Which local LLMs to consider for documents

As of the data snapshot of , the memory of Planning profile CUDA · 48 GiB is sufficient by calculation for 460 of 1,148 catalogued configurations, 31 of them tight. Assumptions: 32,768 context tokens, concurrent requests 2, reserve 10%. 43.2 GiB remain usable. For 429 configurations a complete memory value is still missing.

The first test candidate is Mistral-Small-3.2-24B-Instruct-2506 in Q4_K_M with llama.cpp. This configuration needs up to 27.2 GiB, there is no speed estimate for this device. Runtime status llama.cpp: Build b10964 from Sep 14, 2026 (release notes). Suitability for German: tier C, solid. Memory and speed are calculated, not measured. Only a test with your own questions shows whether a model suits your task.

torck LLM Finder

Your requirements

401 computable models · 1,148 configurations · 93 hardware options · Data snapshot

Straight to the result

Start with

Your hardware is known. The finder checks model configurations for this device.

Your model is known. The finder checks which listed hardware can run it under these settings.

Describe the task and requirements. The finder filters configurations using these inputs.

Select two to four configurations for a side-by-side comparison.

Select up to four configurations

Search by model, quantisation or runtime. 1,148 configurations are available.

Nothing selected yet. Search above for a model to compare configurations.

The task sets the speed guide value for the shortlist. For agents, the finder also checks support for external tools. The task does not filter models by answer quality.

Hardware undecided: start with a 48 GiB planning profile

Another 2,883 models are in the catalogue and are not calculated: 2,456 no reason recorded, 402 without a quantized edition at an allow-listed account, 20 not a language model choice, 5 format edition of another model. Open the model overview
Tokens per request, including input, history and planned output.
torck assumption: about one in ten people sends a request at the same time. This sets the number of concurrent requests below. If you know the load, enter it there directly.
Number of requests processed at the same time.
Memory and serving assumptions
Missing license information is marked as unresolved.
Select a language. Without an independent test, suitability remains unverified.
The runtime executes the model. Its version, format and hardware support must align.
Quantization sets how many bits store each model value. It affects memory use and may affect quality.

Workspace is additional memory for intermediate results and the runtime. The range is an estimate. It depends on how many tokens are processed together and which runtime you use. Image processing may require additional memory.

The KV cache stores intermediate request states. Context length and concurrent requests increase its memory use.

GPU memory and CPU RAM may be used together, depending on the configuration. Actual allocation may differ.

Results 9

9 of 9 results, page 1 of 1.

Calculated memory requirement: Fits the memory estimate: 18 · Fits with little headroom: 2 · Data snapshot

What the symbols mean

  • clear: Memory is sufficient by calculation, or the figure beside it is measured.
  • with a caveat: Tight, at the memory limit, or only with CPU offload. The sentence beside it names the case.
  • not possible: Memory is missing, or runtime and hardware do not fit together.
  • open: A value is missing from the data snapshot, so it cannot be calculated.
  • estimated: Calculated, not measured.
  • measured: Measured or independently rated, source and origin are stated in the details.
  • publisher: Stated by the publisher, not independently measured.

Models for an initial test

Guide value for this task: 10 tokens per second. That is an assumption by torck, no sourced threshold exists for it.

  • First test candidate

    Mistral-Small-3.2-24B-Instruct-2506
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Jun 19, 2025 huggingface.co / Mistral-Small-3.2-24B-Instruct-2506

    • Fits the memory estimate, 16.0 GiB stay free
    • Speed cannot be estimated
    • Suitability for German: tier C, solid

    Fits into memory with headroom. Speed not estimated. The rank follows the size where it is sufficient, then recency and evidence. Suitability according to LMArena, category German: tier C (solid).

    Memory fit
    Required per device
    24.3 to 27.2 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task
    Independent rating (LMArena)

    Tier C on a scale from A to D in the category German: solid.

    Listed at LMArena as “Mistral Small 3.2 (2506)”, rating 1,340 from 427 votes. Compared with the best open model in the category (GLM-5.3 (Max), 1,497).torck groups the rating into four tiers: up to 40 points behind is tier A, up to 100 tier B, up to 200 tier C, beyond that tier D. The basis is votes from head-to-head comparisons, not a test with your data. The tier applies to the model, not to this quantization.LMArena Text Arena · As of Nov 11, 2026 · CC BY 4.0
    Vendor claim

    DocVQA: 94.9%

    Figure for the model variant. No measurement is available for this quantization.Vendor-reported document understanding result. Execution conditions are not fully documented.Hugging Face Hub · Jun 20, 2025
    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
  • Different publisher

    Qwen3-32B
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Apr 27, 2025 huggingface.co / Qwen3-32B

    • Fits the memory estimate, 4.4 GiB stay free
    • Speed cannot be estimated
    • Suitability for German: tier C, solid

    Comes from a different publisher than the first candidate. This helps when the licence or the publisher’s origin matters. Suitability according to LMArena, category German: tier C (solid).

