Which local LLMs to consider for coding
As of the data snapshot of , the memory of Planning profile CUDA · 48 GiB is sufficient by calculation for 126 of 1,092 catalogued configurations, 0 of them tight. Assumptions: 32,768 context tokens, concurrent requests 1, reserve 10%. 43.2 GiB remain usable. For 757 configurations a complete memory value is still missing.
The first test candidate is Devstral-Small-2-24B-Instruct-2512 in Q4_K_M with llama.cpp. This configuration needs up to 22.0 GiB, there is no speed estimate for this device. Runtime status llama.cpp: Build b10964 from Sep 14, 2026 (release notes). Suitability: no independent data. Memory and speed are calculated, not measured. Only a test with your own questions shows whether a model suits your task.
Your requirements
400 computable models · 1,092 configurations · 93 hardware options · Data snapshotResults 1092
20 of 1,092 results, page 1 of 55.
Calculated memory requirement: Fits the memory estimate: 126 · At the memory limit: 3 · Memory requirement incomplete: 757 · Needs more memory: 206 · Data snapshot
What the symbols mean
- clear: Memory is sufficient by calculation, or the figure beside it is measured.
- with a caveat: Tight, at the memory limit, or only with CPU offload. The sentence beside it names the case.
- not possible: Memory is missing, or runtime and hardware do not fit together.
- open: A value is missing from the data snapshot, so it cannot be calculated.
- estimated: Calculated, not measured.
- measured: Measured, source and origin are stated in the details.
Models for an initial test
Guide value for this task: 10 tokens per second. That is an assumption by torck, no sourced threshold exists for it.
First test candidate
Devstral-Small-2-24B-Instruct-2512
Repository created on Nov 28, 2025 huggingface.co / Devstral-Small-2-24B-Instruct-2512
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Fits into memory with headroom. Speed not estimated. The rank follows the size where it is sufficient, then recency and evidence. Test the suitability with 20 tasks from your own code and run your tests on the result.
Memory fit
- Required per device
- 19.3 to 22.0 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Devstral-Small-2-24B-Instruct-2512 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 24.0 billion parameters, 262,144 tokens of context length and the creation date Nov 28, 2025. These figures bound the fit, they do not prove it.
Open the model card of Devstral-Small-2-24B-Instruct-2512 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Next place in the ranking
Magistral-Small-2509
Repository created on Sep 12, 2025 huggingface.co / Magistral-Small-2509
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Comes directly after the first test candidate in the ranking. The place says nothing about answer quality.
Memory fit
- Required per device
- 19.3 to 22.0 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Magistral-Small-2509 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 24.0 billion parameters, 131,072 tokens of context length and the creation date Sep 12, 2025. These figures bound the fit, they do not prove it.
Open the model card of Magistral-Small-2509 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Next place in the ranking
Mistral-Small-3.2-24B-Instruct-2506
Repository created on Jun 19, 2025 huggingface.co / Mistral-Small-3.2-24B-Instruct-2506
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: vendor data only
Comes directly after the first test candidate in the ranking. The place says nothing about answer quality.
Memory fit
- Required per device
- 19.3 to 22.0 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
Vendor claimHumanEval Plus: 92.9%
Figure for the model variant. No measurement is available for this quantization.Vendor-reported HumanEval Plus with up to five attempts (Pass@5). Not comparable to a single-attempt result.Hugging Face Hub · Jun 20, 2025Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
The whole list follows one ranking. Configurations with verified data come first. Then it counts whether the estimated minimum speed at the selected context reaches the guide value for your task. After that the larger size class wins, within one size class the model whose repository was created later, then the higher parameter count, finally memory headroom and verified runtime data. The order says nothing about answer quality.
Decision brief and test plan
Decision brief and test plan
Data snapshot: Sep 19, 2026
Context: 32,768 tokens. Concurrent requests: 1. Reserve: 10%.
This selection provides candidates for a practical test. Memory and speed are estimates. Ranking does not establish task quality or production readiness.
