people responsible for control systems before any device is installed. The benchmark is secured boundaries between the production network and other networks, connections established from within your network, and remote access only with your approval. Who handles updates and security patches for edge devices, servers and application is agreed in writing before the start. Patterns for this are described in the guide Connecting OT and IT.

What does a retrofit or monitoring project cost?

It depends on the number of assets, sensors and depth of integration, which is why torck does not quote a price in advance. The entry point is a pilot with a cost range based on complexity; more on this in the section Engagement and cost range. Describe your assets to us using the contact form.

Are we tied to torck afterwards?

No. torck relies on open standards and formats. Source code, documentation and CI/CD pipeline pass to you, so that your IT team or another service provider can continue the system.

How long does a pilot project take?

A pilot with a few assets, sensors, data connection and a first dashboard with alerts takes a few weeks to a few months. The exact duration depends on access to the assets and sensor delivery times. For energy data with Jouvoli, torck plans set-up and data connection for the first two weeks. You receive a schedule after the first call.

Which protocols and interfaces does torck support?

At field level LoRaWAN and Modbus, for controllers OPC UA, for data transport MQTT and REST. We implement data flows with Node-RED, among others, and in the cloud also with Azure IoT Hub. torck has deployed edge devices in control cabinets on beverage filling lines, in solar and wind farms and in automated large-scale warehouses. We connect ERP, MES and process control systems via the existing interfaces. If a protocol is missing from the list, ask us.

Cloud or on premises?

Both, and hybrid too. The choice depends on your requirements for data sovereignty, IT operations and connectivity. If torck operates the platform, we agree a data centre location in the EU before the contract is signed. torck builds with technologies that run in both environments and does not impose a platform.

Do we need predictive maintenance?

Not always. Condition monitoring first shows how your assets are doing. Predictive maintenance pays off where unplanned downtime is expensive and enough data is available. Where a limit-value alert is enough, we say so. More in the guide Predictive maintenance: what it can and cannot do.

10 / Contact

Enquire about asset monitoring: let's talk about your assets

Describe your use case: which assets, which data, which goal. You get an assessment of what a pilot can achieve and where its limits are.

  • First call: one hour, free of charge
  • With the people who will later build the connection and platform
  • Services for businesses only

How torck processes your details is explained in the privacy policy.