    Memory fit
    Required per device
    35.4 to 38.8 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task
    Independent rating (LMArena)

    Tier C on a scale from A to D in the category German: solid.

    Listed at LMArena as “Qwen3-32B”, rating 1,341 from 172 votes. Compared with the best open model in the category (GLM-5.3 (Max), 1,497).torck groups the rating into four tiers: up to 40 points behind is tier A, up to 100 tier B, up to 200 tier C, beyond that tier D. The basis is votes from head-to-head comparisons, not a test with your data. The tier applies to the model, not to this quantization.LMArena Text Arena · As of Nov 11, 2026 · CC BY 4.0

    Open the model card of Qwen3-32B at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
  • More model parameters

    Qwen3-30B-A3B
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Apr 27, 2025 huggingface.co / Qwen3-30B-A3B

    • Fits the memory estimate, 16.1 GiB stay free
    • Speed cannot be estimated
    • Suitability for German: tier C, solid

    Has more parameters than the first test candidate. More parameters do not guarantee better answers. Suitability according to LMArena, category German: tier C (solid).

    Memory fit
    Required per device
    24.3 to 27.1 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task
    Independent rating (LMArena)

    Tier C on a scale from A to D in the category German: solid.

    Listed at LMArena as “Qwen3-30B-A3B”, rating 1,306 from 766 votes. Compared with the best open model in the category (GLM-5.3 (Max), 1,497).torck groups the rating into four tiers: up to 40 points behind is tier A, up to 100 tier B, up to 200 tier C, beyond that tier D. The basis is votes from head-to-head comparisons, not a test with your data. The tier applies to the model, not to this quantization.LMArena Text Arena · As of Nov 11, 2026 · CC BY 4.0

    Open the model card of Qwen3-30B-A3B at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    • MoE: all resident weights count, not only active parameters.

The whole list follows one ranking. Configurations with verified data come first. Then the suitability tier for your task and language according to LMArena counts, from A to D. Models without a tier follow after all models with a tier. Within a tier it counts whether the estimated minimum speed at the selected context reaches the guide value for your task. After that the larger size class wins, within one size class the model whose repository was created later, then the higher parameter count, finally memory headroom and verified runtime data. The tier rests on votes from head-to-head comparisons and does not replace a test with your data.

Decision brief and test plan

Decision brief and test plan

Data snapshot: Nov 23, 2026

Context: 32,768 tokens. Concurrent requests: 2. Reserve: 10%.

This selection provides candidates for a practical test. Memory and speed are estimates. The suitability tiers rest on votes at LMArena and do not establish production readiness.

Start with
I have a use case
Task
Document analysis
Application language
German
Number of identical devices
1
Distribution
Single device
KV cache: bits per value
16
KV cache: location
GPU / unified memory
Additional memory (workspace), minimum per device in GiB
1
Additional memory (workspace), maximum per device in GiB
3
Host RAM (GiB)
64
Consider CPU offload
No
Process images / scanned documents
No
Require tool use
No
For business use
No
Independent tests for the selected language
No

Calculation: memory by memory-envelope-v1, ranking by shortlist-rank-v4.

Mistral-Small-3.2-24B-Instruct-2506

Planning profile CUDA · 48 GiB · Q4_K_M · llama.cpp b10964

Fits into memory with headroom. Speed not estimated. The rank follows the size where it is sufficient, then recency and evidence. Suitability according to LMArena, category German: tier C (solid).

  • Fits the memory estimate, 16.0 GiB stay free
  • Speed cannot be estimated
  • Suitability for German: tier C, solid

Required per device: 24.3 to 27.2 GiB · Available per device: 43.2 GiB

No supported speed estimate for these settings. Measure time to first token and generation with the intended context and concurrency.

Resolve before the pilot
  • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.

Start the named configuration on the target device. Record model revision, runtime version, peak memory and execution errors.