- Start with
- I have a use case
- Task
- Coding
- Application language
- Any
- Number of identical devices
- 1
- Distribution
- Single device
- KV cache: bits per value
- 16
- KV cache: location
- GPU / unified memory
- Additional memory (workspace), minimum per device in GiB
- 1
- Additional memory (workspace), maximum per device in GiB
- 3
- Host RAM (GiB)
- 64
- Consider CPU offload
- No
- Process images / scanned documents
- No
- Require tool use
- No
- For business use
- No
- Independent tests for the selected language
- No
Calculation: memory by memory-envelope-v1, ranking by shortlist-rank-v3.
Devstral-Small-2-24B-Instruct-2512
Planning profile CUDA · 48 GiB · Q4_K_M · llama.cpp b10964
Fits into memory with headroom. Speed not estimated. The rank follows the size where it is sufficient, then recency and evidence. Test the suitability with 20 tasks from your own code and run your tests on the result.
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Required per device: 19.3 to 22.0 GiB · Available per device: 43.2 GiB
No supported speed estimate for these settings. Measure time to first token and generation with the intended context and concurrency.
Resolve before the pilot
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Start the named configuration on the target device. Record model revision, runtime version, peak memory and execution errors.
Magistral-Small-2509
Planning profile CUDA · 48 GiB · Q4_K_M · llama.cpp b10964
Comes directly after the first test candidate in the ranking. The place says nothing about answer quality.
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Required per device: 19.3 to 22.0 GiB · Available per device: 43.2 GiB
No supported speed estimate for these settings. Measure time to first token and generation with the intended context and concurrency.
Resolve before the pilot
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Start the named configuration on the target device. Record model revision, runtime version, peak memory and execution errors.
Mistral-Small-3.2-24B-Instruct-2506
Planning profile CUDA · 48 GiB · Q4_K_M · llama.cpp b10964
Comes directly after the first test candidate in the ranking. The place says nothing about answer quality.
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: vendor data only
Required per device: 19.3 to 22.0 GiB · Available per device: 43.2 GiB
No supported speed estimate for these settings. Measure time to first token and generation with the intended context and concurrency.
Resolve before the pilot
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Start the named configuration on the target device. Record model revision, runtime version, peak memory and execution errors.
Acceptance with your own tasks
For coding, what counts is whether generated code passes your tests. Have the model solve tasks from your own codebase and run your existing tests on the result. The measure is the share of tests passed.
Suggested pilot: 20 representative cases with expected answers defined in advance, including failure cases and questions with no supported answer. Use the same prompts and documents for every candidate. Set minimum quality and maximum waiting time before testing. Record task scores, citation errors, time to first token and total time per case. Repeat under planned concurrency.
The result link opens this calculation with its assumptions and sources. Catalogue updates may change later results. Also save the JSON export with sources and snapshot for an auditable record.
Local deployment and API: your cost estimate
All amounts are your own assumptions in EUR excluding tax. Fields remain on this device. Downloading the decision brief includes them in the file. Enter 0 for costs that do not apply. Compare only options meeting your quality, availability and data handling needs.
Local/month = purchase ÷ useful life + W ÷ 1000 × hours × electricity price + operations. API/month = requests × (input tokens × input price + output tokens × output price) ÷ 1,000,000. Account separately for retrieval, storage, redundancy and API base fees. This estimate checks neither capacity nor comparable answer quality.
Applies to all results
Context: 32,768 tokens. Concurrent requests: 1. Reserve: 10%.
Speed is estimated. Only a test with your own examples shows whether a model handles your tasks well. Memory values are calculated, not measured. The license information does not replace a legal review for your intended use.
Test suitability for your task
For coding, what counts is whether generated code passes your tests. Have the model solve tasks from your own codebase and run your existing tests on the result. The measure is the share of tests passed.
How the finder calculates
If you measure yourself, read the value in the tg128 line of llama-bench. That is the response speed in tokens per second.
No sourced memory bandwidth is available for this hardware.
To measure, run llama-bench with your model file. llama-bench guide
“Officially built” says nothing about speed or correct output.
All 1,092 configurations
Devstral-Small-2-24B-Instruct-2512
Repository created on Nov 28, 2025 huggingface.co / Devstral-Small-2-24B-Instruct-2512
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 19.3 to 22.0 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Devstral-Small-2-24B-Instruct-2512 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 24.0 billion parameters, 262,144 tokens of context length and the creation date Nov 28, 2025. These figures bound the fit, they do not prove it.
