Who Energy monitoring in production Anyone planning this usually has a figure in mind. The International Energy Agency and Fraunhofer ISI estimate the realizable potential at 5 to 25 percent of energy consumption, depending on the industry and initial conditions. Anyone who interprets this range as a guarantee will be disappointed, because a meter alone does not save a single kilowatt-hour.
This is the heart of the matter. Transparency shows where energy is being wasted. Whether this turns into savings is decided only by the action that follows, whether it’s repairing a leak, changing how a system is switched, or investing in more efficient technology.
Energy monitoring in production uses load profile measurement and the assignment of consumption to specific machines and jobs to identify where energy is being wasted, such as in Compressed Air Systems, during partial load operation or nighttime idle operation. The International Energy Agency and Fraunhofer ISI estimate the economically viable savings potential in production at 5 to 25 percent, depending on the industry. Only those savings that are subsequently implemented as concrete measures will be realized.
Energy monitoring in production: what measurement reveals
Energy monitoring tracks consumption at the point of use and separates it from the electricity bill alone. Load profile measurement reveals when specific loads are active, information that is lost in the simple monthly total. That alone provides starting points, since many load peaks result purely from simultaneous usage.
Of greater practical interest is the allocation of consumption to individual machines and, where possible, to individual orders. Only then can you determine whether a particular component consumes an above-average amount of energy because of the lot size, the machine or a poorly adjusted process. Methodologically, this allocation resembles the allocation of machine data to availability and performance used for overall equipment effectiveness. Without it, any discussion of savings remains guesswork.
Partial load, idle, and the base load at night
The most uncomfortable finding from an initial monitoring is usually the base load outside production hours. This includes compressors that keep running at weekends, ventilation systems on standby and machines that are not actually switched off overnight but simply not producing. This idle consumption goes unnoticed in the annual bill, but it shows up in the load profile.
Partial load is the second major area of interest. Many drives operate unregulated at a fixed speed, regardless of whether full power is currently needed. This effect can be measured as soon as a system displays energy consumption over time rather than just as a total. What happens next, whether technical retrofitting or a change in shift logic, is a second decision that monitoring prepares the ground for but does not make itself.
Compressed Air: A Time-Tested Method for Saving Energy
Few topics in energy consulting are as well documented as compressed air. Compressed air applications account for about 7 percent of industrial electricity consumption in Germany; according to the dena often reduce it by up to 50 percent.
The cause is almost always leaks. They remain invisible until a measurement detects them, and they cost money around the clock, even when no machines are running. A Study by Fraunhofer ISI A study of compressed air systems at several companies identified potential savings of between 21 and 66 percent, with payback periods ranging from two to four years. The quickest results almost always came from leak repair, not from new compressors.
The Legal Framework: the Energy Efficiency Act and ISO 50001
The Energy Efficiency Act Since November 2023, companies with an average total final energy consumption of more than 7.5 gigawatt-hours per year have been required to implement an energy management system in accordance with DIN EN ISO 50001 or an environmental management system in accordance with EMAS. Companies that had already exceeded this threshold before the regulation took effect were required to have the system in place by July 18, 2025.
For annual energy consumption at or above this level, the Energy Efficiency Act requires a certified energy management system in accordance with ISO 50001 or EMAS.
BAFA Fact Sheet on the EnEfG, 02/2025
From 2.5 gigawatt-hours, a second requirement applies: companies must publish an implementation plan within three years that includes economically feasible energy-saving measures identified through energy audits or management systems. Although there is no legal obligation to actually implement these measures, in practice it is hard to avoid, because without implementation both eligibility for many funding programmes and the purpose of the whole exercise are lost. Both thresholds are expected to change in 2026. A cabinet draft proposes 23.6 gigawatt-hours, but the amendment has not yet been promulgated.
| Annual consumption | Requirement |
|---|---|
| 2.5 GWh or more | Publish implementation plans for cost-saving measures; annual waste heat report |
| 7.5 GWh or more | Implement an energy or environmental management system in accordance with ISO 50001 or EMAS |
From Transparency to Action
This is exactly where the simple calculation ends, according to which Energy monitoring in production does not automatically mean savings. A dashboard does not reduce kilowatt-hours. It shows a deviation, a peak, or a base load that is higher than expected. Savings only occur when someone reviews this information, identifies the cause, and makes a change, whether technical or organizational. International comparative data supports this view: According to analyses by the International Energy Agency An average savings of 11 percent in the first three years after implementation, with outliers of 30 percent or more if the system is actually used to make decisions.
That is why energy monitoring in production pays off above all in organisations that are willing to act on their data. Anyone who measures but changes nothing ends up with extra costs for sensors and software and has not saved a single euro. Anyone already collecting machine data for other purposes, for example because the EU Data Act: New Access Rights creates, or because NIS2: A Complete Asset Inventory If required, the same data link can be used for energy monitoring as well, rather than setting up yet another standalone solution.
The frequently cited savings ranges of 5 to 25 percent are based on company surveys and international comparative studies, not on a binding standard, and the actual figure for a specific company may be higher or lower. In energy-intensive processes that are already highly efficient, such as modern melting furnaces, the remaining potential is often smaller than in less optimised auxiliary systems. Monitoring without someone who regularly reviews the data comes to nothing, regardless of the quality of the sensors.
From Measurement to Initial Action
Metered data alone does not save energy. Whether load profile measurements at your facility can be translated into concrete actions depends on your existing plant infrastructure. Initial consultation: 30 minutes, free of charge, response within one business day.
Frequently asked questions
How quickly does energy monitoring pay for itself in production?
That depends heavily on the initial situation. Pure software solutions based on existing meters often pay for themselves within a few months, as soon as the first leak or faulty connection is fixed. If additional measurement technology is required, the payback period is extended, but in the documented compressed air examples, it usually remains in the range of two to four years. Those who tackle the most cost-effective areas first, such as compressed air and nighttime base load, generally see results more quickly than when investing in completely new plant equipment.
At what size does energy monitoring become worthwhile?
There is no fixed lower limit. Under the Energy Efficiency Act, an energy management system is only required by law for annual consumption of 7.5 gigawatt-hours or more. From an economic standpoint, simple monitoring is often worthwhile well below that threshold because the costs of measurement technology and software have fallen, while energy prices have risen. More important than the size of the facility is usually whether anyone at the facility actually has the time to review the data regularly and take appropriate action based on it.
Is energy monitoring sufficient to meet the requirements of the Energy Efficiency Act?
No, not on its own. Monitoring provides the data foundation for energy audits and for a certified energy management system under ISO 50001, but it does not replace either the certification or the required economic feasibility assessment of the identified measures. It is a prerequisite for robust implementation, not the fulfillment of the obligation itself. Anyone seeking certification also needs an auditor or environmental verifier to independently confirm the results before they are submitted to the Federal Office for Economic Affairs and Export Control.
torck builds data pathways from individual machines all the way to the dashboard, integrating both existing meters and new sensors into a unified analysis. Because our development teams in Maxhütte-Haidhof, Vienna, and Rabat operate with a time difference of no more than two hours, and a single contract with the German company torck GmbH, governed by German law, covers the entire scope of services, load profile data and order allocation result in concrete analyses rather than yet another project site. The best way to determine how energy monitoring can be specifically implemented for your production is through a direct conversation about Plant Monitoring.
This article discusses legislation and regulations as context for technical decisions. It does not constitute legal advice. Consult your legal team or external counsel about whether and how a particular rule applies to your organisation.