Qwen3-32B

Planning profile CUDA · 48 GiB · Q4_K_M · llama.cpp b10964

Comes from a different publisher than the first candidate. This helps when the licence or the publisher’s origin matters. Suitability according to LMArena, category German: tier C (solid).

  • Fits the memory estimate, 4.4 GiB stay free
  • Speed cannot be estimated
  • Suitability for German: tier C, solid

Required per device: 35.4 to 38.8 GiB · Available per device: 43.2 GiB

No supported speed estimate for these settings. Measure time to first token and generation with the intended context and concurrency.

Resolve before the pilot
  • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.

Start the named configuration on the target device. Record model revision, runtime version, peak memory and execution errors.

Qwen3-30B-A3B

Planning profile CUDA · 48 GiB · Q4_K_M · llama.cpp b10964

Has more parameters than the first test candidate. More parameters do not guarantee better answers. Suitability according to LMArena, category German: tier C (solid).

  • Fits the memory estimate, 16.1 GiB stay free
  • Speed cannot be estimated
  • Suitability for German: tier C, solid

Required per device: 24.3 to 27.1 GiB · Available per device: 43.2 GiB

No supported speed estimate for these settings. Measure time to first token and generation with the intended context and concurrency.

Resolve before the pilot
  • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
  • MoE: all resident weights count, not only active parameters.

Start the named configuration on the target device. Record model revision, runtime version, peak memory and execution errors.

Acceptance with your own tasks

For documents, what counts is whether content, tables and references are captured correctly. Use documents whose content you know and compare the extracted values, tables and references with your own evaluation.

Suggested pilot: 20 representative cases with expected answers defined in advance, including failure cases and questions with no supported answer. Use the same prompts and documents for every candidate. Set minimum quality and maximum waiting time before testing. Record task scores, citation errors, time to first token and total time per case. Repeat under planned concurrency.

The result link opens this calculation with its assumptions and sources. Catalogue updates may change later results. Also save the JSON export with sources and snapshot for an auditable record.

Own hardware, rented GPU and API: your cost estimate

All amounts are your own assumptions in EUR excluding tax. Prices are not prefilled: enter the offers you have. The GPU count comes from the calculation above. Each block is calculated as soon as its fields are complete. Enter 0 for costs that do not apply. Fields remain on this device. Downloading the decision brief includes them in the file. Compare only options meeting your quality, availability and data handling needs.

Own hardware
Rented GPU
API
Usage

Own hardware/month = purchase ÷ useful life + W ÷ 1000 × hours × electricity price + operations. Rented GPU/month = rental price × GPUs × booked hours + operations. API/month = requests × (input tokens × input price + output tokens × output price) ÷ 1,000,000. Break-even = purchase ÷ (cost of the alternative − running cost of own hardware). Account separately for retrieval, storage, redundancy and API base fees. This estimate checks neither capacity nor comparable answer quality.

Complete at least one block with valid values to compare costs.

Applies to all results

Context: 32,768 tokens. Concurrent requests: 2. Reserve: 10%.

Speed is estimated. Only a test with your own examples shows whether a model handles your tasks well. Memory values are calculated, not measured. The license information does not replace a legal review for your intended use.

Test suitability for your task

For documents, what counts is whether content, tables and references are captured correctly. Use documents whose content you know and compare the extracted values, tables and references with your own evaluation.

For scanned documents, text recognition (OCR) before the language model strongly affects the result. Test both stages together.

The catalog has no independent measurement with clear licensing for German.

Many tests for German and French are based on translated English tasks. Such values can misrepresent performance in the target language.

How the finder calculates

If you measure yourself, read the value in the tg128 line of llama-bench. That is the response speed in tokens per second.

The calculation applies to a single request. With several concurrent requests it gives no reliable number.

No sourced memory bandwidth is available for this hardware.

To measure, run llama-bench with your model file. llama-bench guide

“Officially built” says nothing about speed or correct output.

9 models from 20 configurations

Showing configurations that meet all recorded requirements. 1,128 more do not fit or are still open. Show all 1,148

  • Mistral-Small-3.2-24B-Instruct-2506
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Jun 19, 2025 huggingface.co / Mistral-Small-3.2-24B-Instruct-2506

    • Fits the memory estimate, 16.0 GiB stay free
    • Speed cannot be estimated
    • Suitability for German: tier C, solid
    Memory fit
    Required per device
    24.3 to 27.2 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task
    Independent rating (LMArena)

    Tier C on a scale from A to D in the category German: solid.