Open the model card of Devstral-Small-2-24B-Instruct-2512 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Devstral-Small-2-24B-Instruct-2512
Repository created on Nov 28, 2025 huggingface.co / Devstral-Small-2-24B-Instruct-2512
- Fits the memory estimate, 10.9 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 29.3 to 32.3 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Devstral-Small-2-24B-Instruct-2512 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 24.0 billion parameters, 262,144 tokens of context length and the creation date Nov 28, 2025. These figures bound the fit, they do not prove it.
Open the model card of Devstral-Small-2-24B-Instruct-2512 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Magistral-Small-2509
Repository created on Sep 12, 2025 huggingface.co / Magistral-Small-2509
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 19.3 to 22.0 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Magistral-Small-2509 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 24.0 billion parameters, 131,072 tokens of context length and the creation date Sep 12, 2025. These figures bound the fit, they do not prove it.
Open the model card of Magistral-Small-2509 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Magistral-Small-2509
Repository created on Sep 12, 2025 huggingface.co / Magistral-Small-2509
- Fits the memory estimate, 10.9 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 29.3 to 32.3 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Magistral-Small-2509 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 24.0 billion parameters, 131,072 tokens of context length and the creation date Sep 12, 2025. These figures bound the fit, they do not prove it.
Open the model card of Magistral-Small-2509 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Mistral-Small-3.2-24B-Instruct-2506
Repository created on Jun 19, 2025 huggingface.co / Mistral-Small-3.2-24B-Instruct-2506
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: vendor data only
Memory fit
- Required per device
- 19.3 to 22.0 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
Vendor claimHumanEval Plus: 92.9%
Figure for the model variant. No measurement is available for this quantization.Vendor-reported HumanEval Plus with up to five attempts (Pass@5). Not comparable to a single-attempt result.Hugging Face Hub · Jun 20, 2025Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Mistral-Small-3.2-24B-Instruct-2506
Repository created on Jun 19, 2025 huggingface.co / Mistral-Small-3.2-24B-Instruct-2506
- Fits the memory estimate, 10.9 GiB stay free
- Speed cannot be estimated
- Suitability: vendor data only
Memory fit
- Required per device
- 29.3 to 32.3 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
Vendor claimHumanEval Plus: 92.9%
Figure for the model variant. No measurement is available for this quantization.Vendor-reported HumanEval Plus with up to five attempts (Pass@5). Not comparable to a single-attempt result.Hugging Face Hub · Jun 20, 2025Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Test with your own tasksThe list shows calculated values. Whether a model solves your tasks only shows in a test with your own data.
Magistral-Small-2506
Repository created on Jun 4, 2025 huggingface.co / Magistral-Small-2506
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 19.3 to 22.0 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Magistral-Small-2506 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 23.6 billion parameters, 40,960 tokens of context length and the creation date Jun 4, 2025. These figures bound the fit, they do not prove it.
Open the model card of Magistral-Small-2506 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Magistral-Small-2506
Repository created on Jun 4, 2025 huggingface.co / Magistral-Small-2506
- Fits the memory estimate, 10.9 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 29.3 to 32.3 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Magistral-Small-2506 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 23.6 billion parameters, 40,960 tokens of context length and the creation date Jun 4, 2025. These figures bound the fit, they do not prove it.
Open the model card of Magistral-Small-2506 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Qwen3-32B
Repository created on Apr 27, 2025 huggingface.co / Qwen3-32B
- Fits the memory estimate, 13.3 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 27.0 to 29.9 GiB
- Available per device
- 43.2 GiB
Response speed
The efficiency corridor of the estimate comes from a measurement series on llama.cpp. It is not verified for other runtimes.With vLLM, under load or with multi-token prediction, real values can differ considerably.Suitability for your task
For Qwen3-32B the catalogue holds no publisher measurement for the task Coding.
The catalogue names 32.8 billion parameters, 32,768 tokens of context length and the creation date Apr 27, 2025. These figures bound the fit, they do not prove it.
Open points
Note
- No compute capability is recorded for this card, so whether vLLM runs the format on it stays open. Read the level with nvidia-smi --query-gpu=compute_cap --format=csv and compare it with the figure of the quantisation.
