For most industrial companies, reducing energy costs means doing the math first, not investing. Those who know where electricity and heat are actually being used can often find ways to save without installing a single new piece of equipment.
A brief study conducted by the Niederrhein University of Applied Sciences on behalf of Deutsche Umwelthilfe estimated just how great this potential actually is in German industry by 2025. The result is significantly higher than what most company executives expect, and it coincides with a year in which energy audits are required anyway for the industrial electricity price application.
In industry, waste is primarily found in unused process heat, in compressed air without load control, and in systems that continue to consume power at full capacity even when idling. The economic savings potential for German industry amounts to about 40 percent of its energy demand, and a good quarter of that pays for itself within three years. Those who identify these areas can reduce energy costs without curtailing production. An energy audit or ongoing monitoring provides exactly the data that must be submitted anyway for an application for the industrial electricity rate.
Reducing Energy Costs: Where Waste Occurs in Production
Process heat accounts for the largest single component of industrial energy consumption, followed by mechanical applications such as pumps, drives, and compressed air. According to the brief study, this is precisely where the greatest opportunities for improvement lie, foremost among them heat recovery, the electrification of heating processes, and the utilization of waste heat that would otherwise escape unused through the roof. In fact, 28 percent of these measures are already close to market readiness, meaning they are economically viable with payback periods of less than three years (duh.de, October 2025). Nevertheless, this potential remains untapped in many companies because no one continuously analyzes consumption on a per-machine and per-shift basis. An annual report shows only the total, not the machine that remains at operating temperature unnecessarily overnight.
The Energy Audit as the Basis for the Industrial Electricity Rate Application
For the billing years 2026 through 2028, the federal government will reimburse electricity- and trade-intensive companies for a portion of their electricity costs. The European Commission approved the German program on April 16, 2026, with a total funding allocation of 3.8 billion euros (bafa.de). Anyone wishing to submit an application must provide reliable evidence of electricity consumption, the reference price, and the planned decarbonization measures. An energy audit or a certified energy management system provides exactly these figures and, at the same time, identifies areas where energy costs can be reduced before a single cent of funding is disbursed. The article provides more details on the process and deadlines 2026 Industrial Electricity Price: Eligibility Requirements and Application Process.
Why March 31, 2027, is significant for two proceedings at the same time
The application deadline for the industrial electricity price for the 2026 billing year is March 31, 2027, with an extended deadline of July 15, 2027, for companies that are also applying for electricity price compensation (bafa.de). On the same day, March 31, companies with an annual consumption of more than 2.5 gigawatt-hours are also required to report their waste heat potential to the Federal Office for Energy Efficiency. Those who set up their energy data management system for the first deadline will generally be covered for the second as well. Those who do not begin both processes until the first quarter of 2027 will miss out on the time needed to establish a reliable data foundation.
That is the proportion of the economic energy-saving potential in German industry that is market-ready, measures with a payback period of less than three years.
Lower Rhine University of Applied Sciences / German Environmental Aid, Brief Study, 10/2025
Why Measurement Data Is More Accurate Than Estimates
Many energy audits rely on annual totals from electricity bills and supplementary estimates for individual systems. While this meets the minimum legal requirement, it sacrifices the level of accuracy that would be important for setting your own priorities. Monitoring that tracks consumption by system and shift, on the other hand, reveals exactly how much electricity each machine actually draws while idle and whether a compressor is running unnecessarily at night. This level of detail changes which measures are implemented first. A rough annual figure only indicates that there is potential somewhere, not exactly where. This article describes how energy monitoring can be specifically set up in production. Energy Monitoring: 5 to 25 Percent Savings Through Transparency.
The requirement to report waste heat as an additional deadline
Under Section 17 of the Energy Efficiency Act, companies with an average annual consumption of more than 2.5 gigawatt-hours must report the name, location, heat quantity, and temperature level of their waste heat to the Federal Office for Energy Efficiency by March 31 of each year (bafa.de, EnEfG Fact Sheet). Anyone who fails to comply with this requirement, or does so incorrectly or late, risks a fine. For companies with an annual consumption exceeding 7.5 gigawatt-hours, there is an additional requirement to implement an energy or environmental management system in accordance with DIN EN ISO 50001. In practice, both thresholds primarily affect energy-intensive manufacturing facilities; they are less common for retail companies with only office and warehouse space. The threshold assessment is based on the average total final energy consumption of the entire company over the last three complete calendar years; waste heat is then reported broken down by location, with each location having its own address and temperature level.
| Commitment | Threshold | Deadline |
|---|---|---|
| Energy Audit in Accordance with EDL-G | All non-SMEs without an EnMS | Every four years |
| Energy or Environmental Management System | Over 7.5 GWh/year | 20 months after the cutoff date |
| Waste Heat Alert | Over 2.5 GWh/year | Annually as of March 31 |
| 2026 Industrial Electricity Price Proposal | Electricity- and trade-intensive companies | Through March 31, 2027 |
Monitoring reveals where energy is being wasted, but it does not implement the necessary measures on its own. Heat recovery, new compressors, or the electrification of process heat remain investment decisions with their own lead times, often longer than what an application deadline allows. For very small facilities below the legal thresholds, a comprehensive monitoring system is often not economically viable; in these cases, spot measurements of the largest energy consumers are sufficient.
Organizing Energy Data Before the Application Season
Anyone who wants to submit applications in the first quarter of 2027 should start building the database now, rather than waiting until February to gather the data.
Frequently asked questions
At what company size does energy monitoring become worthwhile?
From an economic standpoint, continuous monitoring generally makes sense when annual energy consumption accounts for a double-digit percentage of total costs; in practice, this often begins at the statutory threshold of 2.5 gigawatt-hours. Smaller businesses can often achieve a significant portion of the benefits simply by taking spot measurements of their largest energy consumers, such as compressed air and refrigeration systems, without investing in a comprehensive system. Investing in a comprehensive system pays off when multiple locations or numerous systems need to be compared and individual measurements no longer provide a complete picture.
Does an energy audit replace an energy management system?
No, they both fulfill different legal obligations. The energy audit required under the Energy Services Act is a recurring snapshot, due at least every four years, and may be based on estimates from individual consumers. An energy management system in accordance with ISO 50001, on the other hand, requires ongoing data collection and evaluation and becomes mandatory for annual consumption of 7.5 gigawatt-hours or more, with annual monitoring rather than a one-time report. Those who already measure consumption continuously usually fulfill the audit requirement automatically and can also use the same data for grant applications and internal prioritization.
How long does it take to set up an energy monitoring system?
For the ten to twenty largest energy consumers at a site, a basic monitoring system can usually be set up within a few weeks, provided that meters and interfaces are already in place on the control system. If this infrastructure is missing, the time required to retrofit sensors for compressed air, refrigeration, or process heat must be added, typically another four to eight weeks per location. It generally takes twelve months before reliable year-over-year comparisons and seasonal patterns become apparent, regardless of how quickly the technology was installed.
With Jouvoli, torck offers a TÜV-certified platform compliant with ISO 50001 to businesses that want to reduce their energy costs without having to set up their own energy management department. The platform collects consumption data for each system, sorts it by cost relevance, and thereby provides the basis for both subsidy applications and the annual waste heat report. Details on implementation can be found on the website Jouvoli.
This article discusses legislation and regulations as context for technical decisions. It does not constitute legal advice. Consult your legal team or external counsel about whether and how a particular rule applies to your organisation.