    Listed at LMArena as “Mistral Small 3.2 (2506)”, rating 1,340 from 427 votes. Compared with the best open model in the category (GLM-5.3 (Max), 1,497).torck groups the rating into four tiers: up to 40 points behind is tier A, up to 100 tier B, up to 200 tier C, beyond that tier D. The basis is votes from head-to-head comparisons, not a test with your data. The tier applies to the model, not to this quantization.LMArena Text Arena · As of Nov 11, 2026 · CC BY 4.0
    Vendor claim

    DocVQA: 94.9%

    Figure for the model variant. No measurement is available for this quantization.Vendor-reported document understanding result. Execution conditions are not fully documented.Hugging Face Hub · Jun 20, 2025
    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    More configurations of this model (1)
    • Fits the memory estimate: Q8_0 · llama.cpp · 34.3 to 37.5 GiB per device
    Why this assessment

    Show the calculation and its sources

  • Qwen3-32B
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Apr 27, 2025 huggingface.co / Qwen3-32B

    • Fits the memory estimate, 4.4 GiB stay free
    • Speed cannot be estimated
    • Suitability for German: tier C, solid
    Memory fit
    Required per device
    35.4 to 38.8 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task
    Independent rating (LMArena)

    Tier C on a scale from A to D in the category German: solid.

    Listed at LMArena as “Qwen3-32B”, rating 1,341 from 172 votes. Compared with the best open model in the category (GLM-5.3 (Max), 1,497).torck groups the rating into four tiers: up to 40 points behind is tier A, up to 100 tier B, up to 200 tier C, beyond that tier D. The basis is votes from head-to-head comparisons, not a test with your data. The tier applies to the model, not to this quantization.LMArena Text Arena · As of Nov 11, 2026 · CC BY 4.0

    Open the model card of Qwen3-32B at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    Why this assessment

    Show the calculation and its sources

  • Qwen3-30B-A3B
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Apr 27, 2025 huggingface.co / Qwen3-30B-A3B

    • Fits the memory estimate, 16.1 GiB stay free
    • Speed cannot be estimated
    • Suitability for German: tier C, solid
    Memory fit
    Required per device
    24.3 to 27.1 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task
    Independent rating (LMArena)

    Tier C on a scale from A to D in the category German: solid.

    Listed at LMArena as “Qwen3-30B-A3B”, rating 1,306 from 766 votes. Compared with the best open model in the category (GLM-5.3 (Max), 1,497).torck groups the rating into four tiers: up to 40 points behind is tier A, up to 100 tier B, up to 200 tier C, beyond that tier D. The basis is votes from head-to-head comparisons, not a test with your data. The tier applies to the model, not to this quantization.LMArena Text Arena · As of Nov 11, 2026 · CC BY 4.0

    Open the model card of Qwen3-30B-A3B at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    • MoE: all resident weights count, not only active parameters.
    More configurations of this model (1)
    • Fits with little headroom: Q8_0 · llama.cpp · 37.3 to 40.5 GiB per device
    Why this assessment

    Show the calculation and its sources

  • Mistral-Small-3.1-24B-Instruct-2503
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Mar 11, 2025 huggingface.co / Mistral-Small-3.1-24B-Instruct-2503

    • Fits the memory estimate, 16.0 GiB stay free
    • Speed cannot be estimated
    • Suitability for German: tier D, well behind the best open models
    Memory fit
    Required per device
    24.3 to 27.2 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task
    Independent rating (LMArena)

    Tier D on a scale from A to D in the category German: well behind the best open models.

    Listed at LMArena as “Mistral Small 3.1 24B Instruct (2503)”, rating 1,266 from 875 votes. Compared with the best open model in the category (GLM-5.3 (Max), 1,497).torck groups the rating into four tiers: up to 40 points behind is tier A, up to 100 tier B, up to 200 tier C, beyond that tier D. The basis is votes from head-to-head comparisons, not a test with your data. The tier applies to the model, not to this quantization.LMArena Text Arena · As of Nov 11, 2026 · CC BY 4.0

    Open the model card of Mistral-Small-3.1-24B-Instruct-2503 at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    More configurations of this model (1)
    • Fits the memory estimate: Q8_0 · llama.cpp · 34.3 to 37.5 GiB per device
    Why this assessment

    Show the calculation and its sources

  • Magistral-Small-2509
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Sep 12, 2025 huggingface.co / Magistral-Small-2509

    • Fits the memory estimate, 15.9 GiB stay free
    • Speed cannot be estimated
    • Suitability: no independent data
    Memory fit
    Required per device
    24.3 to 27.3 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task

    For Magistral-Small-2509 the catalogue holds no publisher measurement for the task Document analysis.