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Qwen3-32B
Repository created on Apr 27, 2025 huggingface.co / Qwen3-32B
- Fits the memory estimate, 12.8 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 27.4 to 30.4 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Qwen3-32B the catalogue holds no publisher measurement for the task Coding.
The catalogue names 32.8 billion parameters, 32,768 tokens of context length and the creation date Apr 27, 2025. These figures bound the fit, they do not prove it.
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Qwen3-32B
Repository created on Apr 27, 2025 huggingface.co / Qwen3-32B
- Fits the memory estimate, 12.0 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 28.2 to 31.2 GiB
- Available per device
- 43.2 GiB
Response speed
The efficiency corridor of the estimate comes from a measurement series on llama.cpp. It is not verified for other runtimes.With vLLM, under load or with multi-token prediction, real values can differ considerably.Suitability for your task
For Qwen3-32B the catalogue holds no publisher measurement for the task Coding.
The catalogue names 32.8 billion parameters, 32,768 tokens of context length and the creation date Apr 27, 2025. These figures bound the fit, they do not prove it.
Open points
Note
- No compute capability is recorded for this card, so whether vLLM runs the format on it stays open. Read the level with nvidia-smi --query-gpu=compute_cap --format=csv and compare it with the figure of the quantisation.
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Mistral-Small-3.1-24B-Instruct-2503
Repository created on Mar 11, 2025 huggingface.co / Mistral-Small-3.1-24B-Instruct-2503
- Fits the memory estimate, 21.2 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 19.3 to 22.0 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Mistral-Small-3.1-24B-Instruct-2503 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 24.0 billion parameters, 131,072 tokens of context length and the creation date Mar 11, 2025. These figures bound the fit, they do not prove it.
Open the model card of Mistral-Small-3.1-24B-Instruct-2503 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Test with your own tasksThe list shows calculated values. Whether a model solves your tasks only shows in a test with your own data.
Mistral-Small-3.1-24B-Instruct-2503
Repository created on Mar 11, 2025 huggingface.co / Mistral-Small-3.1-24B-Instruct-2503
- Fits the memory estimate, 10.9 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 29.3 to 32.3 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Mistral-Small-3.1-24B-Instruct-2503 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 24.0 billion parameters, 131,072 tokens of context length and the creation date Mar 11, 2025. These figures bound the fit, they do not prove it.
Open the model card of Mistral-Small-3.1-24B-Instruct-2503 at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
DeepSeek-R1-Distill-Qwen-32B
Repository created on Jan 20, 2025 huggingface.co / DeepSeek-R1-Distill-Qwen-32B
- Fits the memory estimate, 12.8 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 27.5 to 30.4 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For DeepSeek-R1-Distill-Qwen-32B the catalogue holds no publisher measurement for the task Coding.
The catalogue names 32.8 billion parameters, 131,072 tokens of context length and the creation date Jan 20, 2025. These figures bound the fit, they do not prove it.
Open the model card of DeepSeek-R1-Distill-Qwen-32B at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Codestral-22B-v0.1
Repository created on May 29, 2024 huggingface.co / Codestral-22B-v0.1
- Fits the memory estimate, 20.1 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 20.4 to 23.1 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Codestral-22B-v0.1 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 22.2 billion parameters, 32,768 tokens of context length and the creation date May 29, 2024. These figures bound the fit, they do not prove it.
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Codestral-22B-v0.1
Repository created on May 29, 2024 huggingface.co / Codestral-22B-v0.1
- Fits the memory estimate, 10.2 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 30.0 to 33.0 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For Codestral-22B-v0.1 the catalogue holds no publisher measurement for the task Coding.
The catalogue names 22.2 billion parameters, 32,768 tokens of context length and the creation date May 29, 2024. These figures bound the fit, they do not prove it.
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
DeepSeek-R1-0528-Qwen3-8B
Repository created on May 29, 2025 huggingface.co / DeepSeek-R1-0528-Qwen3-8B
- Fits the memory estimate, 30.7 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 10.2 to 12.5 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For DeepSeek-R1-0528-Qwen3-8B the catalogue holds no publisher measurement for the task Coding.
The catalogue names 8.2 billion parameters, 32,768 tokens of context length and the creation date May 29, 2025. These figures bound the fit, they do not prove it.
Open the model card of DeepSeek-R1-0528-Qwen3-8B at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
DeepSeek-R1-0528-Qwen3-8B
Repository created on May 29, 2025 huggingface.co / DeepSeek-R1-0528-Qwen3-8B
- Fits the memory estimate, 27.1 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 13.6 to 16.1 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
For DeepSeek-R1-0528-Qwen3-8B the catalogue holds no publisher measurement for the task Coding.
The catalogue names 8.2 billion parameters, 32,768 tokens of context length and the creation date May 29, 2025. These figures bound the fit, they do not prove it.
Open the model card of DeepSeek-R1-0528-Qwen3-8B at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Test with your own tasksThe list shows calculated values. Whether a model solves your tasks only shows in a test with your own data.
DeepSeek-R1-0528-Qwen3-8B
Repository created on May 29, 2025 huggingface.co / DeepSeek-R1-0528-Qwen3-8B
- Fits the memory estimate, 19.8 GiB stay free
- Speed cannot be estimated
- Suitability: no independent data
Memory fit
- Required per device
- 20.8 to 23.4 GiB
- Available per device
- 43.2 GiB
Response speed
The efficiency corridor of the estimate comes from a measurement series on llama.cpp. It is not verified for other runtimes.With vLLM, under load or with multi-token prediction, real values can differ considerably.Suitability for your task
For DeepSeek-R1-0528-Qwen3-8B the catalogue holds no publisher measurement for the task Coding.
The catalogue names 8.2 billion parameters, 32,768 tokens of context length and the creation date May 29, 2025. These figures bound the fit, they do not prove it.
Open the model card of DeepSeek-R1-0528-Qwen3-8B at the publisher
Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
Qwen3-8B
Repository created on Apr 27, 2025 huggingface.co / Qwen3-8B
- Fits the memory estimate, 30.7 GiB stay free
- Speed cannot be estimated
- Suitability: vendor data only
Memory fit
- Required per device
- 10.2 to 12.5 GiB
- Available per device
- 43.2 GiB
Response speed
Suitability for your task
Vendor claimLiveCodeBench v5 (2024.10–2025.02) / thinking: 57.5%
Figure for the model variant. No measurement is available for this quantization.Thinking mode. Up to eight attempts per task. The source does not define this as Pass@8. Manufacturer result from May 2025.Qwen Team, Qwen3 Technical Report (arXiv:2505.09388) · May 14, 2025Open points
Info
- Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
Why this assessment
20 of 1,092 shown
How to test a coding LLM
For coding, generated changes must work in your repository. Model size alone cannot answer that question. Assemble tasks using your languages, frameworks and existing tests.
The calculator starts without a chosen device, using a hypothetical 48 GiB CUDA profile, 32,768 context tokens and one request. Context should accommodate code and the task description. Adjust it to your actual inputs.
Evaluate bug fixes, extensions and understanding existing code separately. Execute tests in an isolated environment. Record whether each patch builds, passes tests and fully solves the task.
Tool calls are a separate requirement. If your workflow reads files, runs tests or applies changes, enable tools and check the model template and runtime support. Then measure the complete workflow rather than generation alone.
Model information
The catalog lists parameters, context length, license, and source. A catalog entry does not confirm that a model will run on your hardware.
The catalogue holds 1,081 models with technical data, 3,958 more by name only and 1,154 format editions of those models. The search finds all three.
Publisher directory
The finder reads the publishers’ model accounts in full. This overview shows per account how many models it computes with data and how many it only lists so far. The individual names are in the search above.
1,081 models with data, 3,958 more listed only, from 53 publisher accounts.
For the models that are only listed, the next reconciliation run fetches the technical data. Until then you find the name through the search and the model through the link to the account.