    The catalogue names image input, 131,072 tokens of context length and the creation date Sep 12, 2025. These figures bound the fit, they do not prove it.

    Open the model card of Magistral-Small-2509 at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    More configurations of this model (1)
    • Fits the memory estimate: Q8_0 · llama.cpp · 34.3 to 37.5 GiB per device
    Why this assessment

    Show the calculation and its sources

  • Magistral-Small-2506
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Jun 4, 2025 huggingface.co / Magistral-Small-2506

    • Fits the memory estimate, 16.0 GiB stay free
    • Speed cannot be estimated
    • Suitability: no independent data
    Memory fit
    Required per device
    24.3 to 27.2 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task

    For Magistral-Small-2506 the catalogue holds no publisher measurement for the task Document analysis.

    The catalogue names no image input, 40,960 tokens of context length and the creation date Jun 4, 2025. These figures bound the fit, they do not prove it.

    Open the model card of Magistral-Small-2506 at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    More configurations of this model (1)
    • Fits the memory estimate: Q8_0 · llama.cpp · 34.3 to 37.5 GiB per device
    Why this assessment

    Show the calculation and its sources

  • Test with your own tasksThe list shows calculated values. Whether a model solves your tasks only shows in a test with your own data.

    Request a feasibility check

  • Qwen3-8B
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Apr 27, 2025 huggingface.co / Qwen3-8B

    • Fits the memory estimate, 25.9 GiB stay free
    • Speed cannot be estimated
    • Suitability: no independent data
    Memory fit
    Required per device
    14.7 to 17.3 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task

    For Qwen3-8B the catalogue holds no publisher measurement for the task Document analysis.

    The catalogue names no image input, 32,768 tokens of context length and the creation date Apr 27, 2025. These figures bound the fit, they do not prove it.

    Open the model card of Qwen3-8B at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    More configurations of this model (2)
    • Fits the memory estimate: Q8_0 · llama.cpp · 18.1 to 20.8 GiB per device
    • Fits the memory estimate: BF16 · vLLM · 25.3 to 28.2 GiB per device
    Why this assessment

    Show the calculation and its sources

  • Qwen3-14B
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Apr 27, 2025 huggingface.co / Qwen3-14B

    • Fits the memory estimate, 21.1 GiB stay free
    • Speed cannot be estimated
    • Suitability: no independent data
    Memory fit
    Required per device
    19.4 to 22.1 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task

    For Qwen3-14B the catalogue holds no publisher measurement for the task Document analysis.

    The catalogue names no image input, 32,768 tokens of context length and the creation date Apr 27, 2025. These figures bound the fit, they do not prove it.

    Open the model card of Qwen3-14B at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    More configurations of this model (2)
    • Fits the memory estimate: Q8_0 · llama.cpp · 25.6 to 28.6 GiB per device
    • Fits with little headroom: BF16 · vLLM · 38.5 to 41.8 GiB per device
    Why this assessment

    Show the calculation and its sources

  • Mistral-Nemo-Instruct-2407
    Quantization
    Q4_K_M
    Runtime
    llama.cpp

    Repository created on Jul 17, 2024 huggingface.co / Mistral-Nemo-Instruct-2407

    • Fits the memory estimate, 22.5 GiB stay free
    • Speed cannot be estimated
    • Suitability: no independent data
    Memory fit
    Required per device
    18.0 to 20.7 GiB
    Available per device
    43.2 GiB
    Response speed
    Suitability for your task

    For Mistral-Nemo-Instruct-2407 the catalogue holds no publisher measurement for the task Document analysis.

    The catalogue names no image input, 131,072 tokens of context length and the creation date Jul 17, 2024. These figures bound the fit, they do not prove it.

    Open the model card of Mistral-Nemo-Instruct-2407 at the publisher

    Open points

    Info

    • Planning profile without a device. Choose a card from the device list and the finder also checks runtime and speed.
    More configurations of this model (2)
    • Fits the memory estimate: Q8_0 · llama.cpp · 23.1 to 26.0 GiB per device
    • Fits the memory estimate: BF16 · vLLM · 33.8 to 37.0 GiB per device
    Why this assessment

    Show the calculation and its sources

How to test document processing

Document processing covers different tasks. Extracted text has different requirements from scanned pages or images. Decide whether OCR and layout analysis happen before the language model.