On top of that there are 1,154 format editions. That is the same model as GGUF, MLX, FP8, NVFP4, AWQ or GPTQ. The finder calculates them as a configuration of the original and lists their name so the search finds it.
| Publisher | With data | Listed only | Format editions |
|---|---|---|---|
| 01-ai | 6 | 22 | 0 |
| ai21labs | 11 | 1 | 4 |
| Aleph-Alpha | 7 | 13 | 3 |
| allenai | 25 | 792 | 20 |
| apple | 5 | 49 | 2 |
| arcee-ai | 20 | 101 | 59 |
| baichuan-inc | 5 | 8 | 5 |
| baidu | 14 | 3 | 1 |
| ByteDance-Seed | 12 | 28 | 2 |
| CohereLabs | 16 | 14 | 12 |
| deepseek-ai | 68 | 48 | 0 |
| 66 | 749 | 37 | |
| HuggingFaceTB | 22 | 34 | 10 |
| ibm-granite | 56 | 75 | 60 |
| IFM | 12 | 14 | 9 |
| inclusionAI | 23 | 118 | 37 |
| internlm | 9 | 69 | 29 |
| JetBrains | 3 | 11 | 16 |
| kakaocorp | 14 | 2 | 0 |
| LGAI-EXAONE | 13 | 9 | 28 |
| LiquidAI | 16 | 23 | 106 |
| llm-jp | 7 | 242 | 3 |
| meta-llama | 62 | 30 | 7 |
| microsoft | 83 | 234 | 29 |
| MiniMaxAI | 16 | 7 | 0 |
| mistralai | 33 | 17 | 16 |
| moonshotai | 16 | 0 | 0 |
| naver-hyperclovax | 4 | 2 | 0 |
| NousResearch | 17 | 75 | 33 |
| nvidia | 29 | 423 | 111 |
| occiglot | 10 | 0 | 0 |
| openai | 5 | 13 | 0 |
| openbmb | 22 | 68 | 61 |
| openGPT-X | 3 | 0 | 0 |
| OpenGVLab | 4 | 181 | 23 |
| PleIAs | 12 | 7 | 5 |
| Qwen | 86 | 111 | 239 |
| rinna | 4 | 26 | 27 |
| Salesforce | 10 | 104 | 5 |
| sarvamai | 5 | 2 | 6 |
| ServiceNow-AI | 7 | 1 | 1 |
| Skywork | 13 | 20 | 5 |
| stabilityai | 16 | 21 | 3 |
| stepfun-ai | 14 | 10 | 8 |
| swiss-ai | 13 | 0 | 9 |
| tencent | 30 | 33 | 38 |
| tiiuae | 27 | 26 | 59 |
| trillionlabs | 8 | 17 | 2 |
| upstage | 16 | 7 | 1 |
| utter-project | 20 | 16 | 0 |
| xai-org | 2 | 0 | 0 |
| XiaomiMiMo | 9 | 6 | 1 |
| zai-org | 55 | 76 | 22 |
Open catalogue for retrieval
The data this page calculates from is available as an open interface. Every observation names its source, that source's license and the date of capture. Responses are JSON and paginated, no account is needed.
- Header with snapshot, counts per collection and terms of use/wp-json/torck-llm/v1/catalog
- Entries of one collection with their current values/wp-json/torck-llm/v1/catalog/entities?kind=ModelVariant
- Single values with origin, source, date and unit/wp-json/torck-llm/v1/catalog/values
- Sources with license, status and terms of use/wp-json/torck-llm/v1/catalog/sources
- Changes since an earlier snapshot/wp-json/torck-llm/v1/catalog/changes?since=0
Only facts whose source permits sharing with attribution are served. The terms of the source also apply to any reuse; the exclusion rule is stated in the header. Data snapshot .
Sources and licenses
The finder takes single data points from these sources and turns them into memory and suitability assessments. The sources have not reviewed this evaluation.