This example uses text, 32,768 context tokens, two concurrent requests and a hypothetical 48 GiB CUDA profile. Vision is disabled. Enable it for scans or visual content if needed. Extra image memory remains unresolved where evidence is missing.

Use reference documents with known field values and tables. Test missing values, tables spanning pages and conflicting values. Count correct extractions per field and invented additions separately.

Long context does not guarantee correct processing of every page. Test relevant facts at the start, middle and end of a document. Record document version, preprocessing and model revision in the worksheet.

Model information

The catalog lists parameters, context length, license, and source. A catalog entry does not confirm that a model will run on your hardware.

The catalogue holds 3,284 models with technical data, 3,958 more by name only and 1,154 format editions of those models. The search finds all three.

Publisher directory

The finder reads the publishers’ model accounts in full. This overview shows per account how many models it computes with data and how many it only lists so far. The individual names are in the search above.

3,284 models with data, 3,958 more listed only, from 54 publisher accounts.

For the models that are only listed, the next reconciliation run fetches the technical data. Until then you find the name through the search and the model through the link to the account.

On top of that there are 1,154 format editions. That is the same model as GGUF, MLX, FP8, NVFP4, AWQ or GPTQ. The finder calculates them as a configuration of the original and lists their name so the search finds it.

PublisherWith dataListed onlyFormat editions
01-ai28220
ai21labs1414
Aleph-Alpha17133
allenai10379220
apple20492
arcee-ai10410159
baichuan-inc1885
baidu3631
ByteDance-Seed38282
CohereLabs351412
deepseek-ai87480
google15274937
HuggingFaceTB393410
ibm-granite1347560
IFM59149
inclusionAI11611837
internlm1016929
JetBrains361116
kakaocorp2520
LGAI-EXAONE41928
LiquidAI20123106
llm-jp1642423
meta-llama62307
meta-models600
microsoft14923429
MiniMaxAI1870
mistralai341716
moonshotai1700
naver-hyperclovax620
NousResearch897533
nvidia140423111
occiglot1000
openai5130
openbmb1356861
openGPT-X400
OpenGVLab14018123
PleIAs1575
Qwen206111239
rinna572627
Salesforce931045
sarvamai1426
ServiceNow-AI1011
Skywork30205
stabilityai40213
stepfun-ai31108
swiss-ai3209
tencent1063338
tiiuae862659
trillionlabs25172
upstage1871
utter-project23160
xai-org200
XiaomiMiMo2661
zai-org877622

Open catalogue for retrieval

The data this page calculates from is available as an open interface. Every observation names its source, that source's license and the date of capture. Responses are JSON and paginated, no account is needed.

Only facts whose source permits sharing with attribution are served. The terms of the source also apply to any reuse; the exclusion rule is stated in the header. Data snapshot .

Sources and licenses

The finder takes single data points from these sources and turns them into memory and suitability assessments. The sources have not reviewed this evaluation.

  • AMD
    No data license stated · Individual facts with source link · Retrieved Sep 20, 2026 · Source documents: 15
  • Apple
    No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 21
  • heise online, Jan-Keno Janssen
    No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 1
  • Hugging Face, Modellliste 01-ai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste ai21labs
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste Aleph-Alpha
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste allenai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste apple
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste arcee-ai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste baichuan-inc
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste baidu
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste ByteDance-Seed
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste CohereLabs
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste deepseek-ai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste google
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste HuggingFaceTB
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste ibm-granite
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste IFM
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste inclusionAI
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste internlm
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste JetBrains
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste kakaocorp
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste LGAI-EXAONE
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste LiquidAI
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste llm-jp
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste meta-llama
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste microsoft
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste MiniMaxAI
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste mistralai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste moonshotai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste naver-hyperclovax
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste NousResearch
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste nvidia
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste occiglot
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste openai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste openbmb
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste openGPT-X
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste OpenGVLab
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste PleIAs
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste Qwen
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste rinna
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste Salesforce
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste sarvamai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste ServiceNow-AI
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste Skywork
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste stabilityai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste stepfun-ai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste swiss-ai
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste tencent
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste tiiuae
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste trillionlabs
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste upstage
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste utter-project
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste xai-org
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste XiaomiMiMo
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face, Modellliste zai-org
    License: Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • Hugging Face Hub
    License: Apache 2.0; Gemma Terms of Use; Llama 3 Community License; Llama 3.1 Community License; Llama 3.2 Community License; Llama 3.3 Community License; MIT; MIT with the terms of the Llama base model; Publisher's own license (text at the source) · Used under license and terms of use · Retrieved Nov 23, 2026 · Source documents: 8680
  • Intel
    No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 7
  • Knoop, Holtmann (arXiv:2601.09527)
    No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 1
  • llama-roofline, Manu Nicholas Jacob
    License: MIT · Used under license and terms of use · Retrieved Sep 17, 2026 · Source documents: 1
  • llama.cpp, The ggml authors
    License: MIT · Used under license and terms of use · Retrieved Nov 23, 2026 · Source documents: 40
  • Max Vyaznikov, GPU Ark (Zenodo, doi:10.5281/zenodo.20390790)
    License: CC BY 4.0 · Used under license and terms of use · Retrieved Sep 17, 2026 · Source documents: 1
  • Meta Llama
    No data license stated · Individual facts with source link · Retrieved Oct 1, 2026 · Source documents: 4
  • MLX, MLX Contributors
    License: MIT · Used under license and terms of use · Retrieved Sep 17, 2026 · Source documents: 1
  • mlx-lm, Apple Inc.
    License: MIT · Used under license and terms of use · Retrieved Sep 18, 2026 · Source documents: 1
  • mlx-lm, MLX Contributors
    License: MIT · Used under license and terms of use · Retrieved Sep 17, 2026 · Source documents: 1
  • NVIDIA
    No data license stated · Individual facts with source link · Retrieved Sep 20, 2026 · Source documents: 27
  • Qwen Team, Qwen3 Technical Report (arXiv:2505.09388)
    No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 1
  • Qwen Team
    No data license stated · Individual facts with source link · Retrieved Sep 17, 2026 · Source documents: 1
  • vLLM project
    License: Apache 2.0 · Used under license and terms of use · Retrieved Nov 20, 2026 · Source documents: 22
  • LMArena Text Arena
    License: CC BY 4.0 · suitability tiers for 196 repositories · as of Nov 11, 2026
Calculation method

The memory calculation follows method memory-envelope-v1: weights + 2*layers*kv_heads*head_dim*kv_bytes*context*concurrency + workspace

The KV cache gets a 5% allowance for memory management, the file size of the weights 3%. The runtime workspace is set at 1.0 to 3.0 GiB. A 10% reserve of device memory stays free.

The assumptions are based on the vLLM documentation on memory optimization and are a planning assumption by torck, recorded on .

Worked example for Mistral-Small-3.2-24B-Instruct-2506 in Q4_K_M on Planning profile CUDA · 48 GiB with 32,768 context tokens and concurrent requests 2. Weights 13.3 to 13.7 GiB, KV cache 10.0 to 10.5 GiB, runtime workspace 1.0 to 3.0 GiB. Together that is 24.3 to 27.2 GiB. 43.2 GiB are usable.

Computable means that the model variant has at least one configuration with a documented file size. This applies to 401 of 3,284 model variants in the catalogue. The catalogue lists the others with technical data but without a computable configuration yet.

Memory requirements are calculated, not measured. They consist of the model weights based on file size or quantization bit width, the KV cache for context and concurrent requests, and the runtime workspace. The selected reserve remains free.

Response speed is estimated, not measured. The upper bound is the memory bandwidth of the device divided by the bytes read for each generated token, i.e. the active parameters times bytes per weight plus the KV cache. The finder shows a range of 60 to 80 percent of this upper bound. This corridor is a rule of thumb, not a guarantee of accuracy. A number appears only for CUDA and Metal, for a single request and for models that fit entirely into device memory.

For runtime and device, each configuration names an evidence level, such as “Officially built” or “Target architecture in the official build”. An evidence level says nothing about speed or error-free output. If evidence is missing, the reason is listed under open points.

The estimate can be wrong in several cases. For MoE models, the calculation can be considerably too high. Long context, backend, driver and build, several concurrent requests, vLLM under load and offload change the real rate. For ROCm and SYCL, the finder shows no number because no verified reference measurement is available. Prompt processing before the first answer is not included.