- AMD
No data license stated · Individual facts with source link · Retrieved Sep 20, 2026 · Source documents: 15 - Apple
No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 21 - heise online, Jan-Keno Janssen
No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 1 - Hugging Face, Modellliste 01-ai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste ai21labs
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste Aleph-Alpha
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste allenai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste apple
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste arcee-ai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste baichuan-inc
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste baidu
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste ByteDance-Seed
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste CohereLabs
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste deepseek-ai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste google
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste HuggingFaceTB
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste ibm-granite
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste IFM
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste inclusionAI
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste internlm
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste JetBrains
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste kakaocorp
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste LGAI-EXAONE
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste LiquidAI
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste llm-jp
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste meta-llama
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste microsoft
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste MiniMaxAI
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste mistralai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste moonshotai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste naver-hyperclovax
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste NousResearch
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste nvidia
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste occiglot
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste openai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste openbmb
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste openGPT-X
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste OpenGVLab
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste PleIAs
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste Qwen
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste rinna
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste Salesforce
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste sarvamai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste ServiceNow-AI
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste Skywork
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste stabilityai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste stepfun-ai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste swiss-ai
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste tencent
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste tiiuae
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste trillionlabs
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste upstage
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste utter-project
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste xai-org
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste XiaomiMiMo
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face, Modellliste zai-org
License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - Hugging Face Hub
License: Apache 2.0; Gemma Terms of Use; Llama 3 Community License; Llama 3.1 Community License; Llama 3.2 Community License; Llama 3.3 Community License; MIT; MIT with the terms of the Llama base model; Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 3970 - Intel
No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 7 - Knoop, Holtmann (arXiv:2601.09527)
No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 1 - llama-roofline, Manu Nicholas Jacob
License: MIT · Used under license and terms of use · Retrieved Sep 17, 2026 · Source documents: 1 - llama.cpp, The ggml authors
License: MIT · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 10 - Max Vyaznikov, GPU Ark (Zenodo, doi:10.5281/zenodo.20390790)
License: CC BY 4.0 · Used under license and terms of use · Retrieved Sep 17, 2026 · Source documents: 1 - Meta Llama
No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 2 - MLX, MLX Contributors
License: MIT · Used under license and terms of use · Retrieved Sep 17, 2026 · Source documents: 1 - mlx-lm, Apple Inc.
License: MIT · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1 - mlx-lm, MLX Contributors
License: MIT · Used under license and terms of use · Retrieved Sep 17, 2026 · Source documents: 1 - NVIDIA
No data license stated · Individual facts with source link · Retrieved Sep 20, 2026 · Source documents: 27 - Qwen Team, Qwen3 Technical Report (arXiv:2505.09388)
No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 1 - Qwen Team
No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 1 - vLLM project
License: Apache 2.0 · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 10
Calculation method
The memory calculation follows method memory-envelope-v1: weights + 2*layers*kv_heads*head_dim*kv_bytes*context*concurrency + workspace
The KV cache gets a 5% allowance for memory management, the file size of the weights 3%. The runtime workspace is set at 1.0 to 3.0 GiB. A 10% reserve of device memory stays free.
The assumptions are based on the vLLM documentation on memory optimization and are a planning assumption by torck, recorded on .
Worked example for Devstral-Small-2-24B-Instruct-2512 in Q4_K_M on Planning profile CUDA · 48 GiB with 32,768 context tokens and concurrent requests 1. Weights 13.3 to 13.8 GiB, KV cache 5.0 to 5.3 GiB, runtime workspace 1.0 to 3.0 GiB. Together that is 19.3 to 22.0 GiB. 43.2 GiB are usable.
Computable means that the model variant has at least one configuration with a documented file size. This applies to 400 of 1,081 model variants in the catalogue. The catalogue lists the others with technical data but without a computable configuration yet.
Memory requirements are calculated, not measured. They consist of the model weights based on file size or quantization bit width, the KV cache for context and concurrent requests, and the runtime workspace. The selected reserve remains free.
Response speed is estimated, not measured. The upper bound is the memory bandwidth of the device divided by the bytes read for each generated token, i.e. the active parameters times bytes per weight plus the KV cache. The finder shows a range of 60 to 80 percent of this upper bound. This corridor is a rule of thumb, not a guarantee of accuracy. A number appears only for CUDA and Metal, for a single request and for models that fit entirely into device memory.
For runtime and device, each configuration names an evidence level, such as “Officially built” or “Target architecture in the official build”. An evidence level says nothing about speed or error-free output. If evidence is missing, the reason is listed under open points.
The estimate can be wrong in several cases. For MoE models, the calculation can be considerably too high. Long context, backend, driver and build, several concurrent requests, vLLM under load and offload change the real rate. For ROCm and SYCL, the finder shows no number because no verified reference measurement is available. Prompt processing before the first answer is not included.